310. Sanitary Sewer Collection Systems
310.0 All sewer systems shall be designed, constructed, inspected, and tested in accordance with the applicable and Current Ten State Standards (Recommended Standards for Sewage Works) by the Great Lakes, Upper Mississippi River Board of State Sanitary Engineers, except for more stringent requirements set forth by the appropriate Mississippi State Authorities. 310.1 The subdivider shall connect to the D’Iberville sanitary sewer system or any other public controlled sewage system that may be available. The developer will be responsible for any improvements required so that the existing sanitary sewer system can accommodate the increased demand placed upon it due to the development of the new subdivision. 310.2 Sanitary sewers shall be laid in all street right-of-way easements, service connections installed to property lines and connections made to trunk line sewers. Manholes shall be located at the end of lines, at all changes of grade, direction, or pipe sizes; and within a maximum spacing of 350 feet. Watertight manhole covers shall be specified where rims may be flooded by street runoff or where below the 100-year flood elevation. 310.2.1 "S" shall be stamped into curbs marking the location, as near as possible, each sewer service line. “S” Sewer service designation markers shall be cast into the curbs to provide a flush finish. Markers shall be placed at each service line location. Markers shall be constructed of cast aluminum. Color shall be Green and resist weathering & fading. 310.2.2 "MH" shall be stamped into curbs marking the location, as near as possible, all manhole locations. 301.2.3 The Owner/Developer must provide an approved rain tub for each manhole. 310.2.4 The Owner/Developer is responsible for constructing manhole tie-in and building inverts. 310.2.5 "Dog House" manholes are not permitted in the City of D'Iberville. 310.2.6 All manhole lids shall be stamped “City of D’Iberville”. It is preferred that all manhole lids contain the city logo when installed. The Developer shall contact the Public Works Director for availability of manhole lids bearing the city logo. 310.2.7 Sanitary sewer service lines shall not be located underneath the driveway access of a lot. 310.3 The size and slope of the sewer lines shall be approved by the City. The minimum slope shall be sufficient to provide a velocity of at least two feet per second (2.0 ft/sec). In no case will sewer mains on less than 0.33 percent slope or eight (8) inches in diameter be approved. Gravity flow lines will not have more than a ninety (90) degree turn in direction of flow in any one manhole. Minimum drop through manholes shall be 0.2 feet. 310.4 All sewer pipe shall be manufactured and installed in accordance with the following specifications: a. Polyvinyl chloride (PVC): Pipes shall conform to ASTM designation D-3034-SDR35 or equal and shall have a minimum wall thickness in accordance with ASTM 3034. Force main pipes shall conform to ASTM designation D-2241, 160PSI, (SDR 26). All joints shall be push-on type with the bell being formed integrally with the pipe. Elastomeric gaskets shall be factory installed on each bell by the manufacturer. All compounds used shall be in accordance with ASTM E-1784. All pipe shall be installed in accordance with ASTM D-2321. b. Ductile iron: All pipe shall meet AWWA specifications C-104, C-11O, C-111, C-150, and C-151 for appropriate applications. c. Truss Pipe: Truss pipe shall not be used. d. Cast iron: All pipe shall meet AWWA specifications C-101, C-106, C-110, C-111 for appropriate applications. e. High Density Polyethylene Pipe (HPDE): HPDE may be used for sanitary sewer force mains with the approval of the Building Official. Polyethylene pipe shall be manufactured in accordance with AWWA C901-02 for sizes 1-1/4” through 3” IPS diameters and to the requirements of ASTM D3035. Pipes 4” and above shall be manufactured to the requirements of ASTM F714 and AWWA C906-07. 310.5 Infiltration shall not exceed one hundred (100) gallons per inch diameter per mile per day. 310.6 A City of D'Iberville representative must be present when a manhole is being installed on City right-of-way. 310.7 All sewer lines shall be air tested in accordance with the City of D’Iberville requirements. 310.8 A post construction video of all sewer lines and individual sanitary sewer taps conducted after the installation of all infrastructure and utilities within the subdivision shall be provided to the City of D'Iberville. 310.9 The Owner/Developer shall provide a letter of design approval from the Mississippi Department of Environmental Quality. 310.10 All Lift Stations shall be manufactured and installed in accordance with the following specifications: a. A bypass connection and valve shall be provided on each lift station. b. A spare pump for the lift station shall be provided to the City. c. The Control Panel shall be manufactured by current, approved City vendor per detail drawing and specification. d. There shall be provided by the owner or developer a six (6’-0”) foot tall wooden fence around each lift station with an eight foot (8'-0”) wide opening (2-4' wide gates). e. Each lift station shall have an alarm light and it shall be placed at least one (1) foot above the fencing. It shall remain lit at all times and the alarm should flash to alert a problem. f. A work light shall be located inside lift station fence and the location of said light shall be shown on the appropriate plan sheets. g. Stainless steel bolts and fittings and stainless steel or aluminum rails shall be used throughout lift station. h. There shall be a flapper valve from valve box to well. i. A 1" gate valve shall be located downstream of check valve on all force mains with note: "City will install gauge." j. There shall be three (3) 2" Conduits from panel box to well and seal shown at all fittings. k. The lift station slab shall be 4" thick 3000 psi concrete slab inside fenced lift station area. l. There shall be a minimum 24" clearance in all directions (360°) around all valves, pipes, and fittings inside valve pit. m. A ten-foot-wide access route shall be provided to the front gate of each lift station, including adequate base material and all-weather driving surface. n. Each lift station shall have four (4) floats hanging on stainless steel chain. o. There shall be a ten (10) foot wide access route provided to the front gate of each lift station, including adequate bas material and all-weather driving surface. p. The Owner/Developer shall equip all new lift stations with a Supervisory Control and Data Acquisition (SCADA) system equivalent to and of the same manufacturer as the systems currently in use by the City. Operating costs associated with the SCADA system during the warranty period of the subdivision shall be paid by the Owner/Developer. q. All lift station wet wells shall have a liner placed in the well at the time of construction. The liner utilized shall be warranted for a ten (10) year period with said warranty transferrable to the City of D’Iberville. r. The first manhole located in line with the lift station discharge shall have a liner placed therein at the time of construction. The liner utilized shall be warranted for a ten (10) year period with said warranty transferrable to the City of D’Iberville. 310.11 Locate-wire and plastic warning tape shall be installed above all sewer mains and services 310.12 The Owner/Developer shall be responsible for installing mechanical plugs in new sewer lines at all tie-in manholes. The plugs shall not be removed without prior approval by the City Building Official. 310.13 Sewer service stub-outs shall be a minimum of three (3) feet above the surrounding existing grade. 310.14 The owner of each lot shall be responsible for the installation, operation and maintenance of those components of the sanitary sewer system lying within the boundaries of each lot or otherwise outside of the public right-of-way or publicly dedicated space. The responsibility to install, operate, repair and maintain the components of the sanitary sewer system include, but are not limited to, the service lines, valves, pumps, pump chamber, and other appurtenances associated with the sanitary sewer system. Nothing herein shall relieve any person or property owner from the responsibility of first securing the necessary permits prior to undertaking any installation, repair or alteration to the sanitary sewer system. 310.15 Installation or replacement of grinder pumps. Prior to the initial installation or replacement of any grinder pump system at any private residence or business, the property owner or authorized agent thereof must secure a building permit from the City of D’Iberville. The Building Official shall inspect such grinder pump and verify suitability of such system in accordance with the city’s currently adopted Building Code as the same pertains to sewer systems, sumps, ejector or grinder pumps. The performance criteria, gallons per minute @ total dynamic head of each individual grinder pump system will be specified by the Building Department I City Engineer for each site and or development, respectively. Upon installation of a grinder pump system, a "Notice to All" shall be permanently installed on the cover of the electrical house power box. This "Notice to All" sign will be provided by the City and will include reference information and notice of penalty for any non-compliance issues.
Ask a question about D'Iberville law
Corpus searches the D'Iberville sections it holds and shows the ones that match, with their citations. Free, no sign-in.