Sec. 70-742. - Design, construction, and completion of SCMs and stormwater conveyances.

The owner(s) and/or the developer(s) of any Development for which SCMs and/or Stormwater Conveyances have been approved, and persons or entities that have contracted to perform all or a part of an owner's or developer's obligations, shall be responsible for complying with the requirements set forth below. (a) Design. Stormwater Facilities required by this article shall be designed in accordance with City Stormwater Standards. Dams, as defined by the North Carolina Dam Safety Law, including but not limited to NCGS 143-215.23 et seq., and associated state administrative codes, as they may be amended in the future, are subject to the above-cited state requirements. (b) Approvals for stormwater facilities. Stormwater Facilities required by this article or any other requirement of City Code or by the Unified Development Ordinance shall be constructed in accordance with City Stormwater Standards. Plans for Stormwater Facilities shall be submitted to the Department for review and approval on such timetable as required in City Stormwater Standards. City Stormwater Standards may require that permits be obtained for such work. (c) Construction plans, fees, financial guarantees. For a Development in which construction of one or more Stormwater Control Measures is required, the owner(s) and/or developer(s) must ensure compliance with (1) through (5) below prior to one of the following: i) recordation of final plat for development involving individual ownership of lots or units within the development; ii) issuance of a utility permit for development which is not exclusively for residential home/condominium ownership; iii) issuance of a building permit for construction within a development which is not exclusively for residential home/condominium ownership and does not require a utility permit; or iv) construction drawing approval for any infrastructure within the development which will not require a building or utility permit. (1) Review and approval of the stormwater impact analysis; (2) Review and approval of plans and specifications for the SCMs and Stormwater Conveyances within the development; (3) Payment of permit and review fees required by the Department; (4) In the case of development involving individual ownership of lots or units within the development, creation of an owners' association prior to recordation of covenants that both comply with City Stormwater Standards and provide, among other things, for the long term maintenance, inspection, repair, and reconstruction of the SCMs in accordance with City Standards; (5) Provision of financial guarantees to ensure the long-term maintenance, inspection, repair, and reconstruction of stormwater control measures in accordance with City Code section 70-743, the Unified Development Ordinance, and City Stormwater Standards. (d) Completion of construction. Construction of SCMs and stormwater conveyances shall be completed prior to final plat approval, if a final plat approval is required for the development. For a building, structure, or use not deemed single family or duplex residential development, construction of SCMs and stormwater conveyances shall be completed prior to issuance of a certificate of occupancy unless a performance guarantee to ensure completion is approved pursuant to (e) below. (e) Performance guarantees. The owner or developer of a Development in which the requirements of (d) above have not been completed shall provide a performance guarantee of a type as set forth in City Stormwater Standards. The amount provided shall be as set forth in City Stormwater Standards, or as determined by the Director, which shall at a minimum require that all direct and indirect costs of completion and compliance with city requirements be guaranteed. City Stormwater Standards shall also include deadlines for completion of facilities for which performance guarantees have been provided. Deadlines may be modified by the Director to better ensure the protection of the city and the public, or to address special circumstances. (f) Conditional certificates; reduction of guarantees. The city is authorized to issue conditional certificates of compliance for buildings for which performance guarantees have been provided and completion has been ensured consistent with City Stormwater Standards. In addition, City Stormwater Standards may allow for reduction of performance guarantees as approved by the Department as Stormwater Facilities are completed and requirements are met. (g) Obligation to complete facilities; city use of land. The owner of property for which a stormwater facility has been approved as part of a Development, and any parties that have obligated themselves to construct such facilities under approved plans, permits, or previously approved agreements, are legally obligated to construct the facilities approved, or to pay for the construction of such facilities, if any land disturbing activity has occurred in the Development. An owner that applies for and receives approval to construct a stormwater facility in a Development agrees that the city and its agents are authorized to enter upon the property and to construct the stormwater facilities if the owner fails to do so. This provision does not: i) require the city to take any action, acquire any property, or construct any facility; or ii) create any right or entitlement for any persons or entities other than the city; or iii) limit the city's ability to require other persons or entities not identified in this subsection (g) to construct stormwater facilities that have not been constructed; or iv) limit the city's ability to utilize any other authority it may have under law to recoup the cost of construction of storm water facilities, including but not limited to authority to assess properties served by such facilities. (h) Rights under contracts. The city is entitled to enforce any third party rights for the benefit of the public or itself that may be expressly or implicitly created in contracts for the design and construction of SCMs or Stormwater Conveyances. Contractors that have not performed in accordance with such contracts may be considered responsible parties under this article.

(Ord. No. 14274, § 1, 6-4-2012; Ord. No. 15468, § 1, 5-20-2019; Ord. No. 16135, § 1, 4-17-2023; Ord. No. 16535, § 1, 8-4-2025)