For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23.04.160 — Service during building construction

Revised Code of the City of Saint Louis, 2020, Annotated (Supp. No. 11: codified through Ordinance No. 72042, enacted October 30, 2025) · St. Louis Revised Code § 23.04.160

Corpus is an independent public-information project, not the official City of St. Louis website. Stable reference: corpuslaw.us/code/0f42f903-8c33-4e10-9b63-b03f768863ab

23.04.160 - Service during building construction.

When an attachment is made to supply water for a building, the service pipe shall be carried to the inside of the foundation during the construction of such building. Water used during the erection of such building must not be taken from the service pipe between the main end and the foundation wall of the building. Regular stopcock and box shall be placed on this service pipe just inside the curb line.

(1948 C., Ch. 55, § 50; 1960 C., § 547.170; 1994 C., § 23.04.160.)

Ask a question about St. Louis law

Corpus searches the St. Louis sections it holds and shows the ones that match, with their citations. Free, no sign-in.