Sec. 60-85. - As-built drawings.
(a) The developer, and his/her engineer and/or contractor or his/her designee shall maintain current as-built drawings and survey the location and elevation of the infrastructure during the construction process. As-built drawings shall be maintained and available for inspection, upon the stormwater administrator's request. (b) The engineer shall submit and certify a legible copy of the "as-built" drawings for the review, approval, and recordation to the stormwater administrator upon the completion of construction. (c) As-built drawings shall include, but are not limited to, all of the information submitted on the engineering construction drawings as corrected, as well as the information listed below: (1) General information. a. Road names, as approved by the business and neighborhood services department, shall be identified on the plan view. b. Underground utility location, if not noted, if not identified on the approved engineering plans, or if the exact location not previously identified. Additional information shall be identified on the profile view. c. Relative features, including but not limited to street addresses, property line, natural features, etc. Additional information shall be identified on the plan view. (2) Conveyance-related information. a. Pipes. 1. Location of pipes within right-of-way limits, if changed. Corrections shall be identified on the plan view. 2. Installed distances and slopes. Information shall be identified on the profile view. 3. Pipe type and size, if changed. Corrections shall be identified on the profile view. 4. Bore casing sizes and distances. Information shall be identified on the plan view. 5. Details on aerial creek crossings. Information shall be identified on the plan and profile view as needed. 6. Station location of special devices or appurtenances (e.g., anti-seep collars), measured from the downstream structure. Information shall be identified on the profile view. 7. Information concerning distance to other utilities shall be identified on the profile view. 8. Station location of laterals, measured from the downstream structure shall be identified on the plan view. b. Structures. 1. Structure shape, size and inlet type. Information shall be identified on the profile view. 2. Elevations. Information shall be identified on the profile view. i. Inverts in, inverts out, and drop inverts (top and bottom). ii. Inlets and rims. Elevations shall be provided in vertical feet. iii. Overflow structures. Elevations shall be provided in vertical feet. (3) Detention-related information. a. Location of perimeter within right-of-way limits, if changed. Corrections shall be identified on the plan view. b. Perimeter and distances. Information shall be identified on the plan view. c. Installed slopes. Corrections shall be identified on the profile view. d. Distance to other utilities. Information shall be identified on the plan view. e. Corrections to design and performance parameters in approved engineering design package for each BMP as required.
(Ord. No. 07-108, § 1, 12-13-2007)
Ask a question about Concord law
Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.