Sec. 14-154. - Inspections.
(a) Owner's responsibility. It is the responsibility of the site grading permit holder: (1) To provide in writing an anticipated phasing plan and schedule of the land disturbance activities from initiation to completion. The permit holder shall promptly notify the city in writing if there are any changes to the schedule or delays associated with the phasing plan; and (2) To conduct periodic inspections of the installed erosion control measure during construction and of nearby downstream facilities, to determine if the control is effective. Any damage to downhill property caused by erosion, such as clogged storm sewers, inlets or drainage ditches, shall be immediately repaired or cleaned by the permit holder. (b) City oversight. The public works director may enter upon any site and periodically make inspections of any disturbed or graded area before, during and after construction to ensure compliance with the requirements of this article and the authorized land disturbance plan. If the city determines that significant erosion problems or other off-site adverse impacts are occurring on the site despite compliance with approved protective practices, the permit holder shall be required to take additional actions to protect the adversely affected area or prevent the adverse impact. The specifications of the additional measures shall be part of an amendment to the land disturbance plan. (c) Correction of problems by owner. If it is determined by the public works director that the permit holder has failed to comply with the approved plan, a correction notice shall immediately be served upon the permit holder (and owner) in writing, setting forth the measure needed to come into compliance and specifying time for the compliance. Where an immediate threat to public health and safety exists (including, but not limited to, lack of adequate traffic control, or discharge of dust, dirt, mud or debris on public streets) or lack of bond, verbal notice given by the public works director to immediately correct the problem shall be sufficient, but it shall be followed by written notice. Failure to comply within the time specified in the notice shall subject the permit holder to a stop work order for the site which shall remain in effect until the work in progress is in compliance with the specifications of the approved plan. (d) No individual, property owner, person, contractor, trucking firm, driver, equipment operator or other legal entity shall engage in or cause to be performed any land disturbing or dirt moving or hauling activity which will modify the existing grade of any property located in the city, or which may result in increased soil erosion or sedimentation thereon, including, but not limited to, clearing, stripping, grading, excavation, transporting, and filling after being notified orally or in writing that a stop work notice has been issued.
(Code 1974, § 26-14; Ord. No. 2004-362, § 4, 8-17-2004)
Ask a question about Pearl law
Corpus searches the Pearl sections it holds and shows the ones that match, with their citations. Free, no sign-in.