Sec. 38.400.110. - Transportation pathways.
A. General. Pathways must be installed in accordance with this chapter, the land use plan, the most recently adopted long-range transportation plan, any adopted citywide park plan, and any adopted individual park master plan, and must comply with City of Bozeman Design and Construction Standards. See also 38.420.070, 38.420.100, and 38.620. B. Pathway categories. The development review committee (DRC) must determine whether a pathway is a transportation pathway or a recreation pathway. For subdivision this determination must be made during the preapplication process. 1. Transportation pathways. Developers must install transportation pathways, to provide adequate active transportation facilities within the development, as part of the required development improvements. Transportation pathways must be ADA accessible, and include the following types of facilities: a. Sidewalks (also see 38.260.050 for sidewalk standards); b. Bicycle facilities; and Class I trails; (1) With the exception of trail corridors within required watercourse setbacks, corridors for Class I trails must be dedicated to the city. The dedicated trail corridor must be at least 25 feet in width to ensure adequate room for the construction, maintenance and use of the trail. Transportation trail corridors cannot be used to satisfy parkland dedication requirements; and c. Pathways that connect community or neighborhood commercial nodes by a reasonably direct route; or d. Pathways that connect major residential, employment, educational, or other service nodes by a reasonably direct route. 2. Recreation pathways. For the definition of recreation pathways, please see 38.420.100.B. C. Related facilities. If pathways are proposed or required, stream crossings and other similar improvements, where necessary, must be installed. Bridge design and construction must comply with City of Bozeman Design and Construction Standards and the City of Bozeman Modifications to Montana Public Works Standard Specifications, and must be submitted to the community development department for review and approval. Any necessary permits for bridges must be obtained by the developer from the appropriate agency prior to installation of the stream crossings. D. Trail requirements. The class of the trail must be determined by the review authority, and the trail must be designed and constructed according to any adopted park or recreation plan, City of Bozeman Design and Construction Standards, and the City of Bozeman Modifications to Montana Public Works Standards Specifications. Trails and bridges must meet ADA specifications for recreational facilities and maintain a natural appearance. Trail plans and specifications must be submitted to the planning and parks departments for review and approval prior to installation. E. Bikeways and boulevard trails. Wherever new streets are to be developed as a result of a development proposal, or wherever existing streets or roads are required to be improved, the developer may be required to incorporate striped bicycle lanes along the shoulder, meeting current AASHTO standards, into the design and construction or improvement of the streets or roads. The decision to install a boulevard trail instead of a bicycle lane must be based on the most recently adopted long-range transportation plan. The review authority may consider exceptions based on the particular characteristics of a transportation corridor and recommendations from the DRC and the Bozeman Area Bicycle Advisory Board. Boulevard trails and bicycle lanes must be designed and constructed in accordance with the most recently adopted long-range transportation plan, and any other applicable city specifications and standards. F. Pathway maintenance. Trails within and adjacent to the proposed development, as well as off-street pathways (i.e., sidewalks and boulevard trails) along external development streets, must be maintained by the developer (including snow removal) in accordance with an approved maintenance plan until 50 percent of the lots within the development are sold. Thereafter, the property owners' association must be responsible for maintenance. The property owners' association may establish an improvement district to collect assessments to pay for the maintenance. G. Pathway easements. Where pathways cross private land or common open space, the proper public access easements must be provided. Public access easements for pathways must be at least 25 feet wide. The director of public works may accept an alternate easement width when said easement is parallel to a road ROW. H. Trails in required watercourse setbacks. Trail corridors within required watercourse setbacks must not be dedicated to the city, and such land may not be used to satisfy parkland dedication requirements. When publicly accessible trails are established within required watercourse setbacks, public access easements at least 25 feet in width must be provided to ensure adequate room for the construction, maintenance and use of the trail. I. Corridors. Corridors for transportation pathways may not be used to satisfy parkland dedication requirements.
(Ord. No. 2025-12, § 4(Exh. A), 12-16-2025)
Ask a question about Bozeman law
Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.