§ 2.06.1630 — Definitions
Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 2.06.1630
Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/dd404676-e074-4f41-b4c5-fb30d6e40975
Sec. 2.06.1630. - Definitions.
A. The following words, terms, and phrases, when used in this division, have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: 1. "Capacity expanding capital improvements" means improvements that increase the functional capacity of the city's water system, wastewater system, fire protection and emergency medical service system (EMS), or transportation system. This term may include capital improvements that if constructed in advance of development may meet the definition of "project related improvements" when development of adjacent property occurs. 2. "Central Business District" (CBD) means the land area encompassed within the B-3, "Central Business District," zoning district as of November 21, 2024. 3. "Development" means any construction or expansion of a building, structure, or use, any change in use of a building or structure, or any change in the use of land, which creates additional demand for public services. 4. "Development impact fees" means the transportation impact fee, fire protection/EMS impact fee, water impact fee, and wastewater impact fee established by this division. 5. "Encumber" means to legally obligate by contract, or otherwise commit to use by appropriation, or another official act of the city. 6. "Fee schedule" means the listing of the dollar cost of each impact fee as established in the most recent service area report and as adjusted annually for inflation. 7. "Impact fee capital improvement program" means the capital improvements program for the transportation system, the city fire protection/EMS system, and the city water and wastewater systems, which assigns moneys from each impact fee fund to specific projects and related expenses for improvements to the type of facilities or services for which the fees in that fund were paid, and must not include improvements needed to correct existing deficiencies or operations or maintenance costs. 8. "Impact fee coordinator" means the director of the city's department of community development or designee. 9. "Impact fee funds" means the transportation impact fee fund, fire protection/EMS impact fee fund, water impact fee fund, and wastewater impact fee fund established by this division. 10. "Impact fee studies" means the service area reports most recently adopted by resolution of the city commission for each impact fee which set forth reasonable methodologies and analyses for determining the impacts of various types of development on the city's transportation, fire protection/EMS, water and wastewater systems or other services or facilities for which an impact fee may be charged and for determining the cost of acquiring land and the cost of acquiring or constructing facilities and equipment necessary to meet the demands for such services created by new development. 11. "Improvement" means planning, land acquisition, engineering design, construction inspection, on-site construction, off-site construction, equipment purchases, and financing costs associated with new or expanded facilities, buildings, and equipment that expand the capacity of a facility or service system and that have an average useful life of at least ten years. The term "improvement" does not include maintenance, operations, or improvements that do not expand capacity. 12. "Independent fee calculation study" means a study prepared by an applicant for a building permit or water or wastewater connection permit calculating the cost of expansions or improvements to the city's transportation, fire protection/EMS, water, or wastewater systems required to serve the applicant's proposed development; that is performed on an average cost (not marginal cost) methodology; uses the service units and unit construction costs stated in the impact fee service area reports; and is performed in compliance with any criteria for such studies established by this division or by the city. 13. "Initiation of construction" means the date of the preconstruction meeting with the city engineer, or the date of the first visible change in the physical condition of the improved site caused by the first person furnishing services or materials to effect construction of the improvement, whichever occurs first. 14. "Maintenance" means replacement, repair, or caring for a constructed water, sewer, fire protection/EMS, or transportation facility to preserve them in a functional state equal to their initial installed design; and which does not change the basic design or structure or change them from their original purpose. Activities that change the scope of a project beyond the original design are not included in this definition. 15. "Payback district" means a legal mechanism for an entity that installs incidental excess capacity that benefits future development and is not funded by or eligible for impact fees to recapture a proportionate share of the value of installed excess capacity from benefited landowners. 16. "Project-related improvements" means site-related improvements including, without limitation, all access streets including sidewalks adjacent to the proposed development or leading only to the proposed development and not included on the transportation system; all streets, driveways, and pedestrian/bicycle facilities within the development; all acceleration, deceleration, right, or left turn lanes leading to any streets and driveways within the development; all traffic control devices for streets and driveways within the development; all water lines or facilities adjacent to, leading to, or located within the development and serving only the development; all wastewater lines or facilities adjacent to, leading to, or located within and serving only the development; and all off-site improvements necessary for the safety and code compliance of a development. Credit for incidental improvements is not allowed. It is presumed that the minimum improvement needed to serve a project is a project improvement even if additional capacity is thereby created that may be potentially used by other developments presently or in the future. 17. "Reimbursement district" means a legal mechanism to recoup the costs of project-related improvements funded by impact fees as part of initial installation of a larger capacity expanding improvement greater than project-related improvements. 18. "Transportation system" means existing or planned collectors or arterial streets, including associated non-motorized travel elements and which are either included on the most current long range transportation plan or the city's impact fee capital improvement program. 19. "Trip exchange district" means a defined geographic area where there is a demonstrated significant reduction in new vehicle trips below that established in the transportation service area report.
(Ord. No. 2169, § 1(Exh. A), 10-22-2024)
Ask a question about Bozeman law
Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.
