For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5.5.14 — Additional Landscape Yard Flexibility

Code of Ordinances of the City of High Point, North Carolina (Codified through Ordinance No. 8067/25-45, enacted November 17, 2025 (Supp. No. 9)) · High Point Development Ordinance § 5.5.14

Corpus is an independent public-information project, not the official City of High Point website. Stable reference: corpuslaw.us/code/93073e04-cdf1-4d92-acf4-2a2bfbfb8cae

5.5.14. - Additional Landscape Yard Flexibility

A. Substitution 1. Canopy trees may be substituted for shrubs at the rate of 1 canopy tree for 8 shrubs, and understory trees may be substituted for shrubs at the rate of 1 understory tree for 5 shrubs if approved by the Planning and Development Director. 2. Understory trees may be substituted for canopy trees at the rate of 2 understory trees for each canopy tree when a conflict exists due to overhead utility lines. B. Existing Lots of Record 1. On lots of record that existed prior to March 1, 1992 that are less than 55,000 square feet in area, no development is required to landscape more than 15 percent of the lot. Priority shall be placed on meeting streetyard requirements first, then on other perimeter landscape yards. 2. Where a required landscape yard is reduced in width by 10 feet or more than the minimum requirement, and the differential in land use intensity is 2 or more categories, a 5-foot opaque fence may be required by the Planning and Development Director. C. Plantings in Shaded Areas Where a building is located less than 10 feet from a lot line, and the landscape yard would be heavily shaded by buildings on either side of the lot line, required trees and shrubs may be planted outside the shaded area to improve their chances of survival.

Ask a question about High Point law

Corpus searches the High Point sections it holds and shows the ones that match, with their citations. Free, no sign-in.