Sec. 62-52. - Work in public way requiring prior notice; authorizations; standards; fees.
(a) Work requiring prior notice to department. Persons and users shall give prior notice to the department of the following activities, and obtain necessary authorizations before initiating the work: (1) Excavation or restoration within the public way, including but not limited to construction of new portions of the public way; (2) Cutting, moving, or alteration of any pipe, conduit, pole, meter, fire hydrant, facility, or other equipment or structure owned by the city, or attachment to such objects; (3) Installation or repair of facilities within the public way including but not limited to placing facilities on other facilities already located in the public way; (4) Construction of private streets (including but not limited to paving and gutters), sidewalks, or alleys; (5) Installation or repair of facilities for the conveyance of water, sewer, or stormwater; and (6) Installation or repair of facilities for electrical, gas, video, internet, telephone, cable, telecommunications, television, or other information or data transfer service to customers within the city. (b) Authorizations - franchises, licenses, permits, construction drawings, and other approvals. The department may require, in its discretion, one or more authorizations for the work described in (a), and may require submission of all information it deems necessary for receipt of such authorization(s). The department shall determine, in its discretion whether a franchise, a license, a permit, construction drawings, or other type of authorization shall be required, or multiple authorizations, for work described in (a) and for users with facilities in the public way. (c) Unlawful to do work without authorizations; emergency. Except in the event of an emergency, it shall be unlawful to do work in the public way or maintain facilities in the public way without authorizations that may be necessary. In the event of an emergency, a person may do such work as is necessary to address the emergency. Application shall immediately be made for necessary authorizations from the city, notwithstanding that work may have started or have been completed and all necessary fees shall be paid. (d) Standards. The department shall develop standards and requirements for authorizations, including but not limited to franchises, licenses, permits, and other approvals, and may attach conditions to such authorizations. The department may also develop standards and requirements for doing work in the public way when an authorization is not required. (d) List of contractors. The department may require that franchisees and persons who contract to have work performed in the public way maintain an updated list of the contractors working on their projects, and acknowledge responsibility for the actions of the contractors on the public way. (e) Fees; accounts. The department shall charge such fees as are authorized by the city council for authorizations; applications for authorizations; review of information and plans; inspections and reinspections; maintenance of facilities in the public way; and for any other city review, oversight, or administration of proposed, ongoing, or completed activities described in (a). The department may allow persons to establish and fund escrow accounts or other accounts with the city to which fees may be charged. (f) Reinspection fees. The department shall charge fees as are authorized by the city council for additional reviews and inspections required for work not completed to city standards and/or work that damaged existing infrastructure. (g) Civil penalties, equitable remedies, stop work orders, and misdemeanor offenses for working without authorization; appeals process. Any person who violates this article shall be subject to all civil penalties and equitable remedies of this section and as stated in G.S. 160A-175. (1) Civil penalties authorized by this section may be assessed against the owner on whose behalf work is being performed and against a contractor who is performing such work. a. Two-hundred-fifty-dollar civil penalty. Any owner or contractor found to be performing work within the public right-of-way without a required permit or other required authorization, where the work requires a building permit and/or driveway permit for a singular, single-family dwelling, and where such work was performed without the necessary permit shall subject the offender to a civil penalty of $250.00 if such penalty is paid within 30 days of issuance of the notice of violation, and a civil penalty of $400.00 plus court costs, if any, if the $250.00 civil penalty is not paid within 30 days after issuance of the notice of violation. b. One-thousand-dollar civil penalty. For work other than such work described in subsection (a) above, any owner or contractor found to be performing work within the public right-of-way without a required permit or other required authorization shall subject the offender to a civil penalty of $1,000.00 if such penalty is paid within 30 days of issuance of the notice of violation, and a civil penalty of $1,500.00 plus court costs, if any, if the $1,000.00 civil penalty is not paid within 30 days of issuance of the notice of violation. c. Two-thousand-dollar civil penalty. Additional violations after the first violation for any owner or contractor performing work within the public right-of-way without a required permit or other required authorization shall subject the offender to a civil penalty of $2,000.00 if such penalty is paid within 30 days of issuance of the additional notice of violation, and a civil penalty of $3,500.00 plus court costs, if any, if the $2,000.00 civil penalty is not paid within 30 days of issuance of the additional notice of violation d. Emergency work exemption. Otherwise applicable civil penalties that are specified in this Code section shall not be issued where evidence is submitted to the public works director's satisfaction that the work performed constitutes emergency work. The entity performing the emergency work will be required to pay the otherwise applicable permit fee however. e. Double civil penalty for false emergency work claims. The civil penalty will be doubled for any owner or contractor found to be claiming an emergency work exemption where the work performed does not qualify as emergency work. (2) Stop work order. The city may issue a stop work order to any person or entity performing work in the public way when there is a violation of this section. A stop work order shall be in writing, state the work to be stopped, state the reasons therefore, and state the conditions under which the work may be resumed. a. Any owner or contractor found to be performing work within the public right-of-way without a required permit or other required authorization shall subject the offender to a stop work order for the duration of seven calendar days from the date of issuance of the stop work order. This duration may be shortened by the public works director or designee if the offender immediately makes arrangements to obtain the required authorization. b. Violations beyond the first for any owner or contractor found to be performing work within the public right-of-way without a required permit or other required authorization shall subject the offender to a stop work order for a duration of 30 calendar days from the date of issuance of the stop work order. c. Notwithstanding the foregoing, the violation of a stop work order issued pursuant to this subsection shall constitute a misdemeanor punishable under G.S. 14-4. (3) Appeal process. Any owner or contractor assessed a civil penalty or ordered to stop work pursuant to this section may appeal to the director of public works by giving written notice of appeal to the director of public works no later than ten days after receiving notice of the penalty or stop work order. The director of public works shall consider such an appeal within seven days after receiving the notice of appeal. The decision of the director of public works on the appropriateness of the assessment of a civil penalty or the issuance of a stop work order shall be final. Any person who fails to provide notice of appeal as required in this section waives his or her right of appeal.
(Ord. No. 14665, § 2, 8-18-2014; Ord. No. 15296, § 1, 5-21-2018)
Ask a question about Durham law
Corpus searches the Durham sections it holds and shows the ones that match, with their citations. Free, no sign-in.