For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 900 — ADMINISTRATION

Comprehensive Development Regulations for the City of Flowood; partial · Flowood Development Regulations § 900

Corpus is an independent public-information project, not the official City of Flowood website. Stable reference: corpuslaw.us/code/f11ad387-5947-4df8-b3fa-bc5d68b53c8e

SECTION 900 ADMINISTRATION

900.1 Final approval of plats and other data shall be the responsibility of the Governing Authority as described by law.

900.2 It shall be the duty of the City Engineer to:

a. Consult with the Subdivider at the preapplication conference to provide technical knowledge and professional experience.

b. Review all Subdivision or street maps, plats, construction plans and supplementary data for conformance with the requirements of these regulations and to inform the appropriate City agency or Governing Authority, as required, of his findings.

c. Determine requirements governing the design or construction of required improvements in cases where no City standard exists.

d. Inform the Governing Authority when said Authority is considering Final Plat approval whether the subdivision is in substantial conformance with these regulations.

900.3 The Governing Authority may, from time to time, issue instructions and operating procedures to be followed in the administration of these regulations to the end that the public may be informed, and that approval of plats be expedited.

900.4 No building permits shall be issued by the City for any structure on a lot for which the Final Plat has not been approved and recorded in the manner prescribed herein.

900.5 No building permit shall be issued by the City for any structure on a lot which does not front on a legally established public street, or approved private street, which street must have a right of-way width of not less than fifty (50) feet except in private streets or public streets in existence on the date of this Order.

900.6 No building permit shall be issued by the City for any structure on a lot for which there is not a City approved Lot Grading Plan which conforms to the Subdivision Grading and Drainage Plans.

Ask a question about Flowood law

Corpus searches the Flowood sections it holds and shows the ones that match, with their citations. Free, no sign-in.