§ 62-191 — Prohibited and allowable discharges
Code of Ordinances, City of Concord, North Carolina (Supp. 53 Update 2: codified through Ordinance No. 26-83, enacted August 13, 2026 (online updated September 15, 2026)) · Concord Code of Ordinances § 62-191
Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/50afbcd1-f2cb-4cfc-9ce4-88466f97ad7b
Sec. 62-191. - Prohibited and allowable discharges.
(a) Purpose. (1) This section sets forth uniform requirements for direct and indirect contributors into the city's wastewater collection and treatment system for the Water and Sewer Authority of Cabarrus County (WSACC) and enables the appropriate owner to comply with all applicable state and federal laws including the Clean Water Act (33 USC 1251 et seq.) and the general pretreatment regulations (40 CFR 403). (2) The objectives of this section are: a. To prevent the introduction of pollutants and wastewater discharges into the wastewater treatment system which will interfere with the operation of the system or contaminate the resulting sludge; b. To prevent the introduction of pollutants and wastewater discharges into the wastewater treatment system which will pass through the system inadequately treated, into any waters of the state or otherwise be incompatible with the system; c. To promote reuse and recycling of industrial wastewater and sludges from the wastewater treatment system; d. To protect both the city's and WSACC's personnel who may be affected by sewage, wastewater, and sludge in the course of their employment as well as protecting the general public; e. To provide for equitable distribution of the cost of operation, maintenance, and improvement of the wastewater treatment plant; and f. To ensure that the owner(s) of the wastewater collection and treatment system complies with its NPDES or non-discharge permit conditions, sludge use, and disposal requirements and any other federal or state laws to which the wastewater collection and treatment system is subject. (3) This section provides for the regulation of direct and indirect contributors to the wastewater collection and treatment system, through the issuance of permits to certain non-domestic users and through enforcement of general requirements for the other users, authorizes monitoring and enforcement activities, requires user reporting and provides for the setting of fees for the equitable distribution of costs resulting from the program established in this article. (4) This section shall apply to all users of the municipal wastewater system, as authorized by G.S. §§ 160A-312 and/or 153A-275. Except as otherwise provided in this article, the city manager or his designee of the city wastewater system, referred to in the Clean Water Act as a "Publicly Owned Treatment Works" or POTW, (for POTWs owned by WSACC, the executive director) shall administer, implement, and enforce the provisions of this section and shall be responsible for operating and maintaining the wastewater collection and treatment system. By discharging wastewater into the city wastewater system, industrial users located within or outside the city service area agree to comply with the terms and conditions established in this chapter. (5) The city reserves the right to establish limitations and requirements which are more stringent than those required by either state or federal regulation if deemed necessary to comply with the objectives presented in this subsection or the general and specific prohibitions in subsections (2) and (3), as is allowed by 40 CFR 403.4. (b) General prohibitions. No user shall contribute or cause to be contributed into the collection system or POTW, directly or indirectly, any pollutant or wastewater which causes interference or pass through. These general prohibitions apply to all users of the collection system and POTW whether or not the user is a significant industrial user or subject to any national, state, or local pretreatment standards or requirements. (c) Specific prohibitions. No user shall contribute or cause to be contributed into the collection system or POTW the following pollutants, substances, or wastewater: (1) Explosive mixtures. Pollutants which create a fire or explosive hazard in the collection system or POTW including, but not limited to, waste streams with a closed cup flashpoint of less than 140 degrees Fahrenheit (60 degrees Celsius) using the test methods specified in 40 CFR 261.21. (2) Solid or viscous substances. Solid or viscous substances in amounts that will cause obstruction of the collection system or POTW resulting in interference but in no case solids greater than one-half inch in any dimension. Prohibited materials include, but are not limited to: grease, uncomminuted garbage, animal guts or tissues, paunch manure, bones, hair, hides or fleshings, entrails, whole blood, feathers, ashes, cinders, sand, spent lime, stone or marble dust, metal, glass, straw, shavings, grass clippings, rags, spent grains, spent hops, wastepaper, wood, tar, plastic, asphalt residues, lubricating oil, ground paper products, and material from grinders, residues or solids from a pretreatment facility, and similar substances. (3) Petroleum, cutting, or mineral oils. Petroleum oil, non-biodegradable cutting oil, or products of mineral oil origin, in amounts that will cause interference or pass through. (4) Corrosive wastes. Any wastewater having a pH less than 5.0 or more than 9.0 or wastewater having any other corrosive property capable of causing damage to the collection system, POTW, or equipment. (5) Excessive discharge rate and/or concentration. Any wastewater containing pollutants, including oxygen-demanding pollutants, (BOD, etc.) in sufficient quantity, flow, or concentration, either singly or by interaction with other pollutants, to cause interference with the collection system or POTW. (6) Temperature limit. Any wastewater having a temperature greater than 150 degrees Fahrenheit (66 degrees Celsius), or which will inhibit biological activity in the POTW treatment plant resulting in interference, but in no case wastewater which causes the temperature at the introduction into the treatment plant to exceed 104 degrees Fahrenheit (40 degrees Celsius). (7) Toxic gases. Any pollutants which result in the presence of toxic gases, vapors, or fumes within the collection system or POTW in a quantity that may cause acute worker health and safety problems. (8) Trucked or hauled pollutants. Any trucked or hauled pollutants, except at discharge points designated by the owner of the collection system in accordance with subsection (h). (9) Oils and grease. Fats, oils, or greases of animal or vegetable origin in concentrations greater than 100 mg/l unless authorized by the city. (10) Noxious materials. Any noxious or malodorous solids, liquids, or gases, or other wastewater which either singly or by interaction with other wastes are sufficient to create a public nuisance or hazard to life or are sufficient to prevent entry into the sewers for maintenance and repair. (11) Improperly shredded garbage. Garbage that has not been ground or comminuted to such a degree that all particles will be carried freely in suspension under flow, conditions normally prevailing in the public sewers, with no particle greater than one-half inch in any dimension. (12) Radioactive wastes. Any wastewater containing any radioactive wastes or isotopes except as specifically approved by the owner(s) of the collection system and POTW in compliance with applicable state and federal regulations. (13) Toxic substances. Any wastewater causing the treatment plant effluent to violate state water quality standards for toxic substances as described in 15A N.C.A.C. 2B.0200. (14) Unpolluted waters. Stormwater, surface water, groundwater, artesian well water, roof runoff, subsurface drainage, swimming pool drainage, condensate, deionized water, noncontact cooling water and unpolluted industrial wastewater, unless specifically authorized by the owner(s) of the collection system and POTW. Otherwise, no person shall connect or cause to be connected to the sanitary sewer system any inflow sources listed in this section into the collection system. (15) Cloth or textile waste. Any clothing rags, textile remnants or waste, cloth scraps, except fibers of scrap that will pass through a one-fourth-inch mesh screen or its equivalent in screening ability, provided that such fibers do not interfere with the normal operation of the collection system or treatment plant. (16) IOD limit. Any waters or wastes in which the IOD exceeds five mg/l. (17) Fixed solids limit. Any waters or wastes in which the total fixed solids exceed 1,500 mg/l. (18) Excessive residues. Any substance which may cause the POTW's effluent or any other product of the POTW such as residues, sludges, or scums, to be unsuitable for reclamation and reuse or to interfere with the reclamation process. In no case, shall a substance discharged to the POTW cause the POTW to be in noncompliance with sludge use or disposal regulations or permits issued under Section 405 of the Act; the Solid Waste Disposal Act, the Clean Air Act, the Toxic Substances Control Act, or state criteria applicable to the sludge management method being used. (19) Heavy metals. Any waters or wastes containing amounts of arsenic, cadmium, chromium, copper, lead, nickel, zinc, or other heavy metals which exceed national categorical standards, local limits, interfere with treatment efficiency or sludge disposal criteria, or cause the POTW to exceed NPDES permit limitations. (20) Poisons. Any waters or wastes containing cyanide or other such poisonous substances. (21) Interfering solids. Any waters or wastes containing suspended solids of such character and quality that unusual attention or expense is required to handle such materials in the collection system or at the POTW. (22) Color. Any wastewater which imparts color which cannot be removed by the treatment process including, but not limited to, dye wastes and vegetable tanning solutions, which consequently imparts sufficient color to the treatment plant's effluent to render the waters injurious to public health or secondary recreation or to aquatic life and wildlife or to adversely affect the palatability of fish or aesthetic quality or impair the receiving waters for any designated uses. (23) Pretreatment sludges. Any sludges, screenings, or other residues from the pretreatment of industrial wastes. (24) Medical wastes. Any medical wastes, except as specifically authorized in a wastewater discharge permit by the owner(s) of the collection system and POTW. (25) Ammonia compounds. Any material containing ammonia, ammonia salts, or other chelating agents that will produce metallic complexes that interfere with the collection system or wastewater treatment system. (26) Hazardous waste. Any material that would be identified as hazardous waste according to 40 CFR 261 if not disposed of in a sewer except as may be specifically authorized by the owner(s) of the collection system and POTW. (27) Human or animal parts. Recognizable portions of the human or animal anatomy. (28) Toxicity. Wastewater causing, alone or in conjunction with other sources, the treatment plant's effluent to fail a toxicity test. (29) Excessive foaming. Any wastes containing detergents, surface active agents, or other substances which may cause excessive foaming in the collection system or wastewater treatment system. (30) Explosive limit. At no time, shall two successive readings on an explosive hazard meter, at the point of discharge into the system (or at any point in the system) be more than five percent nor any single reading over ten percent of the lower explosive limit (LEL) of the meter. (31) Discharge of untreated wastewater. Within the city utilities, it shall be unlawful for any person to discharge to any outlet, other than a sanitary sewer, any domestic or industrial waste except where suitable treatment has been provided in accordance with provisions of this division or where an appropriate NPDES permit has been obtained. (32) Alkyl Phenol Ethoxylates (APEs). Any compounds containing APEs shall be prohibited due to the inhibiting and toxic effect of APEs on the biological treatment at the POTW. Linear alcohol ethoxylates, a more readily biodegradable surfactant, may be substituted for APEs. (d) Processing or storage. Pollutants, substances, wastewater, or other wastes prohibited by this section shall not be processed or stored in such a manner that they could be discharged accidentally or illegally to the wastewater treatment system. All floor drains located in process or materials storage areas must discharge to the industrial user's pretreatment facility before connecting with the system. (e) Action by owner(s) of the collection system and/or POTW. When the owner(s) of the collection system and/or POTW determine that a user is contributing to the collection system or POTW any of the enumerated substances of subsection (c) of this section in such amounts which may cause or contribute to interference of collection system or POTW operation or pass-through, the owner(s) of the collection system or POTW shall: (1) Advise the user of the potential impact of the contribution on the collection system and/or POTW in accordance with subsection (i); and (2) Take appropriate actions in accordance with subsection (i) for such user to protect the collection system and/or POTW from interference or pass-through. (f) Industrial waste survey and local limits. (1) An industrial waste survey is required prior to a user discharging wastewater containing in excess of the following maximum daily discharge limits: BOD | 300 mg/l COD | 675 mg/l TSS | 175 mg/l NH 3 | 15 mg/l Aluminum | 1.80 mg/l Arsenic | 0.003 mg/l Cadmium | 0.003 mg/l Copper | 0.090 mg/l Chromium | 0.020 mg/l Cyanide | 0.041 mg/l Lead | 0.049 mg/l Mercury | 0.0003 mg/l Nickel | 0.021 mg/l Silver | 0.005 mg/l Zinc | 0.176 mg/l (2) Industrial waste survey information will be used to develop user-specific local limits when necessary to ensure that the POTW's maximum allowable headworks leading is not exceeded for particular pollutants of concern. User-specific local limits for appropriate pollutants of concern shall be included in wastewater permits. The owner of the POTW may impose mass limits in addition to, or in place of, concentration-based limits. (g) Accidental discharge/slug control plans. At least once every two years, the owner of the POTW shall evaluate whether each significant industrial user needs an accidental discharge/slug control plan. The owner of the POTW may require any user to develop, submit for approval, and implement such a plan. Alternatively, the owner of the POTW may develop such a plan for any user. An accidental discharge/slug control plan shall address, at a minimum, the following: (1) Description of discharge practices, including non-routine batch discharges; (2) Description of stored chemicals; (3) Procedures for immediately notifying the owner of the POTW of any accidental or slug discharge, as required by this section; and (4) Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/or measures and equipment for emergency response. (h) Hauled wastewater. Any person engaging in the transport of septage, wastes from chemical toilets or other liquid or semiliquid wastewater, for the purpose of disposal shall be referred to in this subsection as "haulers." Haulers shall be allowed to empty wastewater permitted by this subsection into the sewer system at designated structures located at the POTW, subject to the following limitations and conditions: (1) Before emptying septic tank sludge or wastes from chemical toilets into the sewer system at the POTW, haulers shall have obtained and have in their possession a currently valid permit to provide scavenger service issued by the state DEQ. The number of the permit shall be prominently displayed by the hauler on the cab of the truck or on the tank in which sludge or waste is transported. (2) The hauler must apply for and receive a septage discharge permit from the owner of the POTW, accompanied by the applicable fee prior to discharging to the POTW. By accepting the permit to introduce septic tank sludge and chemical toilet wastes derived only from domestic sources into the sewer system, the hauler agrees to dump or empty such sludge and waste only at designated structures, at such times as are established by the POTW, and to maintain these structures and the area surrounding them in a proper condition of cleanliness. Such waste shall not violate this section or any other requirements established by the owner of the POTW. (3) The hauler shall not empty into the sewer system grease trap wastes. (4) The hauler shall not empty into the sewer system any industrial wastes without prior written approval from the owner of the POTW. The hauler must provide any and all information, including sampling analysis, requested by the wastewater treatment staff. (5) The hauler shall supply with every load a representative sample of the waste being emptied as prescribed by the POTW. The hauler may also be required to provide the name, address, and phone number of the customer from whom the sample was obtained. (6) Upon failure to maintain structures in a proper condition of cleanliness, failure to have a currently valid permit from state DEQ or failure to pay charges due to the POTW as provided in article VI, the POTW may deny a hauler permission to dispose of septic tank sludge and waste from chemical toilets into the sewer system. The POTW will notify the county health alliance and state of such denial of permission to any hauler. (7) Failure of the hauler to comply in accordance with the state-issued permit may result in revocation of permit and/or penalties as provided for in section 62-8 and subsection (i) of this section. (8) User fees shall be established at a rate to recover the cost of treatment and administration of the contract hauler program. Fees and payment policy shall be approved by the appropriate governing body and shall be paid in accordance with the procedure established by the owner of the POTW. (i) Wastewater discharge permit application and issuance. (1) Wastewater dischargers. It shall be unlawful for any person to connect or discharge to the POTW without first obtaining the permission of the owner of the POTW. When requested by the owner of the POTW, a customer must submit information on the nature and characteristics of its wastewater within 30 days of the request. A designee of the POTW owner is authorized to prepare a form for this purpose and may periodically require users to update this information. (2) Wastewater discharge permits. All significant industrial users shall obtain a significant industrial user permit prior to the commencement of construction or operations that will result in a discharge to the POTW. Existing industrial users who are determined by the owner of the POTW to be significant industrial users shall obtain a significant industrial user permit within 180 days of receiving notification of the POTW's determination. Industrial users who do not fit the significant industrial user criteria may at the discretion of the designee of the POTW owner be required to obtain a wastewater discharge permit for non-significant or insignificant industrial users. For purposes of this subsection, construction or operation has commenced if the owner or operator has: a. Begun, or caused to begin as part of a continuous on-site construction program: 1. Any placement, assembly, or installation of facilities or equipment; or 2. Significant site preparation work including clearing, excavation or removal of existing buildings, structures or facilities which is necessary for the replacement, assembly, or installation of new source facilities or equipment; or b. Entered into a binding contractual obligation or the purchase of facilities or equipment that are intended to be used in its operation within a reasonable time. Options to purchase or contracts which can be terminated or modified without substantial obligation under this subsection in accordance with the provisions as stated in 40 CFR 403.3. (3) Significant industrial user determination. All persons proposing to discharge non-domestic wastewater, or proposing to change the volume or characteristics of an existing discharge of non-domestic wastewater shall request from the owner of the POTW a significant industrial user determination. If the owner of the POTW determines or suspects that the proposed discharge fits the significant industrial user criteria, the owner will require that a significant industrial user permit application be filed. (4) Significant industrial user permit application. Users required to obtain a significant industrial user permit shall complete and file with the POTW an application in the form prescribed by the owner of the POTW, and accompanied by the applicable fee in the amount prescribed in the POTW's schedule or charges and fees. Significant industrial users shall apply for a permit within 90 days after notification of the POTW owner's determination). In support of this application, the user shall submit, in units and terms appropriate for evaluation, the following information: a. Name, address, location (if different from the address); b. Volume of wastewater to be discharged on a daily basis and over a specified timeframe; c. Standard industrial classification (SIC) codes for pretreatment, the industry as a whole, and any processes for which categorical pretreatment standards have been promulgated; d. Analytical data on wastewater constituents and characteristics including, but not limited to, those set forth in subsection (f), any of the priority pollutants (Section 307(a) of the Act) that the applicant knows or suspects are present in the discharge as determined by a reliable analytical laboratory, and any other pollutant of concern to the POTW; sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to Section 304(g) of the Act and contained in 40 CFR 136, as amended; e. Time and duration of the indirect discharge; f. Average daily and 30-minute peak wastewater flow rates, including daily, monthly, and seasonal variations, if any; g. Description of all pretreatment facilities, existing and proposed; h. Site plans, floor plans, mechanical, and plumbing plans and details to show all sewers, floor drains, sewer connections, direction of flow, and appurtenances by size, location, and elevation; i. Description of activities, facilities, and plant processes on the premises including all materials which are or could be accidentally or intentionally discharged; j. List of all hazardous or toxic chemicals used in plant processes including information concerning handling, storage, and potential for aqueous contract; k. Number of employees and hours of operation of plant proposed or actual hours of operation of pretreatment system; l. Where known, the nature and concentration of any pollutants in the discharge that are limited by any authority, state or federal pretreatment standards, and a statement regarding whether or not the pretreatment standards are being met on a consistent basis and if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the customer to meet applicable pretreatment standards; m. If additional pretreatment and/or O&M will be required to meet the pretreatment standards; the shortest schedule by which the customer will provide such additional pretreatment. The completion date in this schedule shall not be longer than the compliance date established for the applicable pretreatment standard. The following conditions apply to this schedule: 1. The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the customer to meet the applicable pretreatment standards. No increment in the schedule shall exceed nine months. 2. No later than 14 days following each date in the schedule and the final date for compliance, the customer shall submit a progress report to the owner of the POTW including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay and, if appropriate, the steps being taken by the customer to return to the established schedule. In no event shall more than nine months elapse between such progress reports to the owner of the POTW; n. Each product produced by type, amount, process or processes and rate of production; o. Type and amount of raw materials processed (average and maximum per day); p. If subject to a categorical standard, a baseline monitoring report in accordance with 40 CFR 403.12(b) and 15A N.C.A.C. 2H.0908(a), as outlined in subsection (i)(8); q. Description of current and projected waste reduction activities in accordance with G.S. 143-215.1(g); r. Any other information as may be deemed by the owner of the POTW to be necessary to evaluate the permit application. (5) Application signatories and certification. All wastewater discharge permit applications and customer reports must be signed by an authorized representative of the customer and on file with the WSACC and the city and contain the following certification statement: "I certify under penalty of law that this document and all attachments were prepared under by director or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." (6) Application review and evaluation. The owner of the POTW will evaluate the data furnished by the customer and may require additional information. a. The owner of the POTW shall refer all applications to the POTW staff for review and evaluation. b. Within 30 days of receipt the owner of the POTW shall acknowledge and accept the complete application; or if not complete, shall return the application to the applicant with a statement of what additional information is required. (7) Tentative determination and draft permit. a. The POTW staff shall conduct a review of the application and an on-site inspection of the significant industrial user, including any pretreatment facilities, and shall prepare a written evaluation and tentative determination to issue or deny the wastewater discharge permit. b. If the staff's tentative determination is to issue the permit, the following additional determinations shall be made in writing: 1. Proposed discharge limitations for those pollutants proposed to be limited; 2. A proposed schedule of compliance, including interim dates and requirements, for meeting the proposed limitations; and 3. A brief description of any other proposed special conditions that will have significant impact upon the discharge described in the application. c. The staff shall organize the determinations made pursuant to subsections and of this subsection and the POTW's general permit conditions into a wastewater discharge permit. (8) Permit supporting documentation. The WSACC and/or the city manager or his designee(s) shall prepare the following documents for all significant industrial user permits. a. An allocation table (AT) listing permit information for all significant industrial users, including but not limited to permit limits, permit effective and expiration dates, and a comparison of total permitted flows and loads with division approved maximum allowable loadings of the POTW, including flow, on forms or in a format approved by the division. The AT shall be updated as permits are issued or renewed, and as permits are modified where the permitted limits or other AT information is revised. b. The basis, or rationale, for the pretreatment limitations, including the following: 1. Documentation of categorical determination, including documentation of any calculations used in applying categorical pretreatment standards; and 2. Documentation of the rationale of any parameters for which monitoring has been waived under 40 CFR Part 403.12(e)(2). (9) Final action on wastewater discharge permit applications. a. Concord shall take final action on all applications not later than 90 days following receipt of a complete application. b. Concord is authorized to: 1. Issue a wastewater discharge permit containing such conditions as are necessary to effectuate the purposes of this section and G.S. 143-215.1; 2. Issue a wastewater discharge permit containing time schedules for achieving compliance with applicable pretreatment standards and requirements; 3. Modify any permit upon not less than 60 days' notice and pursuant to subsection (i)(10); 4. Revoke any permit pursuant to subsection (i)(10); 5. Suspend a permit pursuant to subsection (i)(10); and 6. Deny a permit application when in the opinion of the city such discharge may cause or contribute to pass-through or interference of the wastewater treatment plant or where necessary to effectuate the purposes of G.S. 143-215.1. (10) Permit modification. a. Modifications of permits shall be subject to the same procedural requirements as the issuance of permits except as follows: 1. Changes in the ownership of the discharge when no other change in the permit is indicated; 2. A single modification of any compliance schedule not in excess of four months; and 3. Modification of compliance schedules (construction schedules) in permits for new sources where the new source will not begin to discharge until control facilities are operational. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance. b. Within nine months of the promulgation of a national categorical pretreatment standard, the wastewater discharge permit of users subject to such standards shall be revised to require compliance with such standard within the time frame prescribed by such standard. Where a user, subject to a national categorical pretreatment standard, has not previously submitted an application for a wastewater discharge permit as required by subsection (i), the user shall apply for a wastewater discharge permit within 180 days after the promulgation of the applicable national categorical pretreatment standard. c. A request for a modification by the permittee shall constitute a waiver of the 60-day notice required by G.S. 143-215.1(b) for modifications. (11) Permit conditions. a. The city manager or his designee shall have the authority to grant a permit with such conditions attached as he believes necessary to achieve the purpose of this section and G.S. 143-215.1. Wastewater discharge permits shall contain, but are not limited to, the following: 1. A statement of duration (in no case more than five years); 2. A statement of non-transferability; 3. Applicable effluent limits based on categorical standards or local limits, or both; 4. Applicable monitoring, sampling, reporting, notification, and recordkeeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state and local law; 5. Notification requirements for slug loads; and 6. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements and any applicable compliance schedule. b. In addition, permits may contain, but are not limited to, the following: 1. Limits on the average and/or maximum rate and time of discharge, and/or requirements for flow regulation and equalization. 2. Limits on the instantaneous, daily, and monthly average and/or maximum concentration, mass, or other measure of identified wastewater pollutants or properties. 3. Requirements for the installation of pretreatment technology or construction of appropriate containment devices, etc., designed to reduce, eliminate, or prevent the introduction of pollutants into the wastewater treatment system. 4. Development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or non-routine discharges. 5. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the wastewater treatment system. 6. Requirements for installation and maintenance of inspection and sampling facilities and equipment. 7. Specifications for monitoring programs that may include sampling locations, frequency of sampling, number, types and standards for tests, and reporting schedules. 8. Requirements for immediate reporting of any instance of noncompliance and for automatic resampling and reporting within 30 days where self-monitoring indicates a violation. 9. Compliance schedules for meeting pretreatment standards and requirements. 10. Requirements for submission of periodic self-monitoring or special notification reports. 11. Requirements for maintaining and retaining plans and records relating to wastewater discharges as specified in this section and section 62-192 and affording the city manager or his designee, access thereto. 12. Requirements for prior notification and approval by the city manager or his designee of any new introduction of wastewater pollutants or of any significant change in the volume or character of the wastewater prior to introduction in the system. 13. Requirements for the prior notification and approval by the city manager or his designee of any change in the manufacturing and/or pretreatment process used by the permittee. 14. Requirements for immediate notification of excessive, accidental or slug discharges, or any discharge that could cause any problems to the system. 15. A statement that compliance with the permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the terms of the permit. 16. Other conditions as deemed appropriate by the city manager or his designee to ensure compliance with this section, and state and federal laws, rules and regulations. (12) Permits duration. Permits shall be issued for a specified time period not to exceed five years. A permit may be issued for a period less than a year or may be stated to expire on a specific date. (13) Permit transfer. Wastewater discharge permits are issued to a specific user for a specific operation. A wastewater discharge permit shall not be reassigned or transferred or sold to a new owner, new user, different premises or a new or changed operation. (14) Permit reissuance. A significant industrial user shall apply for permit reissuance by submitting a complete permit application in accordance with subsection (i) a minimum of 180 days prior to the expiration of the existing permit. These same permitting procedures may be applied for all other non-domestic discharges, such as insignificant industrial users which do not meet the criteria of a significant industrial user. Wastewater discharge permits for insignificant industrial users shall be issued by the control authority and the city manager or their designee(s).
(Ord. No. 04-17, § 1, 3-11-2004; Ord. No. 12-122, § 3, 12-13-2012; Ord. No. 21-19, § 1, 3-11-2021)
Ask a question about Concord law
Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.