III — PROCEDURES
D'Iberville Zoning Ordinance (revised September 16, 2025); partial (City-posted PDF; later amendments unverified), D'Iberville, MS · 33 sections. Independent public-information project, not the official City of D'Iberville website.
- § 301 — Procedure for Approval of the Sketch Plat
- § 302 — Procedure for Approval of Preliminary Plat
- § 303 — Procedure for Approval of Final Plat and Replat of an Existing Lot
- § 304 — Construction Plans and Specifications
- § 305 — Recording of the Final Plat
- § 306 — Information on Final Plat
- § 307 — Required Improvements and Standards
- § 309 — Water Distribution System
- § 310 — Sanitary Sewer Collection Systems
- § 311 — Stormwater Sewer System
- § 312 — Private Utility Systems
- § 313 — Easements
- § 314 — Blocks
- § 315 — Lots
- § 316 — Sidewalks
- § 317 — Erosion control
- § 318 — Lighting
- § 319 — Underground wiring
- § 320 — Monuments
- § 321 — Variances
- § 322 — Hearing and Amendments
- § 323 — Authority for Inspection
- § 324 — Engineering Inspection
- § 325 — Public Sites and Open Spaces
- § 326 — Special Provisions
- § 327 — Industrial or Commercial Subdivisions
- § 328 — Private Subdivisions
- § 329 — Decorative Street Sign Posts, Light Poles, and other Appurtenances
- § 330 — Floodplain Areas
- § 331 — Appeals
- § 332 — Penalties
- § 333 — Saving Clause
- § 334 — Effective Date
