20.30.100 - Refilling—Layers—Tamping.
Excavations in any street or alley shall be refilled immediately after the excavation project is completed. The excavation shall be refilled with granular material in a size and thickness determined by the Director of Streets. The refill material shall be compacted with equipment approved by the Director of Streets until the excavation is filled up to the proper line for placing the pavement thereon.
(1994 C., § 20.30.100; Ord. No. 68604, § 11, 3-16-2010.)