For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14-80 — Specific standards for riverine zones

Code of Ordinances, City of Pearl, Mississippi (Supp. No. 2: codified through Ordinance of October 3, 2023) · Pearl Code of Ordinances § 14-80

Corpus is an independent public-information project, not the official City of Pearl website. Stable reference: corpuslaw.us/code/10c073a4-fe6c-480f-bd7b-9e1ce8369e5b

Sec. 14-80. - Specific standards for riverine zones.

In all areas of special flood hazard designated on the community's FIRM, where base flood elevation data have been provided (excluding CHFA and coastal AE zone), as set forth in section 14-27 the following provisions, in addition to the standards of section 14-77, are required: (1) Residential construction. New construction and substantial improvement of any residential building (including a manufactured home) shall have the lowest floor (including basement) elevated to 18 inches above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, flood openings sufficient to automatically equalize hydrostatic flood forces on exterior walls of enclosures that are subject to flooding, shall be provided in accordance with standards of section 14-77. (2) Nonresidential construction. New construction and substantial improvement of any commercial, industrial, or nonresidential building (including a manufactured building) shall have the lowest floor (including basement) elevated to 18 inches above the base flood elevation. Buildings located in all A zones may, together with attendant utility and sanitary facilities, be floodproofed in lieu of being elevated, provided that all areas of the building below the base flood elevation plus a minimum of 18 inches of freeboard are watertight with walls substantially impermeable to the passage of water, and use structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. Dry floodproofing is allowed only where flood velocities are less than or equal to five feet per second. A registered professional engineer or architect shall certify that the standards of this subsection are satisfied. A flood emergency operation plan and an inspection and maintenance plan must be provided by the design professional for the building. Such certification shall be provided to the floodplain administrator. (3) In special flood hazard areas with base flood elevations (AE zones) but without floodways, no encroachments, including fill material or structures, shall be permitted unless certification by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community. The engineering certification must be supported by technical data that conforms to standard hydraulic engineering principles. (4) Enclosures. New construction and substantial improvements that include fully enclosed areas formed by foundation and other exterior walls below the lowest floor shall be designed to preclude finished living space and designed to allow for the entry and exit of floodwaters to automatically equalize hydrostatic flood forces on exterior walls. Enclosed areas, including crawl spaces, shall be used solely for parking of vehicles, building access, and storage. a. Designs for complying with this requirement must either be certified by a professional engineer or architect or meet or exceed the following criteria: 1. Provide a minimum of two openings, on different sides of each enclosed area; if a structure has more than one enclosed area below the base flood elevation, each shall have openings on exterior walls; 2. The total net area of all openings shall be at least one square inch for each square foot of enclosed area, or the openings shall be designed and the construction documents shall include a statement that the design and installation will provide for equalization of hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwaters; 3. The bottom of all openings shall be no higher than one foot above interior grade (which must be equal to in elevation or higher than the exterior grade); 4. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwaters in both directions and automatically equalize hydrostatic flood loads on exterior walls; b. Access to the enclosed area shall be minimum necessary to allow for parking of vehicles (garage door) or limited storage of maintenance equipment used in connection with the premises (standard exterior door) or entry to the living area (stairway or elevator); and c. The interior portion of such enclosed area shall not be finished or partitioned into separate rooms. (5) Detached storage buildings, sheds, or other like accessory improvements, excluding detached garages, carports, and boat houses, shall solely be used for parking of vehicles and storage. Such storage space shall not be used for human habitation and shall be limited to storage of items that can withstand exposure to the elements and have low flood damage potential. The storage space shall be constructed of flood-resistant or breakaway materials, and equipment and service utilities, such as electrical outlets, shall be limited to essential lighting and other incidental uses, and must be elevated or floodproofed. Flood openings in accordance with the standards of section 14-78(3)a shall also be required. These accessory structures shall be constructed and placed on the building site so as to offer the minimum resistance to the flow of floodwaters. Accessory improvements and other appurtenant structures shall be firmly anchored to prevent flotation that may result in damage to other structures. (6) Standards for manufactured homes and recreational vehicles. a. All manufactured homes placed, or substantially improved, on individual lots or parcels, in existing manufactured home parks or subdivisions, in expansions to existing manufactured home parks or subdivisions, in new manufactured home parks or subdivisions or in substantially improved manufactured home parks or subdivisions, must meet all the requirements for new construction, including elevation and anchoring and the flood openings requirements of section 14-78(3)a. Manufactured homes must be: 1. Elevated on a permanent foundation to have its lowest floor elevated to 18 inches above the base flood elevation; and 2. Securely anchored to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. b. All manufactured homes placed or substantially improved, excepting manufactured homes that have incurred substantial damage as a result of a flood, in an existing manufactured home park or subdivision, must be elevated so that the lowest floor of the manufactured home is elevated to 18 inches above the base flood elevation and be securely anchored to an adequately anchored foundation support system to resist floatation, collapse, and lateral movement. c. All recreational vehicles placed on sites must either: 1. Be on site for fewer than 180 consecutive days and be fully licensed and ready for highway use; or 2. Must meet all the requirements for new construction, including anchoring and elevation requirements of subsection (6)a or b of this section. A recreational vehicle is ready for highway use if it is licensed and insured in accordance with the state motor vehicle regulations, is on its wheels or jacking system, is attached to the site only by quick-disconnect type utilities and security devices and has no permanently attached additions. (7) Floodways. Located within the areas of special flood hazard adopted by reference in section 14-27 are areas designated as floodways. Since the floodway is an extremely hazardous area due to the velocity of floodwaters which carry debris, potential projectiles, and has erosion potential, the following provisions shall apply: a. Encroachments, including fill, new construction, placement of manufactured homes, substantial improvements, and other development, are prohibited except as provided for by this section. b. Excavation and/or dredging and fill shall be allowed only to the extent that the operation does not relocate or alter any watercourse and that all material removed shall not be staged or stored in the floodway and shall be removed from the same. The uses in this subsection shall require an engineering study and certification (no-rise and no adverse impact) and are permissible only if and to the extent that they do not cause any increase/decrease in flood levels during the base flood discharge. c. Existing structures, homes and/or accessory buildings, placed in the regulatory floodway due to a map change, or other event not the fault of the landowner, which were legally permissible structures at the time such map change or event caused the structure to be deemed within the floodway, may be reconstructed or replaced in the event of substantial damage from acts of God, or other events not the fault of the owner, provided such reconstruction or replacement demonstrates, through hydrologic and hydraulic analyses (no-rise and no adverse impact) performed in accordance with standard engineering practice, that the proposed encroachment would not result in any increase/decrease in flood levels within the community during the occurrence of the base flood discharge.

(Ord. No. 2018-01, art. 5, § B, 6-19-2018)

Ask a question about Pearl law

Corpus searches the Pearl sections it holds and shows the ones that match, with their citations. Free, no sign-in.