§ 16-37 — Permit application and fee; extension of time; penalty
Asheville, North Carolina Code of Ordinances (2026 S-5) · Asheville City Code § 16-37
Corpus is an independent public-information project, not the official City of Asheville website. Stable reference: corpuslaw.us/code/3ef053ca-eb62-4732-882b-825323e76670
Sec. 16-37. Permit application and fee; extension of time; penalty.
(a) Each application for a cut permit shall be accompanied by the required permit fee as set forth in the city's fees and charges manual. All fees for cuts within the public rights-of-way shall be set forth in the city's fees and charges manual. (b) If the cut work extends beyond ten working days, excluding weather days, a penalty as set forth herein, shall be assessed in addition to the regular permit fee. A permit may be extended without penalty if extenuating circumstances are encountered. Extenuating circumstances may consist of but not be limited to circumstances that could not be planned for nor reasonably anticipated and beyond the control of the permittee. Provided, however, extenuating circumstance shall not consist of failure of a subcontractor to perform. The city engineer/designee may grant extensions provided the extension is requested in writing at least 48 hours prior to the permit deadline. All extensions must be approved in writing. A weather day shall include the following: (i) when the temperature drops below 32 degrees fahrenheit between the hours of 9 a.m. and 6 p.m.; or (ii) any day that the 24 hour rain accumulation for that day exceeds 0.25 inches; or (iii) any other similarly situated circumstance as determined by the city engineer/designee. (c) If a project is scheduled to last more than ten working days, the permittee shall submit detailed information that defines the scope of the project, a map or sketch showing the precise location of the project, the name of the contact person who will be on site at all times, etc., prior to obtaining a cut permit. (d) Any person who cuts into a public right-of-way without first obtaining the cut permit required by this article, shall be charged a penalty as described below. Provided, however, emergency repair cuts to an existing utility may be made without a permit in hand provided the permit is obtained by the close of the next business day after the cut is made. In the event the emergency work cut permit is not obtained within the time period set forth herein, the penalty as well as the regular permit fee shall apply. (e) Any person/permittee who fails to pay permit cost, including permit fees and penalties shall not be granted any further permits for new construction or installation until the outstanding fees/penalties are paid. (f) It shall remain the sole responsibility of the permittee to provide traffic control per the manual of uniform traffic control devices, located in the city's engineering department. If an entire road is to be blocked during a cut, the permittee must obtain a street blocking permit from the city's traffic engineer before issuance of a cut permit. (g) The penalty for any person/permittee who exceeds the time limit set forth in the cut permit or who fails to timely obtain a cut permit following an emergency repair or who cuts into a public right-of-way without a cut permit shall be as shown in Schedule B (Schedule of Civil Penalties) of this Code. (Code 1965, § 25-14; Ord. No. 1693, 6-14-88; Ord. No. 2242, § 11, 9-26-95; Ord. No. 2593, § 1, 7-27-99; Ord. No. 4333, § 1, 8-26-14)
Ask a question about Asheville law
Corpus searches the Asheville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
