§ 11-3 — REQUIRED IMPROVEMENTS AND INSPECTIONS

Zoning Ordinance 2026, City of Madison, Mississippi; partial (Official city PDF; publication currency unverified; partial native-text extraction) · Madison Subdivision § 11-3

Corpus is an independent public-information project, not the official City of Madison website. Stable reference: corpuslaw.us/code/dbce252a-102b-400a-aabe-47e5f65ab6d8

SECTION 11-3: REQUIRED IMPROVEMENTS AND INSPECTIONS

The owner of the subdivision shall cause to be constructed and installed the improvements specified in this SECTION. Such construction and installation shall be in accordance with the requirements and specifications set forth by this Subdivision Ordinance. I. POLICY It is hereby declared to be the general policy of the Mayor and Board of Aldermen of the City of Madison to require the proprietor or proprietors or their successors in interest of any subdivision in or addition to the City of Madison, to pay all costs of improvements made to and within such subdivision and to pay all costs of the development and related incidental expenses including, but not limited to, the following: A. Cost of survey and plat, prepared by a professional land surveyor registered in the State of Mississippi; B. Cost of testing laboratory subgrade soil profile for structural design of streets, pavement and in-place material testing; C. Cost of establishing grades prescribed by the City for streets, alleys and sidewalks; D. Cost of construction of sanitary sewer facilities within and into the subdivision; E. Cost of construction of water facilities within and into the subdivision; F. Cost of construction of curb and gutter; G. Cost of street paving for the subdivision, street warning signs and name signs; H. Cost of preparation of all maps on and all reviews and approvals by applicable regulatory agencies for all above improvements. These maps and plans shall be prepared by a professional Engineer registered in the State of Mississippi; I. All costs for plan review and inspections; J. Cost of underground power and street light service; K. Cost of underground telephone service, cable television, gas or other City franchise services. II. MONUMENTS Concrete monuments shall be placed at all corners in alignment along the boundary of the subdivision. Concrete monuments shall consist of 4-inch by 4-inch, or 4-inch diameter, concrete post not less than thirty inches (30") in length, reinforced with a single ½ inch steel rod extending not less than ¼ inch or more than ½ inch above the top of the concrete. Concrete monuments shall be firmly set in the ground to a depth of twenty-four inches (24"), except at street intersections where they shall be set flush with the ground. Markers shall be placed at all lot corners or changes in alignment in lot boundaries. These markers shall consist of iron pins not less than ½ inch in diameter and not less than twenty-four inches (24") in length. Markers shall be set with the top thereof flushed with the finished grade. Where farming operations or other land uses might destroy or disturb the markers, they shall be sunk underground and referenced to permanent landmarks. III. IMPROVEMENTS A. In consideration of the City of Madison's acceptance of any subdivision and assuming the responsibility of maintaining the dedicated streets laid out therein, the developer shall cause to be constructed at no expense to the City of Madison the following minimum improvements in accordance with the approved plans and the specifications and these governing Development Regulations and Amendments and Revisions thereof: 1. Grading of streets and sidewalks shall be for the full width of the right-of-way. All backslopes within or adjacent to the development shall be a minimum of 3:1. Valid exceptions to the grading requirement outside of the improvement area may be granted if necessitated by excessive grade change and/or the excessive removal of large trees which would be caused by the grading of the full right-of-way width providing such is approved by the Public Works Director or City Engineer; 2. Surface drainage of streets shall have approved concrete curb and gutter, except where not required on major arterial streets, with curb inlets, manholes and underground storm sewers with all exposed drains protected from mud and foreign material; 3. Installation of pipe culverts, box culverts, bridges or other drainage structures as required on the approved plans; 4. Excavation of drainage ditches; 5. Topping of subgrades with selected subbase materials as required on the approved plans; 6. Construction of pavement base and surface courses; 7. Grading, dressing and erosion control measures on shoulders and slopes shall be provided until completion of the project and will be inspected by the construction inspector, for the City of Madison and monitored, maintained and repaired by the developer. 8. Construction of sanitary sewer system, including lift stations, and all appurtenances, and connecting sewers to existing sanitary sewers as per plans approved by the City Engineer and the Mississippi Bureau of Pollution Control; 9. Construction of water systems including water mains, services to all lots, fire hydrants, valves, any and all appurtenances per plans approved by the City Engineer and the MSDH. B. All underground utility street crossings shall be installed prior to construction of the base course of the streets, or in lieu thereof, such utility lines shall be directional bored and jacked under the street at a minimum of 18" below surface after the base course has been installed. When the subdivider is ready to install the final wearing surface on the streets, he/she shall not do so until he/she notifies the Public Works Director and receives written approval for the installation from said Public Works Director. C. It shall be the responsibility of the developer to mark or to cause to have marked the “As-built” location of all water and sanitary sewer services to individual lots. All services shall be made available so as not to disturb the street pavement, curb and gutter, or drainage structures when connections are made. All sewer services will extend to the property line a minimum of three feet (3') deep then turn at a 45° angle upward and extend two feet (2') above existing grade. D. After completion of all improvements and notification of this by the Developer’s Engineer of Record, the Public Works Director and or the City Engineer shall make a final inspection of the required improvements. IV. OPTIONAL IMPROVEMENTS While not to be considered as required improvements, it shall be the policy of the Mayor and Board of Aldermen, that any additional improvement such as parks and open space, landscaping, suitably designed retaining walls, nature trails, pedestrian bridges over or around exposed waterways, and any similar improvements which in total would contribute to the livability and desirable visual appearance of the subdivision, are most highly recommended and encouraged. Any proposed improvements within existing or proposed street rights-of-way shall be subject to review by the City Engineer before being approved. V. WARRANTY One Year Warranty: Prior to final acceptance by the City of Madison of the dedicated utilities and streets, a one year warranty shall be given to the City by the Owner for all workmanship performed and materials installed. During the eleventh month, an inspection shall be made by the Owner and Public Works Director or City Engineer to determine any deficiencies to be corrected under warranty. All deficiencies shall be corrected and grounds repaired within thirty (30) days of this inspection or, at the discretion of the city, the bond, certified check or letter of credit shall be renewed for an additional year. VI. INSPECTION AND CERTIFICATION OF REQUIRED IMPROVEMENTS A. The developer shall employ a registered professional engineer, to inspect the improvements as they are installed. This engineer shall then certify to the City Engineer that each improvement has been constructed in accordance with the approved plat and requirements of this Ordinance; B. Upon approval of the construction plans by the City Engineer, with such changes and alterations if any, as may be ordered, and after obtaining a Development Permit issued by the City of Madison Public Works Department, and a clearing and grubbing permit from the Planning Department, the developer may proceed with proposed improvements; C. Upon completion of construction of utilities and improvements, one (1) set of reproducible tracings and two (2) sets of blue prints of complete final plans, dated, signed and certified and stamped “As-built” by the engineer in charge shall be filed with the City of Madison, showing all features as actually installed, including materials, size, location, depth or elevation, numbers, end of lines, connections, ells, valves, storm sewer drains, inlets, and all other pertinent information. All underground facilities, valves, services, and etc., shall be located from two (2) reference points which are approximately 90 degrees apart with distances shown on these plans. Final certifications shall be obtained from the MSDH and the Mississippi Bureau of Pollution Control. One (1) paper copy and one (1) digital copy in Auto Cad format of the above “As-built” plans and certifications shall be furnished the Public Works Director prior to final inspection. There shall be no connections made to such utilities serving the subdivision until the foregoing has been complied with and approved by the City Engineer; D. After completion of all improvements and notification by Developer’s Engineer of Record, the Public Works Director and or the City Engineer shall make a final inspection of the required improvements under Section III of this Ordinance, and any other improvements to be accepted by the City after Certification by the Developer's Engineer that such improvements have been completed in accordance with approved plans and specifications. Unacceptable work, whether the result of poor workmanship, use of defective materials, damage through carelessness or any other cause found to exist prior to final acceptance of the work, shall be removed and replaced in an acceptable manner at no cost to the City of Madison. The City Engineer, acting as the duly authorized representative of the City of Madison and subject to the rules and regulations contained herein, shall decide all questions which may arise as to quality or acceptability of materials furnished or work performed. Such decisions may be appealed to the Mayor and Board of Aldermen and acceptance of each phase shall be binding upon the City subject to correction by the Developer and his contractor of any damage which might occur during subsequent work on other required improvements; E. If the City Engineer has verified that the contracted improvements are complete and free from defect, then upon receipt of the final plat, and any other statements and certificates and/or agreements, the Mayor and Board of Aldermen may vote to accept the dedication of any portion of the required improvements, provided that all statements and agreements specified above have been received for that portion of the improvements.

Ask a question about Madison law

Corpus searches the Madison sections it holds and shows the ones that match, with their citations. Free, no sign-in.