§ 11-2 — PLAT AND CONSTRUCTION PLAN APPROVAL
Zoning Ordinance 2026, City of Madison, Mississippi; partial (Official city PDF; publication currency unverified; partial native-text extraction) · Madison Subdivision § 11-2
Corpus is an independent public-information project, not the official City of Madison website. Stable reference: corpuslaw.us/code/0432c68a-7706-4045-b930-ca7d08566702
SECTION 11-2 ~ PLAT AND CONSTRUCTION PLAN APPROVAL
I. PROCEDURE FOR APPROVAL OF PRELIMINARY PLAT Procedure for Approval of Preliminary Plat (Inside or Outside City Limits when connecting to City Utilities) - Twelve (12) copies of the Preliminary Plat shall be submitted to the Department of Planning and Development with a letter requesting approval and also enclosing payment of all required fees. This shall be submitted to the Department of Planning and Development by the submittal deadlines established by the Board of Aldermen. If construction plans are not approved within six (6) months of the Preliminary Plat approval date, the Preliminary Plat approval is revoked. The Preliminary Plat shall contain the following information: A. Title block in right bottom corner showing name of subdivision; B. North arrow, scale and date; C. The names and addresses of the property owner and the engineer and/or surveyor; D. The boundary lines and total acreage of the tract to be subdivided; E. The location, widths, direction/traffic flow and names of all major existing, proposed and/or platted streets and other public ways within and/or adjacent to the tract, railroad right-of-way and other important features, such as section lines, political subdivisions and corporation lines; F. Existing and proposed sewers, water mains, culverts or other underground structures, and easements within the tract and immediately adjacent thereto with pipe sizes and location indicated; G. The Preliminary Plat shall be clearly and legibly drawn at a minimum scale of one inch (1") equals two hundred feet (200'). Minimum sheet size shall be eighteen by twenty-four inches (18" x 24"). If the complete plat cannot be shown on one (1) sheet of this size, it may be shown on more than one (1) sheet with an index map on a separate sheet of the same size. Plats shall be numbered “Sheet 1 of __, Sheet 2 of __,” etc.; H. The layout, number and exact dimensions of proposed lots and existing adjacent land/lot owners; I. The location of all monuments; J. Building setback lines on all lots; K. Private deed restrictions, if any; L. Indicate all flood plains and floodways within and adjoining the proposed development by lot if plat contains different zones. Plat shall reflect site topography with two foot (2') contour intervals National Geodetic Vertical Datum (NGVD). Plat shall reflect the 100-year flood plain limits and the location of the floodway and other requirements for subdivision development in the flood prevention ordinance; establish Finished Floor Elevation (FFE) in floodways; M. Provide street cross sections in accordance with Section 11-4 of the “Subdivision Regulations, City of Madison, Mississippi” and proposed street names; N. Location and construction of sidewalks to be in accordance with Amendment to City Ordinance; O. Proposed density expressed as lots (units) per acre; P. If open space is required, then a statement as to the size required should be provided, show calculations; Q. A vicinity map depicting existing streets, highways, township, range and section designations; R. Show current zoning; S. Submit a final copy of Restrictive Covenants along with the Preliminary Plat (and for recording with the final plat). Approval of the Preliminary Plat by the Department of Public Works and Department of Planning and Development shall not constitute or guarantee approval of the final plat, rather it shall be deemed as authorization to proceed with final construction plans; T. A listing of Construction “Best Management Practices” (BMPs) that are proposed to be utilized during the construction of the subdivision; U. Preliminary plat shall include conceptual compliance requirements of stormwater detention ordinance, erosion control ordinance, landscape ordinance, Storm Water Pollution Prevention Plan (SWPPP) and the zoning ordinance; V. Where required, a road widening easement and width shall be shown; W. Location of construction entrances for all phases (where required) and placement of construction traffic signs shown; X. Minimum square footage of Residences/Buildings (heated and cooled). Y. Show proposed drainage of all lots with direction arrows. II. PROCEDURE FOR APPROVAL OF CONSTRUCTION PLANS After approval by the Mayor and Board of Aldermen of the preliminary plat, three (3) sets of construction plans and specifications shall be submitted to the Public Works Director for preliminary review. All construction plans must be approved before any work starts. Upon receiving preliminary review comments from the Public Works Director and City Engineer, the Developer or his Engineer shall resubmit the corrected set of plans and specifications to the Public Works Director and the City Engineer along with approval letters from all regulatory agencies. All engineering plans and specifications for extensions or modifications to water or sewer systems must be approved by the Mississippi State Department of Health (MSDH) or the Mississippi Department of Environmental Quality (DEQ) prior to beginning construction. When final review has been completed, all corrections made and all approval letters received, the City Engineer will advise the Developer or his Engineer in writing of his plan’s acceptance. Prior to any improvements being made, the Developer must complete a “SUBDIVISION DEVELOPMENT PERMIT” (see exhibit # 2) issued by the Public Works Director. Construction pursuant to the approved construction plans must commence within sixty (60) days of construction plan approval. The developer must maintain steady progress. If the City of Madison determines that the developer is not making steady and acceptable progress the governing authority may, after fifteen (15) days written notice to the developer, revoke all prior approvals for any portion thereof. III. PROCEDURE FOR APPROVAL OF FINAL PLAT After all improvements have been made in accordance with the approved construction drawing and all required fees have been paid, along with a final inspection held by the Public Works Director and the City Engineer, the Developer must submit to the Mayor and Board of Aldermen a letter requesting review and approval of a final plat along with four (4) copies of the final plat and other required documents. The final plat shall be clearly and legibly drawn at a minimum scale of one inch (1") equals two hundred feet (200'). It shall be drawn in permanent ink on a reproducible mylar or other material of equal durability and permanent quality. Sheet size shall be eighteen by twenty-four inches (18" x 24"), and where more than one (1) sheet is required, an index map shall be required on the same size sheet. The final plat shall conform substantially to the preliminary plat as approved. Upon review of the final plat by the Public Works Director and City Engineer, it shall be forwarded to the Mayor and Board of Aldermen recommending approval or disapproval. The final plat shall not be approved by the Mayor and Board of Aldermen until the subdivider has done the following: A. Actually completed construction of all improvements as required in Section 11-3, as approved on the construction plans, or; B. Given the City a performance bond, certified check or letter of credit equal to 200 percent of the total estimated cost of installation of the required improvements, which shall be acceptable by the City. The bond, check or letter of credit shall be for the asphalt wearing surface and/or other items approved by the Public Works Director subject to the condition that the improvements will be completed within one year after approval of the final plat. Performance bond, certified check or letter of credit shall be required on all streets, public or private. Following review by the Mayor and Board of Aldermen a notation of the action taken by the City shall be made on the original and three (3) copies of the final plat, including a statement of the reasons thereof if the final plat is disapproved. Upon approval of the final plat, the subdivider shall have the plat and protective covenants duly recorded in the Office of the Chancery Clerk of Madison County as required by law. No owner or agent of the owner of any land located in a subdivision as defined by these Regulations shall transfer or sell such land before a plat of such subdivision has been duly approved and recorded in the Office of the Chancery Clerk of Madison County, Mississippi. Following the recording of the final plat, two (2) copies of the final plat with all certificates required shall be provided by the subdivider for the records of the Public Works Director. The plat cabinet number, slot number and page numbers where the plat and protective covenants are recorded shall be shown on the copies of the final plat and protective covenants furnished to the Public Works Director.
Ask a question about Madison law
Corpus searches the Madison sections it holds and shows the ones that match, with their citations. Free, no sign-in.
