Sec. 26-46. - Final plats—Major subdivisions.
(a) Filing procedure. The applicant shall file the following with the director 15 days prior to the commission meeting at which the final plat for a major subdivision is to be reviewed: (1) A digital copy of the proposed final plat; (2) A digital copy of the additional information required pursuant to subsection (b) hereunder; (3) A completed application form; (4) The applicable fees for filing and recording the plat, and for review of the construction plans; and (5) An agreement in writing on a form provided by the city attorney that the developer will install all of the improvements required herein. A final plat shall not be accepted for review after the date of expiration of the preliminary plat. (b) Information required. The final plat shall be prepared at a scale of no greater than one inch equals one hundred feet (1" = 100') with a maximum size of 24" × 36" or those dimensions required by the county department of records. The final plat shall show or have attached the following information: (1) Name of the subdivision; (2) Date, scale and north arrow; (3) Total acreage of the proposed subdivision; (4) The location of survey monuments "referenced in" on the ground so that they can be reproduced in the field; (5) The state plane coordinates tied to the city's geographic information system (GIS); (6) The location by section, township, range, county and state, including descriptive boundaries of the subdivision; (7) Abstract of title or other certificate establishing ownership interests and proof that proper parties have signed the plat for all land in the subdivision; (8) The lines, profiles, typical sections and grades of all proposed streets, (which include sidewalks), and their widths and names; (9) An accurate delineation of any property offered for dedication to the city or another public entity for public use; (10) The boundary lines of all adjoining lands for a distance of 100 feet and showing (with dotted lines) the right-of-way lines and adjacent streets and alleys with their widths and names; (11) Building lines and easements for rights-of-way provided for public use, services or utilities, with figures showing their dimensions and listing uses that are being provided; (12) All dimensions and bearings, both linear and angular, radii and arcs, necessary for locating the boundaries of the subdivision, blocks, lots, streets, easements, building lines and other areas to be dedicated for public or private use. The linear dimensions are to be expressed in feet and decimals of a foot; (13) Area in square feet for each lot or parcel, which shall equal or exceed applicable zoning ordinance requirements; (14) An accurate drawing of the proposed subdivision; (15) Completed final construction plans conforming with the requirements of these regulations, for all roadway, grading, sanitary sewerage system, storm drainage facilities, water distribution system and other pertinent site improvements. Eight copies of such construction plans shall be submitted with the final plat; (16) A copy of all deed restrictions and/or protective covenants and, if applicable, articles of incorporation and bylaws of a homeowner's association for the proposed subdivision; a copy of any amendments to the restrictions shall be submitted to the city as well; (17) Other information pertaining to the proposed development as may be determined to be necessary from time to time by the commission to facilitate review of the final plat; (18) A certificate from the city finance department indicating that there are no outstanding delinquent taxes, assessments or fees with respect to the property proposed for subdivision and/or the property owner; and (19) Certification by a registered land surveyor, engineer or architect that all details of the plat are correct. (c) Review procedures. The final plat shall conform as closely as possible to the approved preliminary plat. All improvements and facilities to be provided by the developer shall be approved by the director and installed prior to the issuance of any building permit, or adequate security in lieu of making improvements shall be provided in accordance with Section 26-71 of these regulations. All required dedications and easements shall be offered by the developer before the council shall approve the final plat; approval of the final plat shall be as required in subsection 26-46(e). (d) Substantial deviation from preliminary plat. Prior to submitting the final plat to the commission, the subdivision review committee shall review the plat for substantial deviation from the approved or conditionally approved preliminary plat. If the final plat for a subdivision is found to deviate substantially from the approved preliminary plat, the applicant will be required to submit a new final plat if the deviations are eliminated, or a new preliminary plat if the deviations are retained and shall not be insulated against changes in subdivision or other applicable land development regulations occurring between the original preliminary plat approval and the resubmission. Substantial deviations may include, but are not necessarily limited to, the following: (1) A change in the location or design of a public street or sidewalk; (2) A change in the layout of lots or blocks; (3) A change in access to lots; (4) A change in areas, streets, rights-of-way or easements to be reserved or dedicated; (5) A change in the drainage plan which increases the runoff from the tract; (6) A change in the public utilities and facilities to be provided; (7) A change in the location and/or configuration or number of parking spaces serving a multi-family residential development or a non-residential development; (8) A change in the area proposed for annexation, if relevant and applicable; (9) A change in the number and/or size of lots; and (10) A change in the extent of buffering between the proposed subdivision and adjacent areas and/or land uses. (e) Final plat approval. Final plats for major subdivisions wherein dedications are required shall be denied, approved, or approved with conditions by the city council within 60 days of its consideration, and action shall be forwarded to the applicant by written notice from the city clerk. The official minutes of the city council meeting may be provided as written notification of action. Notification of the commission's actions shall be provided to the applicant within 60 days of consideration and shall be provided through the official minutes of the meeting. (f) Guidelines for decision. The commission shall consider the following criteria in making a decision on the final plat: (1) That the final plat substantially conforms to the approved preliminary plat or corresponding phase thereof and any conditions and exceptions granted pursuant thereto. (2) That the final plat conforms to all applicable requirements of these regulations, the zoning ordinance and other applicable land development regulations. (3) That all submission requirements of these regulations have been satisfied. (g) If the proposed final plat is approved, the director shall sign the plat. The applicant may then file and record the plat pursuant to subsection 26-46(i). If the proposed final plat is disapproved, the secretary of the commission shall, within ten days of the commission action, record the reasons for disapproval in the minutes of the commission meeting, notify the applicant in writing of the action and the reasons therefore and return the final plat to the applicant. (h) Effect of final plat approval. Final plat approval shall confer upon the applicant, for a period of five years from the date of approval, the right to apply for building permits and to develop the subject tract or parcel pursuant to the terms and conditions pursuant to which the final plat approval was granted by the commission or council; provided, however, that no final plat shall be filed and recorded unless and until approval by the commission/council has been endorsed thereon. No lot in the subdivision may be sold until the final plat and construction plans have been approved and the plat has been officially recorded. If the final plat is not recorded within 90 days after approval by the commission/council, the commission/council shall formally request the applicant to explain the extenuating circumstances preventing recordation of the final plat. The commission/council shall then determine whether provision of an extension would serve the best interests of the city. If these findings are negative, the commission/council shall revoke approval of the final plat and shall so notify the applicant, the city clerk and the county recorder of deeds. (i) Filing and recordation. Within 90 days following final plat approval by the commission, the three reproducible copies; two paper and one mylar, of the final plat shall be filed by the city clerk with the county recorder of deeds; after acknowledgement by the county recorder of deeds one copy shall be retained by the county recorder of deeds and two copies shall be returned to the city clerk, one copy to be retained by the city clerk and the other to be transmitted to the director. The applicant shall bear all expenses in connection with the filing of the final plat and the city clerk shall not be required to file the final plat until the applicant has paid the required filing fee. The city clerk shall be under no obligation to file the final plat until the applicable filing fee has been paid by the applicant and the applicant provides proof of acceptance of all dedications as required by the preliminary or final plat approval. If not paid, and if the final plat is, therefore, not filed within 90 days of approval by the commission, the final plat shall be placed on the commission agenda for further action including, but not limited to, revocation of approval and/or imposition of additional conditions. Only after the final plat is filed by the city clerk shall the city clerk notify the county recorder of deeds to record the copy of the final plat retained by the county recorder of deeds. (j) Occupancy permits shall not be issued for any structure within the boundaries of the subdivision until all of the required improvements have been constructed and are available to each lot in the subdivision and have been inspected and approved by the director of public works and transportation. (k) Building permits shall not be issued for any structure within the boundaries of the subdivision until all of the required improvements have been constructed and are available to each lot in the subdivision and have been inspected and approved by the director of public works and transportation, or a designee thereof, or until satisfactory completion security in lieu of construction has been formally accepted by the city. A person may provide written notice to the director of community services, or a designee thereof, that a justifiable hardship would be created by the immediate installation of certain required improvements. The director of community services, or a designee thereof, shall determine if, in fact, a hardship is justified and such justification shall be based on the lack of availability of professional services required to install said improvements. Such lack of availability shall not extend beyond a six month time period. Timely construction of the improvements shall commence within one month following the expiration of this six month hardship period. Justifiable hardships based on any reason other than as noted in this section shall be approved, conditionally approved or denied in accordance with Section 26-130, "variances from the subdivision requirements," or acceptance by the city of satisfactory completion security in lieu of improvements. (l) Partial building permits, as defined in Section 26-25 "partial building permits", may be issued by the chief building official prior to the completion of required improvements. In no event shall a partial building permit be issued without an executed agreement of the type referenced in subsection (m) below. (m) As a condition of the issuance of any permit requested and issued prior to the acceptance by the director of public works and transportation of street, electrical, water, gas, sewer, and other improvements, the developer shall execute a hold harmless and indemnity agreement in a form acceptable to the city attorney. Any such agreement shall provide that the developer agrees to hold harmless and indemnify the city from any cause of action or liability due to city failure to provide any service to the development due to the absence of such improvements.
(Code 1969, §§ 20-5, 20-7, 20-9; G.O. 1264, 2-13-95; G.O. 1438, 7-29-96; G.O. 1757, 3-20-00; G.O. 1766, 5-15-00; G.O. 1815, 2-20-01; G.O. 3013, 11-29-21)
Ask a question about St. Joseph law
Corpus searches the St. Joseph sections it holds and shows the ones that match, with their citations. Free, no sign-in.