2.6.6. - Stormwater Maintenance Guarantee
A. General 1. Defects To ensure against defects in workmanship or materials of stormwater control measures during the maintenance period, a maintenance guarantee is required for all stormwater control measures in a development. 2. Timing A maintenance guarantee must be established in conjunction with the stormwater performance guarantee or prior to the issuance of a certificate of occupancy, as determined by the Public Services Director. B. Amount 1. General Maintenance guarantees shall be in an amount equal to 25 percent of the total estimated cost of installing the stormwater control measure, including the cost of materials, labor, and project management. 2. Estimates Cost estimates shall be itemized by improvement type and certified by the applicant's licensed professional engineer. Where applicable, the cost estimates shall be based on unit pricing. C. Duration The maintenance guarantee shall remain in effect until the stormwater control measure passes its first annual inspection by City staff. D. Terms and Conditions 1. The maintenance guarantee is conditioned on the performance of all work necessary to cure defects in materials and workmanship and to properly maintain the required stormwater control measures through the duration of the maintenance period. 2. Only one type of guarantee shall be posted for a stormwater control measure. 3. When a stormwater performance guarantee is required, the financial guarantee shall be apportioned to include the stormwater maintenance guarantee; however, the portion assigned for the maintenance guarantee shall not be released except in accordance with this subsection. E. Release The Public Services Director shall release a maintenance guarantee after the first annual inspection only after determining and certifying in writing that the guaranteed stormwater control measure is functioning properly and is in compliance with approved plans and specifications. F. Default and Forfeiture 1. Notice of Failure to Maintain If the applicant fails to correct any deficiencies discovered during the annual inspection, the Public Services Director shall give the applicant written notice by certified mail of the scope and degree of the deficiency, and state in the notice that 30 days after receipt the City may draw on the maintenance guarantee. 2. City Correction of Defects After the 30-day notice period expires, the City may draw on the maintenance guarantee and use the funds to perform work necessary to correct any deficiencies to ensure the stormwater control measure is in compliance with approved plans and specifications. After completing such work, the City shall provide a complete accounting of the expenditures to the applicant and return any unused deposited cash funds or other equitable security, without interest.
(Ord. No. 7622/20-38, § 11.A, 8-5-2020)
Ask a question about High Point law
Corpus searches the High Point sections it holds and shows the ones that match, with their citations. Free, no sign-in.