ELO-9 — Submission of Plans and Evidence of Compliance with

Zoning Ordinance 2026, City of Madison, Mississippi; partial (Official city PDF; publication currency unverified; partial native-text extraction) · Madison Exterior Lighting § ELO-9

Corpus is an independent public-information project, not the official City of Madison website. Stable reference: corpuslaw.us/code/926aff6e-68a3-440c-a9f6-e1d69b2524f2

Section ELO-9 Submission of Plans and Evidence of Compliance with

Ordinance, Subdivision Plats (A) Submission Contents. The applicant for any permit required by any provision of the laws of this jurisdiction in connection with proposed work involving outdoor lighting fixtures shall submit (as part of the application for permit) evidence that the proposed work will comply with this ordinance. Even should no other such permit be required, the installation or modification (except for routine servicing and same- type lamp replacement) of any exterior lighting shall require submission of the information described below. The submission shall contain but shall not necessarily be limited to the following, all or part of which may be part or in addition to the information required elsewhere in the laws of this jurisdiction upon application for the required permit: (1) Plans indicating the location on the premises of each illuminating device, both proposed and any already existing on the site; (2) Description of all illuminating devices, fixtures, lamps, supports, reflectors, both proposed and existing. The description may include, but is not limited to catalog cuts and illustrations by manufacturers (including sections where required); (3) Photometric data, such as that furnished by manufacturers, or similar showing the angle of cut off of light emissions. (B) Additional Submission. The above required plans, descriptions and data shall sufficiently complete to enable the designated official to readily determine whether compliance with the requirements of this Ordinance will be secured. If such plans, descriptions and data cannot enable this ready determination, the applicant shall additionally submit as evidence of compliance to enable such determination such certified reports of tests as will do so provided that these tests shall have been performed and certified by a recognized testing laboratory. (C) Subdivision Plats. If any subdivision proposes to have installed street or other common or public area outdoor lighting, submission of the information as described herein shall be required for all such lighting. (D) Lamp or Fixture Substitution. Should any outdoor light fixture or the type of light source therein be changed after the permit has been issued, a change request must be submitted to the designated official for approval, together with adequate information to assure compliance with this Ordinance, which must be received prior to substitution. (E) Plan Review. If the designated official determines that the proposed lighting does not comply with this Ordinance, the permit shall not be issued or the plan approved. (F) Certification. For all projects where the total initial output of the proposed lighting equals or exceeds 70,000 lamp lumens, certification that the lighting, as installed, conforms to the approved plans shall be provided by a registered electrical engineer before the certificate of occupancy is issued. Until this certification is submitted, approval for use of a Certificate of Occupancy shall not be issued for the project.

Ask a question about Madison law

Corpus searches the Madison sections it holds and shows the ones that match, with their citations. Free, no sign-in.