For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14-148 — Stabilization of denuded areas and soil stockpiles

Code of Ordinances, City of Pearl, Mississippi (Supp. No. 2: codified through Ordinance of October 3, 2023) · Pearl Code of Ordinances § 14-148

Corpus is an independent public-information project, not the official City of Pearl website. Stable reference: corpuslaw.us/code/e8f3c407-46b6-4c08-ab06-cc30cf413d4f

Sec. 14-148. - Stabilization of denuded areas and soil stockpiles.

Permanent erosion control measures shall be applied to denuded areas within 15 days after final grade is reached on any portion of the site. Soil stabilization shall also be applied within 15 days to any denuded area which may not be at final grade but will remain dormant (undisturbed by construction activity) for longer than 60 days. Any temporary soil stockpiles shall be stabilized or protected with sediment trapping measures to prevent erosion. Applicable erosion control measures shall include establishment of vegetation, mulching, and the early application of gravel base on areas to be paved. Selected permanent or temporary erosion control measures should be appropriate for such time of year, site conditions, and estimated duration of use.

(Code 1974, § 26-8; Ord. No. 2004-362, § 4, 8-17-2004)

Ask a question about Pearl law

Corpus searches the Pearl sections it holds and shows the ones that match, with their citations. Free, no sign-in.