§ 414 — WARRANTY OF WORK

Comprehensive Development Regulations for the City of Flowood; partial · Flowood Development Regulations § 414

Corpus is an independent public-information project, not the official City of Flowood website. Stable reference: corpuslaw.us/code/ccdd80fb-e5a3-4b55-9f9c-b59d0a2dce17

SECTION 414 WARRANTY OF WORK

414.1 Warranty for Utilities: Prior to final acceptance by the City of Flowood of the dedicated utilities, the owner/developer must provide a notarized warranty statement on forms furnished by the city for all work performed. The warranty defined herein will begin on the date the final recording plat is approved by the Mayor and board of Aldermen. Prior to the end of the warranty period, an inspection will be performed by the owner, city and city engineer to identify any deficiencies requiring correction under the warranty. All deficiencies so identified must be corrected within 30 days of the initial inspection after which a follow-up inspection will be performed by the owner and director of planning and development. Failure by the owner to correct all noted deficiencies within 30 days of the initial inspection by the city will result in an extension of the owner's warranty until such time as all deficiencies are corrected in a manner satisfactory to the city. The warranty period shall be a period of 12 months.

414.2 Maintenance of Roadway & Warranty Final Wearing Surface: Maintenance of all roadways and curb installed by the Subdivider shall remain the responsibility of the Subdivider until 1 year after the final lift of surface course has been placed. Prior to installation of the final lift of surface course (final wearing surface), an inspection will be performed by the owner, city and city engineer to identify any curb or pavement areas that have failed and need to be replaced prior to placing final lift. All deficiencies so identified must be corrected after which a follow-up inspection will be performed by the owner and director of planning and development. A final lift may be placed once the City has signed off on any repairs that were made. The warranty period for the final wearing course and curb shall be for a period of 12 months from the date of the completed installation of the final lift of surface course.

414.3 At the end of the warranty period for the Final Wearing Surface, the developer shall have his engineer survey and verify that the capacity of the detention/retention pond complies with the design specifications. Any deficiencies shall be corrected prior to the release of the detention/retention pond to the HOA, and prior to the acceptance of the work and release of the warranty by the City of Flowood.