Sec. 2.06.1670. - Water impact fees.
A. Imposition of water impact fees. 1. Any person who seeks to obtain a permit for connection to the city water system, or who is subject to subsection B.2 of this section and applies for a city permit to expand or add to the structure served by a previously approved water connection is required to pay a water impact fee in the amount specified in the commission resolution adopting the water impact fee service area report and establishing the water impact fee and as updated as required in this division; or 2. Any delayed payment of impact fees as specified and approved by the city commission in accordance with division 38.380. 3. No permits for connection to the city water system may be issued until the water impact fee described in this division has been paid, unless the development for which the permit is sought is exempted by subsection F of this section; or unless deferral of payment of the water impact fee has been approved by the city pursuant to a deferral program approved by resolution of the commission in compliance with 2.06.1720. B. Computation of amount of water impact fee. 1. An applicant required by this division to pay a water impact fee may choose to have the amount of such fee determined pursuant to either subsection B.2 or B.3 of this section. 2. The city must determine the amount of the required water impact fee by reference to the most recently adopted water impact fee schedule unless the applicant chooses to submit an individualized calculation pursuant to subsection B.3.a of this section or the city determines the application to be subject to subsection B.3.b of this section. If the applicant is applying for a replacement for a water connection permit issued previously or extension for a permit, then the fee is the net positive difference between the service demand and associated fee applicable at the time of the current permit application and the service demand for which a water impact fee was previously paid pursuant to this division for the same structure. If the fee applicable at the time of the replacement permit application is lower than the water impact fee previously paid pursuant to this division for the same structure, no refund of water impact fees previously paid is allowed. 3. Individualized calculations. a. An applicant may request that the city determine the amount of the required water impact fee by reference to an independent fee calculation study for the applicant's development prepared at the applicant's cost by a professional engineer and/or economist and submitted to the city utilities director. Any such study must be based on the same service standards and unit costs used in the most recently adopted water impact fee study and must document the economic methodologies and assumptions used. (1) Independent fee calculation studies must include documentation of demand, required service standard, and any other relevant data for the proposed land use. (2) Economic studies must include documentation of any special factors that the applicant believes will reduce the service demand otherwise attributable to the proposed land use. (3) The city must consider all such documentation and any independent fee calculation study submitted by the applicant. The city is not required to accept any such study or documentation that the city deems to be inaccurate or unreliable and may request that the applicant submit additional or different documentation for consideration. Any independent fee calculation study submitted by an applicant may be accepted, rejected, or accepted with modifications by the city as the basis for calculating water impact fees. (4) The city will review and determine whether to accept a customized calculation within 90 calendar days of submittal. If accepted, the city will use the customized calculation in assessing the fee and no further correspondence is required. If the city rejects a customized calculation the city will inform the applicant of the reasons in writing. (5) Upon acceptance, or acceptance with modifications, of an independent fee calculation study and documentation, the city will use the formulas and methodology contained within the most recently adopted water impact fee service area report to determine the water impact fee. b. The city may identify a user as having extraordinary demands for water service which are not accurately represented by the average usage which was relied upon by the methodology which generated the calculated charges in the most recently adopted water impact fee service area report. In this circumstance the city must prepare a customized calculation based upon the most recently adopted water impact fee service area report. (1) The impact fee paid for water meters larger than three inches may be adjusted based on actual usage. If usage is greater than 110 percent of anticipated volume during the 12-month period beginning six months after building occupancy is granted by the city, an additional impact fee may be charged, using the same techniques for calculating peak day and storage EDUs and multiplying by the peak day impact fee cost per EDU and the storage impact fee cost per EDU then in effect. The additional impact fee is the positive net demand between a previously calculated impact fee and the impact fee based upon the metered demand. C. Payment of water impact fee. 1. All funds paid by an applicant pursuant to this section must be identified as water impact fees and must be promptly deposited in the water impact fee fund described in subsection D of this section. D. Water impact fee funds. 1. A single water impact fee fund is created, and such fund must be maintained in an interest-bearing account. 2. Such fund must contain those water impact fees collected pursuant to this division and any interest which may accrue from time to time on such amounts. 3. Such fund may also contain reimbursements collected pursuant to section 2.06.1670.F. E. Use of water impact fee funds. The moneys in the water impact fee fund must be used only: 1. To acquire or construct capacity expanding improvements to the city water system; or 2. To pay debt service on any portion of any future general obligation bond issue or revenue bond issue used to finance improvements to the city water system; or 3. As described in section 2.06.1690 or 2.06.1700. F. Water impact fee reimbursement. When the commission determines to fund capacity expanding capital improvements to the water system and the commission determines prior to expenditure of funds for such improvements that, upon future development, such improvements may be considered project related improvements the commission may by resolution create a water impact fee reimbursement district. The resolution creating the district must: 1. Identify the specific water improvements that will be subject to reimbursement if determined at a later date to be a project related improvement; 2. Identify the real property to be included in such district wherein future development may be required to provide reimbursement; 3. Identify the rationale for the commission's determination that such improvements may be considered in the future to be project related improvements; 4. Identify the estimated amount of repayment that will be due from each property, the methodology for adjusting the estimated amount to the actual costs of construction, and the methodology for determining such amount; 5. Identify whether the amount of repayment will account for the time value of the initial expenditure, and if so, describe the calculation methodology; 6. Identify the period the reimbursement district will exist; and 7. Identify the required timing of payment of the reimbursement which may be upon annexation or prior to final subdivision or site plan approval, and in no case later than issuance of a building permit. Prior to adoption of a resolution creating the reimbursement district, the city must provide 15 business days written notice to owners of real property within the proposed district. G. Exemptions from water impact fees. 1. The following types of development are exempt from payment of the water impact fee: a. Alteration or expansion of an existing nonresidential building that does not require an additional or larger water meter; b. Replacement of a nonresidential building or structure of the same size that does not require an additional or larger water meter; c. The reconstruction or replacement of a previously existing residential unit that does not create any additional or larger residential units. 2. The installation of fire lines for fire protection are exempt from payment of the water impact fee. 3. Any such claim for exemption must be made no later than the time when the applicant applies for the first permit of a type listed in subsection A.1 of this section for the proposed development, and any claim for exemption not made at or before that time is waived. 4. The city must determine the validity of any claims for exemption pursuant to the criteria set forth in subsections G.1 and G.2 of this section.
(Ord. No. 2169, § 1(Exh. A), 10-22-2024)
Ask a question about Bozeman law
Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.