Sec. 62-55. - Additional requirements for location, relocation, maintenance and removal of facilities in the public way.

In addition to complying with sections 62-51 through 62-54, users that locate, relocate, repair, maintain, or remove facilities in the public way shall also comply with the following requirements: (1) Locations determined in discretion of department. The department shall have the discretion to approve, deny, alter, and condition all proposed locations of facilities in the public way, and to determine whether placement, if allowed, shall be above ground or below ground. a. To the extent practicable, all facilities located in the public way shall be located entirely below ground (underground). b. When locating a facility entirely below ground is not practicable, the facility shall be located such that those portions of the facility that can be located below ground are so located, and all other elements of the facility are flush with the top of grade and do not pose a tripping hazard. c. When portions or all of the facility cannot be located below ground or flush with the top of grade, facility locations shall be proposed by a North Carolina registered professional engineer or landscape architect, under seal, including an analysis of the vehicular and pedestrian clear zone per American Association of State Highway and Transportation Officials (AASHTO) standards, and including facility locations entirely outside of the clear zone. d. When facilities cannot be located entirely outside of the clear zone, all elements of the facility not flush with the ground or below ground shall be supported exclusively by break-away supports meeting AASHTO and/or Federal Highway Administration (FHWA) standards and specifications. (2) Underground locations for low-voltage wire and telecommunications cabling, including fiber optic cabling. To the extent practicable, low-voltage wires, telecommunications cabling, including fiber, and similar conduit shall be located underground. A user that wishes to place such facilities above ground shall demonstrate to the city's satisfaction why above ground placement is necessary. It is preferred that all low-voltage wire, telecommunications cabling, and fiber facilities within a softscape portion of the right-of-way be housed in ducts and/or conduit that can house multiple facilities. However, if the National Electric Code permits the direct bury (no duct or conduit) of the facility, the facility may be direct buried at a depth of no less than 12 inches below the ground surface. This depth of burial is required to provide protection to the direct buried facility. The facility owner shall be solely responsible for all damage to direct buried facilities that have not been installed to the required depth of 12 inches or more below the ground surface. (3) Existing ducts. Facilities shall be located in existing ducts if such ducts are available and practicable to use, as determined in the discretion of the city, taking into account relevant considerations. A user shall take reasonable steps to procure the right to use existing ducts. (4) Documentation of sufficient space. A user shall demonstrate to the department's satisfaction that sufficient space exists in the public way for its proposed facilities without interfering with existing or future public projects, and that placement of the facilities will not unduly disrupt use of the public way or negatively impact the condition of the public way. (5) Posting of notice. The city may require a user to post written notice of proposed work or activities along the public way impacted and/or to distribute notices to individual properties located along the public way. (6) Documentation to city upon completion. Users shall give the department all information it requests regarding the installation of facilities upon completion. Such information may include, but is not limited to as-built or other maps, which shall be furnished in the form required by the department, and changes to planned locations that were necessary to avoid pre-existing infrastructure. (7) Maps and information on file with users. During the time period a user has facilities in the public way, the user shall maintain one or more maps showing the placement of its facilities in the public way. A user shall also maintain other information regarding the function and capacity of its facilities. Upon the city's request, the user shall furnish these maps and information to the city within the time period specified at no cost and in such form and detail as the city requires. (8) NC One Call. Users with underground facilities shall maintain a membership in the NC underground locating system during the time period facilities are located in the public way and respond to and locate underground facilities as required by the Underground Damage Prevention Act, G.S. 87-101 et seq., and other applicable regulations and requirements. (9) Relocation of facilities. A user shall at its own cost relocate its facilities within a time determined in the discretion of the city if the city determines in its discretion that the facilities: a. Interfere with the use of the public way, or the provision of services to city residents; or b. Interfere with the repair or maintenance of any city-maintained utility; or c. Will impede the construction of a project funded in part with public funds, or a project to be dedicated to the public upon completion, or d. That the public way can be better or more efficiently utilized by the relocation of the facilities. (10) Maintenance of facilities. Users shall monitor, maintain, and repair their facilities in the public way so that they function in a safe manner and do not create a risk to persons or property. Users shall notify the department of maintenance and repair work that may impact the public way or use of the public way. Users shall give the city all information requested regarding the condition of facilities. Users shall repair facilities upon city request. (11) Removal of facilities in the public way. Facilities placed in the public way without an authorization, if one is required by the city, and facilities for which a license or franchise has expired shall be removed upon order of the city. In addition, all abandoned facilities or facilities that no longer function as part of a user's system shall be removed by their owner. If facilities that are required to be removed are not removed, the city may remove them, with the cost of removal to be borne by the owner. (12) Third party use. Users shall permit other licensees and franchisees, including holders of franchises awarded pursuant to G.S. 66-350 et seq., to utilize available space in or on the user's facilities upon reasonable terms and charges negotiated by and agreed to by the respective users, franchisees, and licensees. Charges calculated in accordance with section 224 of the Communications Act of 1934, as amended, 47 USC 224 shall constitute reasonable charges for pole attachments.

(Ord. No. 14665, § 2, 8-18-2014; Ord. No. 15255, § 1, 2-5-2018; Ord. No. 15297, § 1, 5-21-2018; Ord. No. 15791, § 1, 4-5-2021)

Ask a question about Durham law

Corpus searches the Durham sections it holds and shows the ones that match, with their citations. Free, no sign-in.