§ 70-738 — Peak runoff control requirements

Code of Ordinances, City of Durham, North Carolina (Supp. No. 37, Update 1: codified through Ordinance No. 16682, adopted June 15, 2026) · Durham City Code § 70-738

Corpus is an independent public-information project, not the official City of Durham website. Stable reference: corpuslaw.us/code/27c49d3e-c3f6-49ae-9d3f-de4b495b16a9

Sec. 70-738. - Peak runoff control requirements.

(a) Purpose. The purpose of this section 70-738 is to ensure that the increases in volume, velocity, and peak flow of storm water discharges from development are addressed, in order to mitigate the impacts on downstream properties and receiving waters. All development, including development that may be exempt from pollutant reduction requirements set forth in remaining sections of this article, is subject to the requirements of this section unless exempted in (b) below. (b) Applicability; calculation of prior impervious surface area. This subsection 70-738 applies to the following development, assessed in comparison to pre-development prior Impervious Surface conditions as defined in (1) and (2) below: (i) relocation of existing impervious surface area on a multifamily and other lot; (ii) increase in Impervious surface area on any lot subject to limitations on impervious surface area in an approved plat or plan for reasons such as watershed protection or stormwater control measure requirements; (iii) increase of more than 500 square feet in impervious surface area on a multifamily and other lot; (iv) increase of more than 2,000 square feet of impervious surface area on a single family or duplex residential lot included on a preliminary or final plat submitted for review, or on any lot utilized for recreation. For purposes of calculating these thresholds, subject development that is part of a common plan of development shall be assessed with other portions of such common plan that have not previously complied with peak flow requirements. (1) For purposes of applying peak flow requirements for the 2- and 10-year storms, the land cover (including type and location) existing as of April 23, 1997 shall be considered the "pre-development conditions"; (2) For purposes of applying the peak flow requirement for the 1-year storm, the land cover (including type and location) that existed as of March 9, 2001 for land in the Falls Basin and Lower Neuse Basin, and as of March 17, 2009 for land in the Jordan Basin shall be considered the "pre-development conditions"; (c) Requirements. (1) Stormwater impact analysis. Development that is not exempt under (b) above shall submit a stormwater impact analysis or approved alternative to such analysis that complies with City Stormwater Standards as part of the application for site plan or subdivision plat approval, or if such is not required, as part of submittals for construction drawings or utility permit approval. Calculations shall be made in conformance with City Stormwater Standards. No subdivision plats, site plans, utility permits, or construction drawings shall be approved in the absence of a determination by the department that required submissions have been made and approved. (2) One-year storm. Development that requires one or more of the following must prevent any increases in the peak runoff rate from the 1-year storm from pre-development conditions in accordance with City Stormwater Standards: (i) 2-year, 10-year, or other design storm detention in accordance with this section; (ii) Stormwater pollutant removal in accordance with section 70-740; (iii) stormwater control in accordance with Section 8.7 Watershed Protection Overlay Standards of the Unified Development Ordinance. (3) Two- and ten-year storms. Development that increases the peak runoff rate from either the 2-year or the 10-year storm from pre-development conditions may be required to provide stormwater management facilities to address the impact, as determined in accordance with City Stormwater Standards. (4) Other design storms. Development that increases the peak runoff from other design storms such as the 100-year storm may be required to install stormwater management facilities to address the impact, as determined in accordance with City Stormwater Standards.

(Ord. No. 14274, § 1, 6-4-2012; Ord. No. 15468, § 1, 5-20-2019; Ord. No. 16135, § 1, 4-17-2023)