For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 38.740.090 — Plan review decision and record

Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 38.740.090

Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/177fb83c-dcec-4e89-a25f-e43c78f89eb6

Sec. 38.740.090. - Plan review decision and record.

A. If the review authority, after recommendation from applicable advisory bodies and completion of any required public notice, determines the proposed plan complies with the standards and requirements of this chapter and other applicable regulations, the review authority must approve the proposed plan within 15 business days. Upon evidence based findings the review authority may require conditions and safeguards that must be met prior to final approval. Notice of action must be given in writing. 1. When considering the criteria for future phases of a master site plan, other than those for criteria 1—2, the evaluation may be of a more generalized demonstration of compliance, recognizing that a subsequent site plan will be submitted in the future which will provide evidence of specific compliance. B. In establishing the record of the review, the review authority will use the following general outline of subjects: 1. Conformance to this chapter, including the cessation of any current violations; 2. Conformance with all other applicable laws, ordinances and regulations; 3. Conformance with special review criteria for applicable permit type as specified in article 7; 4. Conformance with the zoning provisions of article 2 and article 3, including: a. Allowed uses (38.300); b. Zoning district standards (38.210, 38.220, 38.230, 38.240, 38.250, 38.260); c. General land use standards and requirements (38.310); d. Applicable specific use standards (38.320); e. Wireless facilities; f. Affordable housing provisions (38.330, 38.340) if applicable; and g. Any city approved modifications to standards established by a PUD or PDZ. 5. Conformance with the community design provisions of article 4, including: a. Transportation facilities and access (38.400), notably: (1) The impact of the proposal on the existing and anticipated traffic and parking conditions; (2) Pedestrian and vehicular ingress, egress and circulation, including: (a) Design of the pedestrian and vehicular circulation systems to assure that pedestrians and vehicles can move safely and easily both within the site and between properties and activities within the neighborhood area; (b) Non-automotive transportation and circulation systems design features to enhance convenience and safety across parking lots and streets, including, but not limited to, paving patterns, grade differences, landscaping and lighting; (c) Adequate connection and integration of the pedestrian and vehicular transportation systems to the systems in adjacent developments and general community; and (d) Dedication of right-of-way or easements necessary for streets and similar transportation facilities; (3) Loading and unloading areas; b. Community design and element provisions (38.410), notably: (1) Lot and block standards; (2) Provisions for utilities, including efficient public services and facilities; (3) Site surface drainage and stormwater control; (4) Grading; c. Park and recreational requirements (38.420); 6. Conformance with the project design provisions of article 5, including: a. Compliance with standards for architectural design, building mass, landscaping, historical character, orientation of buildings on the site and visual integration; b. Design and arrangement of the elements of the plan (e.g., buildings, circulation, open space and landscaping, etc.) so that activities are integrated with the organizational scheme of the community, and other approved development and produce an efficient, functionally organized and cohesive development; c. Design and arrangement of elements of the plan (e.g., buildings circulation, open space and landscaping, etc.) in relation to existing natural topography, natural water bodies and water courses, vegetation, and to contribute to the overall aesthetic quality of the site configuration; d. Landscaping, including the enhancement of buildings, the appearance of vehicular use, open space and pedestrian areas, and the preservation or replacement of natural vegetation; e. Open space; f. Lighting; g. Signage; 7. Conformance with environmental and open space standards set forth in articles 4, article 5, and article 6, including: a. Stormwater controls; b. Watercourse and wetland protections; and c. If the development is adjacent to an existing or approved public park or public open space area, public access to and use of that area; 8. Other related matters, including relevant comment from affected parties addressing information not previously addressed at land use plan, establishment of zoning standards or districts, or subdivision. 9. If the development includes multiple lots that are interdependent for circulation or other means of addressing requirements of this chapter, whether the lots are either: a. Configured so that the sale of individual lots will not alter the approved configuration or use of the property or cause the development to become nonconforming; or b. The subject of reciprocal and perpetual easements or other agreements to which the city is a party so that the sale of individual lots will not cause one or more elements of the development to become nonconforming; and 10. Phasing of items listed in 38.740.020.B, including but not limited to buildings and infrastructure. C. Plan approval may be denied upon a determination the application does not meet the standards of this chapter. Persons objecting to the recommendations of review bodies carry the burden of proof. A denial of approval must be in writing. D. If material submitted with an application does not demonstrate full compliance with all requirements a final plan shall be submitted compliant with 38.740.110. E. Following approval of a master site plan, the applicant must submit to the community development department, individual site plans for specific areas within the master site plan. Each subsequent application for a site plan must be consistent with the approved master site plan and standards of this chapter. Evidence that the review criteria have been met through the master site plan review process may be incorporated by reference in order to eliminate duplication of review.

(Ord. No. 2025-12, § 4(Exh. A), 12-16-2025)

Ask a question about Bozeman law

Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.