§ 9.8 — Master Development Plan
Gautier Unified Development Ordinance (cover updated June 19, 2025); partial · Gautier Unified Development Ordinance § 9.8
Corpus is an independent public-information project, not the official City of Gautier website. Stable reference: corpuslaw.us/code/fb80f050-36ad-4e94-9832-f07c2254730b
SECTION 9.8: Master Development Plan
9.8.1 Master Plans are required for the following types of development: A. Master Planned Community B. Phased Subdivision Development C. Subdivision Developments which deviate from the adopted design standards of the City D. Conservation Subdivision E. Traditional Neighborhood Development (involving Subdivision of Land) F. Cluster Development (involving Subdivision of Land) G. Planned Unit Development (PUD) 9.8.2. General Information Needed for Master Development Plan The subdivider shall prepare and file with the Planning Director three (3) copies of the Master Plan, at least fifteen (15) days prior to review by the Technical Review Committee drawn at an appropriate scale. Sheet size shall not exceed twenty-four inches by thirty-six inches (24” x 36”). The Master Plan shall be prepared by a licensed professional(s) such as engineer(s), architect(s), and landscape architect(s). The Master Plan shall be clearly marked, and shall show, or have attached thereto, the following data: A. Name, address and contact information for property owner, developer(s), development engineer(s), architect(s), builder(s) and property manager(s). B. Survey of existing property showing existing structures, utilities, protected trees, rights-of-way, easements and adjacent property use and zoning. C. Map showing existing and proposed contour of land with cut and fill calculations. D. Demolition plan for existing structures. E. General Layout (site plan) of proposed development which shows lot dimensions; streets; alleys; utilities; easements; landscaping; table of proposed uses including type and number of housing units; square footages of proposed buildings; location of required off-street parking areas; civic uses and any other pertinent information. F. General Landscaping and Buffering Design Plan. G. Proposed phasing of project. H. Any other information deemed pertinent by the applicant or requested by the City. 9.8.3 Specific Requirements and Procedure for a Planned Unit Development A. Quality of Design Required The proposed development must be designed to produce an environment of stable and desirable character which is in harmony with surrounding land uses and must provide standards for open space, landscaping, creative layout and facilities for traffic control, recreational facilities and adequate parking. Architectural harmony is required for all types of buildings. B. Additional Information Required at Time of Application for a PUD In addition to the requirements for a subdivision given in Article 9.3.2, applications for a PUD shall include: 1. Architectural renderings of all commercial, civic and multi-family uses proposed. 2. Architectural renderings and floor plans for examples of each different type of residential structure that is representative of each. 3. Draft of the legal instrument establishing the Homeowners Association and/or Restrictive Covenants. C. Review by Planning Commission The Planning Commission may impose conditions regarding density, lot sizes, lot size or arrangement, circulation and any other matters that will in their opinion improve the adequacy of the neighborhood or better protect adjacent areas. After any required changes have been made to the Master Plan, Preliminary Plat or architectural design of buildings, the Planning Commission shall hold a final public hearing for the purpose of approval or denial of the PUD. D. Effect of Approval by City Council After approval of the Master Plan, Preliminary Plat and architectural design by the Planning Commission, the Planning Director shall place the proposed subdivision on the agenda of the City Council for their review and approval. Approval of the zoning change to a Planned Unit Development constitutes approval of the Master Plan prepared by the applicant and reviewed as a part of the application. The Master Plan establishes new and specific requirements for land use, residential densities, development regulations and location of specific elements of the development such as open space, landscaping and other elements. The PUD classification replaces any previous zoning district classification on a parcel. E. Minor Amendments and Adjustments to Master Plan prior to Final Plat Approval The Planning Director shall be permitted to approve minor amendments and adjustments to the PUD Master Plan provided the project boundaries are not altered; no additional uses are added; the land allocated to particular uses is not altered more than fifteen percent (15%); housing density is not altered more than ten percent (10%); open space and parks are not decreased; and the height, setback and lots coverage requirements are not substantially altered. F. Duration of PUD approval The approval of a PUD Master Plan by the City Council shall be valid for a period of three (3) years from the date of such approval, after which such plat shall be void, except upon application to and approval by the City Council for an extension not to exceed a maximum of two (2) one (1) year periods. G. Reversion of PUD Zoning and Project Should the Master Plan become invalid due to inaction of the developer or at the request of the developer; the zoning of the property shall revert back to the original zoning classification and the Planning Director shall cause such changes to be made to the Official Zoning Map.
Ask a question about Gautier law
Corpus searches the Gautier sections it holds and shows the ones that match, with their citations. Free, no sign-in.
