For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 38.780.050 — Acceptance of improvements

Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 38.780.050

Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/df38d58b-bef2-4747-9aeb-e1fb8c182c3c

Sec. 38.780.050. - Acceptance of improvements.

A. Improvements dedicated to the public. 1. Acceptance of street, road, and bridge improvements. Before any subdivision street, whether new or existing, can be accepted into the city street system by the city, it must be built to meet or exceed the required standards. Any improvements made to county roads must meet or exceed standards set by the county road office, and must be reviewed and approved by the county road office. Any bridge improvement, within the city or the county, must meet or exceed standards set by the Montana Department of Transportation and county road office, and must be reviewed and approved by the county road office and the city, and accepted by the county road office into the county's bridge maintenance system. 2. Acceptance of park, water, sewer, storm drainage, landscape and irrigation improvements. Before any public park, water, sewer, storm drainage, and landscape and irrigation improvement, whether new or existing, can be accepted into the city system by the city, it must be built to meet or exceed the required standards. Any improvement must meet or exceed standards set by the city, Montana Department of Environmental Quality, and county road office, as appropriate. Improvements must be reviewed and approved by the city and other agency, as applicable. 3. Record drawings. Record drawings and project certification that all public infrastructure improvements comply with the City of Bozeman Design and Construction Standards must be provided by a civil engineer licensed in the State of Montana and must be submitted prior to final plat approval for subdivisions, per section 24.183.1107(5)(f), ARM as may be amended, or prior to routing for final occupancy review for site development, or other identified benchmark as appropriate. 4. The city may require verification that all liens have been released and payments made prior to accepting dedication of improvements. B. Private improvements. The city or its agent must conduct an "as-built" inspection to verify compliance and must approve final routing for occupancy review, final plat, or other conclusory action if all terms and details of the approval are in compliance. Except as provided in 38.780.060, no final plat approval can be permitted, or approval for final routing for occupancy review, unless the terms and details of an approved plat or site development or sketch plan are met. Prior to routing for final occupancy review, the developer must certify the completion of the improvements as required in 38.780.030.A.

(Ord. No. 2025-12, § 4(Exh. A), 12-16-2025)

Ask a question about Bozeman law

Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.