For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16-38 — Restoration; costs

Asheville, North Carolina Code of Ordinances (2026 S-5) · Asheville City Code § 16-38

Corpus is an independent public-information project, not the official City of Asheville website. Stable reference: corpuslaw.us/code/9cd145ae-2964-4c6b-810a-1880640536f9

Sec. 16-38. Restoration; costs.

(a) Any person who shall cut into any street, sidewalk, alley, square or other public right-of-way within the corporate city limits shall restore the cut in accordance with the standards and specification set forth in the city's standard specifications and detail manual as that manual is interpreted by the city's engineer/designee. In any event, the final cut must be rectangular or square in shape. L- or T-shaped cuts are prohibited. Cuts into city streets shall have a full width overlay for any cuts that extend beyond one travel lane or for those streets that have been resurfaced within three years prior to the date of the permit. The total length of the overlay must be a minimum of 35 feet in length. Projects shall be designed to the extent possible, so as not to locate utility poles, hydrants, valves and manholes on sidewalks. (b) The engineering department shall be responsible for conducting periodic inspections of the project during the progress of the work. The permittee shall notify the city engineer/designee when work has been completed and request a final inspection. The city engineer/designee shall make the final inspection to determine that streets, sidewalks, alleys, squares or other public rights-of-way are restored to city standards, and that all debris, materials, tools and equipment are removed therefrom. All cuts shall be warranted by the person, corporation or company making the cut for a period of two years from the date of final approval which warranty shall include an indemnification clause, agreeing to indemnify and hold harmless the city from any such claims during the two-year warranty period. (c) The permittee or person causing the cut shall remain solely responsible for any and all costs incurred in restoring the street, sidewalk or public right-of-way to city standards. (d) Failure to restore. Upon the failure of any person to restore a city street, sidewalk, alley, square or other public right-of-way to city standards, the city will: (1) Provide written notice that the cut is not acceptable. (2) Allow ten days for the person to repair the cut; and (3) Perform a reinspection after ten days. If the work is not completed to city standards, the city engineer/designee will order the completion of the work by the city and recover 120 percent of the actual cost to restore the cut from the permittee in addition to permit fees and penalties already incurred and/or take such other legal action as is necessary to correct the violation. (Code 1965, § 25-14; Ord. No. 1693, 6-14-88; Ord. No. 2593, § 1, 7-27-99)

Ask a question about Asheville law

Corpus searches the Asheville sections it holds and shows the ones that match, with their citations. Free, no sign-in.