§ 2.6.5 — Performance Guarantee

Code of Ordinances of the City of High Point, North Carolina (Codified through Ordinance No. 8067/25-45, enacted November 17, 2025 (Supp. No. 9)) · High Point Development Ordinance § 2.6.5

Corpus is an independent public-information project, not the official City of High Point website. Stable reference: corpuslaw.us/code/0173d942-92a6-48a2-ba61-829427c37993

2.6.5. - Performance Guarantee

A. General A performance guarantee shall be required to record a final plat, issue a permit or issue a certificate of occupancy as determined by the appropriate Director, in the following circumstances: 1. To ensure the completion of public infrastructure improvements that are required as part of an approved preliminary plan, site plan, or group development. 2. To issue a land disturbance permit and ensure the protection of a site during land disturbance and prevent off-site sedimentation. 3. To ensure the completion of stormwater control measures that are required as part of an approved preliminary plan, site plan, or group development. 4. To ensure the completion of site improvements that are required as part of an approved preliminary plan, site plan, or group development. B. Amount 1. General Performance guarantees for public infrastructure, stormwater control measures, and site improvements shall be in an amount equal to 125 percent of the total estimated cost of completing the installation of the required improvements, including the costs of materials, labor, and project management. 2. Estimates Cost estimates shall be itemized by improvement type and certified by the applicant's licensed professional engineer, or authorized contractor upon approval of the appropriate Director. Where applicable, the cost estimates shall be based on unit pricing. 3. Soil Erosion and Sedimentation Control A performance guarantee required for a land disturbance permit shall be in the amount established by City Council and included in the Development Guide. C. Duration 1. Public Infrastructure (a) The performance guarantee shall be for one year, unless the applicant determines the scope of work for the required public improvements necessitates a longer duration. (b) If the public improvements are not completed and approved by the Engineering Services Director prior to the expiration of the initial period, the performance guarantee shall be extended for one additional period of time at the request of the applicant; however, the extension period shall only be for the duration necessary to complete the required improvements. (c) If the performance guarantee expires without an extension, the applicant shall be required to obtain a new performance guarantee for one additional period of time or be considered in default. 2. Soil Erosion and Sedimentation Control The performance guarantee shall remain in effect until the work is completed in accordance with the land disturbance permit and approved by the Engineering Services Director. 3. Stormwater Control The performance guarantee shall remain in effect until the stormwater control measure is complete in accordance with approved plans and approved by the Public Services Director. 4. Site Improvements The performance guarantee shall be up to a maximum period of one year, as approved by the Planning & Development Director. D. Terms and Conditions 1. The applicant shall determine whether to post one or multiple types of guarantees for all matters related to the same development; however, separate guarantees shall be required for soil erosion and sedimentation control, and for stormwater control measures. 2. The performance guarantee shall distinguish between the portion of the guarantee provided for public infrastructure improvements and the portion provided for private improvements, as applicable. 3. The performance guarantee shall be conditioned on the performance of all work necessary to complete the installation of the required improvements within the duration of the guarantee. E. Release or Reduction 1. Request The appropriate Director shall release or reduce a performance guarantee only after: (a) The applicant has submitted to the appropriate Director a written request for a release or reduction of the performance guarantee that includes certification by the applicant's engineer or contractor, whichever is appropriate, that installation of the guaranteed improvements were completed in accordance with approved plans and specifications, or for a land disturbance permit a written statement from the applicant that the site is stabilized as required; (b) The applicant has submitted to the appropriate Director as-builts of the improvements, if required by this Ordinance; (c) City staff has performed a site inspection and certified in writing that installation of the guaranteed improvements is complete in accordance with approved plans and specifications; (d) For stormwater control measures, the operation and maintenance agreement has been approved, executed and recorded, and a maintenance guarantee is in effect as required by this Ordinance; and (e) No release or reduction in performance guarantee amounts will be considered until more than 25 percent of the work is in place and approved by the appropriate Director. 2. Acceptance The appropriate Director shall provide written notice of the City's final approval or acceptance of the improvements subject to performance guarantee. F. Default and Forfeiture 1. Notice of Failure to Install or Complete Improvements If the applicant fails to complete installation of the guaranteed improvements within the duration of the performance guarantee (including an additional period of time, if allowed), the appropriate Director shall give the applicant written notice by certified mail of the scope and degree of the deficiency, and state in the notice that 30 days after receipt the City may draw on the performance guarantee. 2. Notice of Insolvency If the applicant becomes insolvent, undergoes bankruptcy, or the property subject to the guarantee undergoes foreclosure, the appropriate Director shall give the applicant written notice by certified mail of the scope and degree the guaranteed improvements are incomplete, and state in the notice that 30 days after receipt the City may draw on the performance guarantee. 3. City Completion of Improvements After the 30-day notice period expires, the City may draw on the performance guarantee and use the funds to perform work necessary to complete installation of the guaranteed improvements. After completing such work, the City shall provide a complete accounting of the expenditures to the applicant and return any unused deposited cash funds or other equitable security, without interest.

(Ord. No. 7622/20-38, § 11.A, 8-5-2020)