§ 62-192 — Pretreatment
Code of Ordinances, City of Concord, North Carolina (Supp. 53 Update 2: codified through Ordinance No. 26-83, enacted August 13, 2026 (online updated September 15, 2026)) · Concord Code of Ordinances § 62-192
Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/1ea19210-4d71-4bc2-8449-9a305a43ab9e
Sec. 62-192. - Pretreatment.
(a) Pretreatment facilities. Users shall provide wastewater treatment as necessary to comply with this chapter, and wastewater permits issued under this article and article III and shall achieve compliance with all national categorical pretreatment standards, local limits, and the prohibitions set out in this article within the time limitations as specified by the EPA, the state, or the owner(s) of the collection system and/or POTW, whichever is more stringent. Any facilities necessary for compliance shall be provided, operated, and maintained at the user's expense. Users shall not discharge wastewater requiring treatment either directly or indirectly to the city utilities or the POTW without first notifying and obtaining approval from the owner(s) of the collection system and/or POTW. Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the owner(s) of the collection system and POTW for review, and shall be approved by the owner(s) of the collection system and POTW before construction of the facility. The review of such plans and operating procedures shall in no way relieve the user from the responsibility of modifying the facility as necessary to produce an effluent acceptable to the owner(s) of the collection system and POTW under the provisions of this chapter. Any subsequent changes in the pretreatment facilities or method of operation shall be reported to and be approved by the owner(s) of the collection system and POTW prior to the user's initiation of the changes. (b) Additional pretreatment measures. (1) Peak flow restrictions. Whenever deemed necessary, the owner(s) of the collection system and POTW may require users to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage waste streams from industrial waste streams, and such other conditions as may be necessary to protect the collection system and POTW and determine the user's compliance with the requirements of this article. (2) Grease, oil, and sand interceptors. Grease, oil, and sand interceptors shall be provided when, in the opinion of the owner(s) of the collection system or POTW, they are necessary for the proper handling of wastewater containing excessive amounts of grease and oil, or sand; except that such interceptors shall not be required for residential users. All restaurants and slaughtering operations shall have grease interceptors or grease removal facilities. All interception units shall be of type and capacity approved by the city and shall be so located to be easily accessible for cleaning and inspection. Such interceptors shall be inspected, cleaned, and repaired regularly, as needed, by the user at their expense. (3) Flow equalization. The owner(s) of the collection system or POTW may require any person discharging into city utilities or the POTW to install and maintain, on the property and at their expense, a suitable storage and flow-control facility to ensure equalization of flow. A wastewater discharge permit may be issued solely for flow equalization. Such facility shall have a capacity of at least 80 percent of the normal volume of one 24-hour production period of wastewater and outlet to the sewer controlled by a waterworks-type controller, or other approved device, the setting of which shall be directed by the owner(s) of the collection system and POTW. (4) Control manhole. Any person discharging non-domestic wastewater into city utilities and the POTW shall construct and maintain a suitable control manhole to facilitate observation, measurements, and sampling of all wastewater including domestic wastewater from the industry. The control manhole shall be constructed downstream from any treatment, storage, or other approved system at a suitable and satisfactory location and built in a manner approved by the owner(s) of the collection system and POTW. (5) Measuring device. Where a storage tank is not required, the control manhole shall be equipped with a permanent type volume measuring device such as a nozzle, or other device approved by the owner(s) of the collection system and POTW. The manhole shall be installed by the person discharging the wastewater at his own expense and shall be maintained by him so as to be safe, accessible, and in proper operating condition at all times. (6) Interrupted service note. Notice shall be given to the owner(s) of the collection system and POTW when normal industry will be interrupted for 72 hours or longer and wastewater will not be available for discharge, or when a change of process is contemplated or malfunction of the treatment facility occurs or is anticipated that will alter demands on the collection system and wastewater treatment facilities. Normal operations shall include allowance for legal holidays and other announced plant shutdowns. (7) Gas detection meters. Users with the potential to discharge flammable substances may be required to install and maintain an approved combustible gas detection meter. (c) Approval of pretreatment facilities. Plans for the construction of the equalization tank, control manhole, controlling devices, and volume measuring devices shall be approved by the owner(s) of the collection system and POTW prior to the beginning of construction. (d) National categorical pretreatment standards. (1) Users subject to categorical pretreatment standards are required to comply with applicable standards as set out in 40 CFR Chapter 1, Subchapter N, Parts 405-471 and incorporated in this section. (2) Where a categorical pretreatment standard is expressed only in terms of either the mass or the concentration of a pollutant in wastewater, the POTW owner may impose equivalent concentration or mass limits in accordance with 40 CFR 403.6(c). (3) When wastewater subject to a categorical pretreatment standard is mixed with wastewater not regulated by the same standard, the POTW owner shall impose an alternate limit using the combined waste stream formula in 40 CFR 403.6(e). (4) A user may obtain a variance from a categorical pretreatment standard if the user can prove, pursuant to the procedural and substantive provisions in 40 CFR 403.13, that factors relating to its discharge are fundamentally different from the factors considered by EPA when developing the categorical pretreatment standard. (5) A user may obtain a net gross adjustment to a categorical standard in accordance with 40 CFR 403.15. (6) No user shall ever increase the use of process water or, in any way, attempt to dilute a discharge as a partial or complete substitute for adequate treatment to achieve compliance with the limitations contained in the national categorical pretreatment standards, unless expressly authorized by an applicable pretreatment standard, or in any other pollutant-specific limitation developed by the owner of the POTW or the state. (e) Baseline monitoring reports. (1) Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the POTW shall submit to the POTW a report which contains the information listed in subsection (e)(2). At least 90 days prior to commencement of their discharge, new sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall submit to the owner of the POTW a report that contains the information listed in subsection (e)(2). A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged. (2) Users described in subsection (e)(1) shall submit the information set forth as follows: a. Identifying information. The name and address of the facility, including the name of the operator and owner. b. Environmental permits. A list of any environmental control permits held by or for the facility. c. Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operations carried out by such user. This description should include a schematic process diagram that indicates points of discharge to the POTW from the regulated processes. d. Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula set out in 40 CFR 403.6(e). e. Measurement of pollutants. 1. The categorical pretreatment standards applicable to each regulated process. 2. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the owner of the POTW, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in subsection (o). 3. Sampling must be performed in accordance with procedures set out in subsection (o). f. Certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. g. Compliance schedule. If additional pretreatment and/or O&M are required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in subsection (f). h. Signature and certification. All baseline monitoring reports must be signed and certified in accordance with subsection 62-191(i)(5). (f) Compliance schedule progress reports. The following conditions shall apply to the compliance schedule required by subsection (g): (1) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation); (2) No increment referred to in subsection (f)(1) shall exceed nine months; (3) The user shall submit a progress report to the executive director no later than 14 days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule; and (4) In no event shall more than nine months elapse between such progress reports to the owner of the POTW. (g) Reports on compliance with categorical pretreatment standard deadline. Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the POTW, any user subject to such pretreatment standards and requirements shall submit to the owner of the POTW a report containing the information described in subsections (e)(2)d.—f. For users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the user's long-term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production, or other measure of operation, this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with subsection 62-191(i)(5). (h) Periodic compliance reports. (1) All significant industrial users shall, at a frequency determined by the owner of the POTW but in no case less than twice per year (in June and December), submit a report indicating the nature and concentration of pollutants in the discharge that are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. All periodic compliance reports must be signed and certified in accordance with subsection 62-191(i)(5). (2) All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge. (3) If a user subject to the reporting requirement in this section monitors any pollutant more frequently than required by the POTW, using the procedures prescribed in subsection 62-191(i)(10), the results of this monitoring shall be included in the report. (i) Reports of changed conditions. Each user must notify the control authority and city manager or his designee of any planned significant changes to the user's operations or system which might alter the nature, quality, or volume of its wastewater at least 60 days before the change. Failure of the control authority or city manager or his designee to respond does not relieve the industrial user from complying with this ordinance. The permittee shall not begin the changes until receiving written approval from the WSACC and/or the city. (1) The city manager or his designee may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under this subsection 62-191(i). (2) The city manager or his designee may issue a wastewater discharge permit under subsection 62-191(i) or modify an existing wastewater discharge permit under subsection 62-191(i) in response to changed conditions or anticipated changed conditions. (3) For purposes of this requirement, significant changes include, but are not limited to, flow or pollutant increases of 20 percent or greater, and the discharge of any previously unreported pollutants; increases or decreases to production; increases in discharge of previously reported pollutants; discharge of pollutants not previously reported to the control authority; new or changed product lines; new or changed manufacturing processes and/or chemicals; or new or changed customers. (j) Reports of potential problems. (1) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a non-routine, episodic nature, a non-customary batch discharge, or a slug load, that may cause potential problems for the POTW, the user shall immediately telephone and notify the POTW of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user. (2) Within five days following such discharge, the user shall, unless waived by the owner of the POTW, submit a detailed written report describing the causes of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the user of any fines, penalties, or other liability which may be imposed pursuant to this article. (3) A notice shall be permanently posted on the user's bulletin board or other prominent place advising employee's whom to call in the event of a discharge described in subsection (j)(1). Employees shall ensure that all employees, who may cause such discharge to occur, are advised of the emergency notification procedure. (k) Reports from unpermitted users. All users not required to obtain a wastewater discharge permit shall provide appropriate reports to the city manager or his designee as the owner may require. All users classified as non-significant categorical industrial users under section [1.2(a)(54)(F)] shall provide appropriate reports to the city manager or his designee as the city manager or his designee may require. At a minimum, this shall include the annual certification of continuing to meet the non-significant categorical industrial user criteria as required under 40 CFR 403.12(q). (l) Notice of violation/repeat sampling and reporting. If sampling performed by a user indicates a violation, the user must notify the executive director of the WSACC within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the control authority within 30 days after becoming aware of the violation. The user is not required to resample if the WSACC executive director monitors at the user's facility at least once a month, or if the WSACC executive director samples between the users initial sampling and when the user receives the results of this sampling. If the WSACC executive director has performed the sampling and analysis in lieu of the industrial user and the POTW sampling of the user indicates a violation, the WSACC executive director shall repeat the sampling and obtain the results of the repeat analysis within 30 days after becoming aware of the violations, unless one of the following occurs: (1) The WSACC executive director monitors at the user's facility at least once a month; or (2) The WSACC executive director samples the user between their initial sampling and when the POTW receives the results of this initial sampling; or (3) The WSACC executive director requires the user to perform sampling and submit the results to the WSACC executive director within the 30 day deadline of the POTW becoming aware of the violation. (m) Notification of the discharge of hazardous waste. The city prohibits the discharge of any hazardous wastes without notification to and approval by the city manager and the WSACC executive director or their designees. (1) Any user who commences the discharge of hazardous waste shall notify the POTW, the EPA regional office of wastewater management and the state division of waste management, in writing, of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR 261. Such notification must include the name of the hazardous waste as set forth in 40 CFR 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the user discharges more than 100 kilograms of such waste per calendar month to the POTW, the notification also shall contain the following information to the extent such information is known and readily available to the user: an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the waste stream discharge during the calendar month, and an estimation of the mass of constituents in the waste stream expected to be discharged during the following 12 months. All notifications must take place no later than 180 days before the discharge commences. The user shall not begin the discharge until receiving written approval from WSACC. Any notification under this paragraph needs to be submitted only once for each hazardous waste discharge. However, notifications of changed conditions must be submitted under subsection (e). The notification requirement in this subsection does not apply to pollutants already reported by users subject to categorical pretreatment standards under the self-monitoring requirements of subsections (a), (c), and (d). (2) Dischargers are exempt from the requirements of subsection (m)(1), during a calendar month in which they discharge no more than 15 kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specific in 40 CFR 261.30(d) and 261.33(e). Discharge of more than 15 kilograms of non-acute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 216.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the user discharges more than such quantities of any hazardous waste do not require additional notification. (3) In the case of any new regulation under Section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the user must notify the owner of the POTW, the EPA regional office of wastewater management, and state division of waste management of the discharge of such substance within 90 days of the effective date of such regulations. (4) In the case of any notification made under this section, the user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical. (5) This subsection does not create a right to discharge any substance not otherwise permitted to be discharged by this article, a permit issued under this article or any applicable federal or state law. (n) Analytical requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed by a laboratory certified by the state to perform the wastewater analyses in accordance with the techniques prescribed in 40 CFR 136, unless otherwise specified in an applicable categorical pretreatment standard, or unless otherwise performed in accordance with procedures approved by EPA or WSACC and the city. If 40 CFR 136 does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses must be performed in accordance with procedures approved by EPA, WSACC, and the city. Analyses must be performed by a State certified lab for each parameter analyzed, if such certification exists for that parameter. (o) Sample collection. (1) Except as indicated in subsection (o)(2), the user must collect wastewater samples using flow proportional composite collection techniques. If flow proportional sampling is infeasible, the owner of the POTW may authorize the use of time proportional sampling or a minimum of four grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged. In addition, grab samples may be required to show compliance with instantaneous discharge limits. (2) Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides and volatile organic compounds must be obtained using grab collection techniques. (p) Timing. Written reports will be deemed to have been submitted on the date postmarked. For reports that are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern. (q) Recordkeeping. Users subject to the reporting requirements of this division shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this article and any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements. Records shall include the date, exact place, method, and time of sampling, and the name of the person taking the samples; the dates of analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or the POTW, or where the user has been specifically notified of a longer retention period by the owner of the POTW. (r) Compliance monitoring. (1) Monitoring facilities. The POTW requires the user to provide and operate at the user's expense, monitoring facilities to allow inspection, sampling and flow measurement of the building sewer and/or internal drainage systems. The monitoring facility should normally be situated on the user's premises, but the owner of the POTW may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public street or sidewalk area and located so that it will not be obstructed by landscaping or parked vehicles. There shall be ample room in or near such sampling manhole or facility to allow accurate sampling and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the user. Whether constructed on public or private property, the monitoring facilities shall be provided in accordance with the POTW's requirements and all applicable local construction standards and specifications. Construction shall be completed within 90 days following written notification by the POTW. (2) Inspection and sampling. The WSACC will inspect the facilities of any user to ascertain whether the purpose of this article is being met and all requirements are being complied with. Persons or occupants of premises where wastewater is created or discharged shall allow the WSACC and EPA or their representative ready access at all reasonable times to all parts of the premises for the purposes of inspection, sampling, records examination, and copying or in the performance of any of their duties. The WSACC, state, and EPA shall have the right to set up on the user's property such devices as are necessary to conduct sampling, inspection, compliance monitoring, and/or metering operations. Where a user has security measures in force which would require proper identification and clearance before entry into their premises, the user shall make necessary arrangements with their security guards so that upon presentation of suitable identification, personnel from the POTW, the state, and EPA will be permitted to enter, without delay, for the purposes of performing their specified responsibilities. Denial of the access to the user's premises shall be a violation of this section. Unreasonable delays may constitute denial of access. Agents of the WSACC may enter upon the property at any hour under emergency circumstances. (3) Search warrants. If WSACC, the city, the state, or EPA has been refused access to a building, structure, or property, or any part, and is able to demonstrate probable cause to believe that there may be a violation of this section, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program of the POTW designed to verify compliance with this section or any permit or order issued under this article, or to protect the overall public health, safety, and welfare of the community, then WSACC, the city, the state, or EPA may seek issuance of a search warrant from the county superior court. (s) Confidential information. (1) Information and data on a user obtained from reports, questionnaires, permit applications, permits, and monitoring programs from inspections shall be available to the public or other governmental agency without restriction unless the user specifically requests and is able to demonstrate to the satisfaction of WSACC and the city that the release of such information would divulge information, processes, or methods of production entitled to protection as trade secrets of the user. Any such request must be asserted at the time of submission of the information or data. (2) When requested by the person furnishing a report, the portions of a report which might disclose trade secrets processes shall not be made available for inspection by the public but shall be made available upon written request to governmental agencies for uses related to this section, NPDES permit, state permit and/or the pretreatment programs; provided, however, that such portions of a report shall be available for use by the state involving the person furnishing the report. Wastewater constituents and characteristics will not be recognized as confidential information. (3) All records relating to compliance with pretreatment standards shall be made available to officials of the approval authority and EPA upon request. (t) Enforcement. (1) Administrative remedies. a. Notification of violation. Whenever WSACC and/or the city, their employees, agents or contractors finds that any industrial user has violated or is violating this article, wastewater discharge permit, or any prohibition, limitation, or requirements contained therein or any other pretreatment requirement, he may serve upon such person a written notice stating the nature of the violation. Within 30 days from the date of this notice, an explanation for the violation and a plan for the satisfactory correction thereof shall be submitted to the POTW by the user. Submission of this plan does not relieve the discharger of liability for any violations occurring before or after receipt of the notice of violation. b. Consent order. WSACC and/or the city is hereby empowered to enter into consent orders, assurances of voluntary compliance, or other similar documents establishing an agreement with the person responsible for the noncompliance. Such orders will include specification to be taken by the discharger to correct the noncompliance within a time period also specified by the order. Consent orders shall have the same force and effect as an administrative order issued pursuant to subsection (t)(1)d. c. Show cause hearing. WSACC and/or the city may order any industrial user who causes or is responsible for an unauthorized discharge, has violated this section or is in noncompliance with a wastewater discharge permit to show cause why a proposed enforcement action should not be taken. If WSACC and/or the city determine that a show cause order should be issued, a notice shall be served on the user specifying the time and place for the hearing, the proposed enforcement action, the reasons for such action, and a request that the user show cause why this proposed enforcement action should not be taken. The notice of the hearing shall be served personally or by registered or certified mail, return receipt requested, at least ten days before the hearing. Service may be made on any agent or officer of a corporation. The WSACC and/or the city shall review the evidence presented at the hearing and determine whether the proposed enforcement action is appropriate. A show cause hearing under this subsection is not a prerequisite to the assessment of a civil penalty under subsection (s)(2) nor is any action or inaction taken by the WSACC and/or the city under this subsection subject to an administrative appeal under subsection 62-191(i)(10). d. Administrative orders. When the WSACC and/or the city find that an industrial user has violated or continues to violate this section, permits, or orders issued under this section, or any other pretreatment requirement the WSACC may issue an order to cease and desist all such violations and direct those persons in noncompliance to do any of the following: 1. Immediately comply with all requirements; 2. Comply in accordance with a compliance time schedule set forth in the order; 3. Take appropriate remedial or preventative action in the event of a continuing or threatened violation; 4. Disconnect unless adequate treatment facilities, devices, or other related appurtenances are installed and properly operated within a specified time period. Appeals of administrative orders issued in accordance with this subsection shall be as provided in subsection 62-191(i)(10). e. Emergency suspensions. The WSACC and/or the city may suspend the wastewater treatment service and/or wastewater discharge permit when such suspension is necessary in order to stop an actual or threatened discharge which presents or may present an imminent or substantial endangerment to the health or welfare of persons or the environment, interferes with the POTW, or causes the POTW to violate any condition of its NPDES or non-discharge permit. Any user notified of a suspension of the wastewater treatment service and/or the wastewater discharge permit shall immediately stop or eliminate the contribution. A hearing will be held within 15 days of the notice of suspension to determine whether the suspension may be lifted or the user's wastewater discharge permit terminated. In the event of a failure to comply voluntarily with the suspension order, the WSACC shall take such steps as deemed necessary including immediate severance of the sewer connection, to prevent or minimize damage to the POTW system or endangerment to any individuals. The WSACC and/or the city shall reinstate the wastewater discharge permit and the wastewater treatment service upon proof of the elimination of the noncompliant discharge. The industrial user shall submit a detailed written statement describing the causes of the harmful contribution and the measures taken to prevent any future occurrence to WSACC and/or the city prior to the date of the above-described hearing. f. Termination of wastewater discharge permit. Any user who violates the following conditions of this section, or applicable state and federal regulations, is subject to having its wastewater discharge permit terminated: 1. Failure to accurately report the wastewater constituents and characteristics of his discharge; 2. Failure to report significant changes in operations, or wastewater constituents and characteristics; 3. Refusal of reasonable access to the user's premises for the purpose of inspection or monitoring; or 4. Violation of conditions of the permit. Noncompliant industrial users will be notified of the proposed termination of their wastewater discharge permit and will be offered an opportunity to show cause under subsection (t)(1)c. why the proposed action should not be taken. (2) Civil penalties. a. Any user who is found to have failed to comply with any provision of this section, or the orders, rules, regulations, and permits issued under this section, may be assessed a civil penalty of $25,000.00 per day, per violation. b. In determining the amount of the civil penalty, the WSACC and/or the city manager or his designee shall consider the following: 1. The degree and extent of the harm to the natural resources, to the public health, or to public or private property resulting from the violation; 2. The duration and gravity of the violation; 3. The effect on ground or surface water quantity or quality or on air quality; 4. The cost of rectifying the damage; 5. The amount of money saved by noncompliance; 6. Whether the violation was committed willfully or intentionally; 7. The prior record of the violator in complying or failing to comply with the pretreatment program; 8. The costs of enforcement to the WSACC and/or the city manager or his designee. c. Appeals of civil penalties assessed in accordance with this section shall be as provided in subsection 62-191(i)(10). (3) Other available remedies. Remedies, in addition to those previously mentioned in this subsection, are available to the WSACC and/or the city, who may use any single one or combination against a noncompliant user. Additional available remedies include, but are not limited to: a. Criminal violations. The district attorney for the county judicial district may, at the request of the WSACC and/or the city, prosecute noncompliant users who violate the provisions of G.S. 143-215.6B. b. Injunctive relief. Whenever a user is in violation of the provisions of this section or an order or permit issued under this section, the WSACC and/or the city, through the owner's attorney, may petition in the superior court of justice for the issuance of a restraining order or a preliminary and permanent injunction, which restrains or compels the activities in question. c. Water supply severance. Whenever a user is in violation of the provisions of this section or an order or permit issued under this section, water service to the user may be severed and service will only recommence, at the user's expense, after the user has satisfactorily demonstrated ability to comply. d. Public nuisances. Any violation of the prohibitions or effluent limitations of this section or contained in a permit or order issued under this section, is hereby declared a public nuisance and shall be corrected or abated as directed by the owner of the POTW or his designee. Any person creating a public nuisance shall be subject to the provisions of this section governing such nuisances, including reimbursing the POTW for any costs incurred in removing, abating, or remedying such nuisance. (4) Remedies nonexclusive. The remedies provided for in this section are not exclusive. The WSACC and/or the city may take any, all, or any combination of these actions against a noncompliant user. Enforcement of pretreatment violations will generally be in accordance with the POTW's enforcement response plan. However, the WSACC and/or the city may take other action against any user when the circumstances warrant. Further, the owner of the POTW is empowered to take more than one enforcement action against any noncompliant user. (u) Annual publication of significant noncompliance. At least annually, the executive director shall publish in the largest daily newspaper circulated in the service area, a list of those industrial users which were found to be in significant noncompliance, also referred to as reportable noncompliance in 15A N.C.A.C. 2H.0903(b)(1), with applicable pretreatment standards and requirements, during the previous 12 months. (v) Affirmative defense to discharge violations. (1) Upset. a. An upset shall constitute an affirmative defense to an action brought for noncompliance with categorical pretreatment standards if the requirements of subsection (v)(1)b. are met. b. A user wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that: 1. An upset occurred and the user can identify the causes of the upset; 2. The facility was at the time being operated in a prudent and workmanlike manner and in compliance with applicable operation and maintenance procedures; and 3. The user has submitted the following information to the owner of the POTW within 24 hours of becoming aware of the upset (if this information is provided orally, a written submission must be provided within five days): i. A description of the indirect discharge and cause of noncompliance; ii. The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; and iii. Steps being taken and/or planned to reduce, eliminate and prevent recurrence of the noncompliance. c. In any enforcement proceeding, the user seeking to establish the occurrence of an upset shall have the burden of proof. d. Users will have the opportunity for a judicial determination on any claim of upset only in an enforcement action brought for noncompliance with categorical pretreatment standards. e. Users shall control production of all discharges to the extent necessary to maintain compliance with categorical pretreatment standards upon reduction, loss or failure of its treatment facility until the facility is restored, or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power of the treatment facility is reduced, lost or fails. (2) Prohibited discharge standards defense. A user shall have an affirmative defense to an enforcement action brought against it for noncompliance with the general prohibitions in subsection (b) or the specific prohibitions in subsections 62-191(c)(2), (3), (5)—(7) and (9)—(31) if it can prove that it did not know, or have reason to know, that its discharge, alone or in conjunction with discharges from other sources, would cause pass-through or interference and that either: a. A local limit exists for each pollutant discharged and the user was in compliance with each limit directly prior to, and during, the pass-through or interference; or b. No local limit exists, but the discharge did not change substantially in nature or constituents from the user's prior discharge when the POTW was regularly in compliance with its NPDES permit, and in the case of interference, was in compliance with applicable sludge use or disposal requirements. (3) Bypass. a. A user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to ensure efficient operation. These bypasses are not subject to the provision of subsections (v)(3)c.2. or c.3. b. If a user knows in advance of the need for a bypass, the user shall submit prior notice to the POTW at least ten days before the date of the bypass, if possible. A user shall submit oral notice to the POTW of an unanticipated bypass that exceeds applicable pretreatment standards within 24 hours from the time the user becomes aware of the bypass. A written submission shall also be provided within five days of this time the user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate and prevent reoccurrence of the bypass. The owner of the POTW may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. c. Bypass is prohibited, and the owner of the POTW may take an enforcement action against a user for a bypass, unless: 1. Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; 2. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate backup equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and 3. The user submitted notices as required under subsection (v)(3)c.2. (w) Forms. WSACC and/or the city may establish such forms as the executive director and/or city manager determine to be appropriate and require the use of such forms in the submission of any report, application, request, or other information contemplated by this ordinance. Failure to use the established form for the submission of a report, application, request, or other information may result in the rejection of the submission. (x) Electronic reporting. The WSACC executive director or city manager may develop procedures for receipt of electronic reports for any reporting requirements of this section. Such procedures shall comply with 40 CFR Part 3. These procedures shall be enforceable under subsection (t). (y) Special reporting requirements for IUs in satellite POTWs. In the case of industrial user located in a satellite POTW organization's jurisdiction, all information required to be reported to the industrial user's pretreatment program control authority by this section may also be required to be reported to the POTW treatment plant organization.
(Ord. No. 04-17, § 1, 3-11-2004; Ord. No. 12-122, § 4, 12-13-2012)
Ask a question about Concord law
Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.
