§ 38.780.030 — Completion of improvements
Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 38.780.030
Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/db69321a-7b54-4a28-87ee-afa1d1bffb36
Sec. 38.780.030. - Completion of improvements.
A. General. The applicant must provide certification by the architect, landscape architect, engineer or other applicable professional that all improvements to be dedicated to the public were installed in accordance with the approved site plan, plans and specifications, or plat as applicable. For required private improvements, the applicant must provide certification by the architect, landscape architect, engineer or other applicable professional that all improvements, including, but not limited to, landscaping, irrigation, ADA accessibility requirements, private infrastructure, and other required elements were installed in accordance with the approved site plan, plans and specifications, or plat as applicable, unless a waiver of certification in whole or part is explicitly approved by the DRC. 1. Improvements to be dedicated to the public. Improvements to be dedicated to the public, such as water mains, sewer mains, parkland and related improvements, landscape, irrigation, and public streets, must be: a. Installed by the developer, or when authorized by the city secured per 38.780.060 and 38.780.080, in accordance with the approved plans and specifications; b. Certified by a registered professional civil engineer, licensed in the State of Montana, or other appropriate professional acceptable to the city; c. Accepted by the cituy prior to the approval of the final plat, building permit, final routing for the review of the issuance of a cerficate of occupancy other identified benchmark as appropriate. d. Provided with city ownership of water rights beneficially used for irrigation of the dedicated parkland. 2. Record drawings. a. Record drawings and project certification complying with the City of Bozeman Design and Construction Standards, including timing for submittal of materials, must be provided by a civil engineer licensed in the State of Montana or other appropriate professional acceptable to the city prior to final plat approval for subdivisions, final routing for occupancy, or release of security associated with the improvements to be dedicated to the public. b. Record drawings complying with the City of Bozeman Design and Construction Standards, including timing for submittal of materials, must be provided prior to final plat approval for subdivisions, final routing for occupancy, or release of security associated with the improvements to be dedicated to the public. (1) Public street or road improvements must be developed to adopted city standards. 3. Public right-of-way lighting. Lighting, as required in 38.560 must be incorporated into all development. Prior to final plat approval, lighting must be installed or secured. If the lighting is secured, it must be considered as part of the required street improvements and building permits must not be issued until the improvements are installed, except when concurrent construction is an identified purpose of the initial project review and approved pursuant to the criteria established in subsection D of this section. 4. Private improvements and other required improvements. Improvements, including, but not limited to, private parks or open space, landscaping, paving, and irrigation must be installed in accordance with the approved preliminary plat or site plan by the developer and inspected and found to comply with the city standards and requirements prior to the approval of the final plat, routing for final occupancy review, or other identified benchmarks as appropriate. All improvements required as part of a subdivision must be installed and accepted, or secured in accordance with an improvements agreement, prior to final plat approval. B. Completion time for subdivisions. 1. Improvements. All subdivision improvements, including parks, must be constructed and completed as approved by the city. a. All public infrastructure improvements must be installed prior to the issuance of a building permit for any lot within a subdivision, except when concurrent construction of public infrastructure and private building improvements is an identified purpose of the initial project review and approved pursuant to the criteria established in subsection D below. b. The subdivider must meet the requirements of either subsection (1) or (2) for completion of street improvements. The option must be specified in the preliminary plat submittal. Should the applicant not identify which option is desired, the option presented in subsection B.1.b.(1) of this section must be required. Altering the choice of option after approval of the development constitutes a material modification to the project and requires re-review of the project for modification to the approval subject to the provisions of 38.100.070. (1) The subdivision public infrastructure improvements must be installed prior to final plat approval. This requirement may be modified by the review authority where dictated by circumstances, such as cold weather conditions that do not permit paving or installation of landscape plantings, and where acceptable security for the ultimate development of the public infrastructure is provided; or (2) The subdivider must enter into an improvements agreement guaranteeing the completion of the paving, curb, gutter, storm drainage, street lighting, sidewalks, required boulevard landscape and irrigation, or other street infrastructure improvements not yet completed. The improvements agreement must provide security, as explained in this division. However, at a minimum, the plans and specifications for the street improvements must be approved by the review authority prior to final plat approval. Building permits will not be issued until the street improvements are completed and accepted by the city, except when concurrent construction is an identified purpose of the initial project review and approved pursuant to the criteria established in subsection D of this section. C. Completion time for site development. Whenever any building lots or building sites are created inside the city limits, municipal water distribution systems, municipal sanitary sewer collection systems, streets, and stormwater collection, treatment, and detention or retention systems must be provided to the lot or site. Each building site must utilize and be connected to both the municipal water distribution and municipal sanitary sewer collection systems. Subject to the provisions of subsection 1. below, these improvements must be designed, constructed, and installed according to the standards and criteria as adopted by the city and approved by the review authority prior to the issuance of any building permits, except when concurrent construction is an identified purpose of the initial project review and approved pursuant to the criteria established in subsection D below. 1. Provision of municipal central water distribution, municipal sanitary sewer collection systems, streets, and stormwater systems means that the criteria in either a. or b. below are met as follows: a. Water, sewer, stormwater, and street services are installed and accepted by the city with service stubs being extended into the site, with such stubs being of adequate size to provide water and sewer service to the proposed development without modification to publicly owned infrastructure; or b. The water mains, sewer mains, stormwater system, and streets to be extended to provide service to the development are located within a publicly dedicated right-of-way or easement; will be constructed to city standards; are physically adjacent to the site proposed for construction; will be installed and are subject to acceptance by the city; and will be adequate in capacity to provide necessary service to the proposed development; and c. Water mains, sewer mains, stormwater system, and streets must meet all of the following requirements: (1) Any required on-site or off-site extensions of water mains, sewer mains, stormwater system, or streets to be dedicated to the public: must be located entirely within publicly held easements or rights-of-way; must serve only a single lot; are the subject of an irrevocable offer of dedication to the city upon completion of the project; the development is under the control of a single developer who must retain control of the entire project until final completion; all work is under the supervision of a single general contractor; and no subdivision of land is involved; (2) The DRC must determine when the standards of this subsection C.1 are met. The fire department must consider whether adequate fire protection services are available from existing hydrants, and water supply exists to meet needs during construction. If adequate fire protection does not exist then concurrent infrastructure and development construction may not occur. Based on evaluation by the fire department, simultaneous construction of infrastructure to be dedicated to the public and private development construction may be permitted only within a defined portion of the site; (3) Approval of the final engineering design, including location and grade, for the infrastructure project must be obtained from the engineering department, and the Montana Department of Transportation when applicable, and Montana Department of Environmental Quality when applicable, prior to issuance of any building permit for the development; and (4) A final occupancy review must not be completed until all on-site and off-site water, sewer, stormwater, and street improvements necessary to serve the site are installed and accepted or approved as applicable by the city. D. Exception for concurrent construction. In certain circumstances, the issuance of a building permit may be allowed prior to completion of the public infrastructure, provided that the following criteria are met, where applicable: 1. The city will have an opportunity to review and approve future proposed development through a site plan review or development is using the incentives of 38.340.030; 2. The property owner must enter into an improvements agreement to ensure the installation of required infrastructure and other applicable improvements, to be secured by any security or securities found in 38.780.080. If a financial security is used, the amount will be determined by the city and in an amount not less than 150 percent of the cost of the improvements verified against city publicly bid unit prices, where such are available. If no publicly bid unit prices are available, an alternate cost estimate acceptable to the city may be used at the City's sole discretion. The security must be in the name of the city and must be at least six months longer than the time of performance required by the improvements agreement; 3. Improvements must be complete within two years of the date of the improvements agreement; 4. Approval of: a. The final engineering design, including location and grade, for any public infrastructure, except parks, must be obtained from the engineering department, Montana Department of Transportation when applicable, and the Montana Department of Environmental Quality when applicable, prior to issuance of any building permit for the development; and b. Final park plan and any associated infrastructure design for parks must be obtained from the parks department prior to issuance of any building permit for the development; 5. Building permits may be issued incrementally, dependent upon the status of installation of the infrastructure improvements. All building construction within the development must cease until required phases of infrastructure improvements as described in the improvements agreement have been completed, and inspected and accepted by the city; 6. The developer must provide and maintain hazard and commercial general liability insurance. Insurance policies must not be canceled without at least 45 days prior notice to the city. The commercial general liability policy must name the city as an additional insured. The developer must furnish evidence, satisfactory to the city, of all such policies and the effective dates thereof; 7. The developer must recognize, acknowledge and assume the increased risk of loss because certain public services do not exist at the site; 8. If public funds or other third party funding will be used to fund all or part of the installation of infrastructure, the improvements agreement between the developer and the city must identify the type or types of predetermined infrastructure funding. Public or third party funding may include, but is not limited to reimbursement, payment up front, creation of a special improvements district, or grants; 9. No occupancy of any structures or commencement of any use constructed or proposed within the boundaries of the development will be allowed until required infrastructure improvements have been completed, inspected, and accepted by the city, city ownership of water rights used to irrigate public parkland is obtained, and a final occupancy review has been completed; a. No occupancy of structures or commencement of any use is allowed when such action would constitute a safety hazard in the opinion of the city; 10. The developer must enter into an agreement with the city to address the provision of any services on an interim basis during construction, if deemed appropriate; 11. The developer must execute a hold harmless and indemnification agreement indemnifying, defending and holding harmless the city, its employees, agents and assigns from and against any and all liabilities, loss, claims, causes of action, judgments and damages resulting from or arising out of the issuance of a building permit under this section; 12. The developer must pay for any extraordinary costs associated with the project which the city may identify, including, but not limited to, additional staff hours to oversee the planning, engineering and construction of the project and infrastructure improvements, inspection of the infrastructure improvements and any extraordinary administrative costs; 13. The development must be under the control of a single developer and all work must be under the supervision of a single general contractor. The developer and general contractor must agree that there must be no third-party builders until required infrastructure improvements have been completed, and inspected and accepted by the city; and 14. Subsequent to preliminary plat or plan approval, a concurrent construction plan, addressing all requirements of this section, must be submitted for review and approval of the community development director in consultation with the city engineer and with a recommendation from the development review committee. E. Limitations. Notwithstanding the provisions of subsection D of this section, the city may limit the scope, type and number of projects eligible for concurrent construction consideration.
(Ord. No. 2025-12, § 4(Exh. A), 12-16-2025)
Ask a question about Bozeman law
Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.