For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5.5.8 — Credit for Existing Vegetation

Code of Ordinances of the City of High Point, North Carolina (Codified through Ordinance No. 8067/25-45, enacted November 17, 2025 (Supp. No. 9)) · High Point Development Ordinance § 5.5.8

Corpus is an independent public-information project, not the official City of High Point website. Stable reference: corpuslaw.us/code/b43787e2-fbe7-475b-8a34-b9b41f330726

5.5.8. - Credit for Existing Vegetation

A. General Standards Existing healthy, well-formed canopy and understory trees that are in or within 10 linear feet of a required landscape yard and that meet or exceed the standards of this section may be credited toward the applicable tree planting requirements of this section, in accordance with the following: 1. The landowner or developer has provided a plan showing the location and size of canopy and understory trees to be credited, and trees depicted on the plan have been marked or identified on the site. 2. The canopy and understory trees to be credited are protected before and during development by tree protection fencing in accordance with the Development Guide. 3. The location of the existing canopy and understory trees to be credited contribute to the screening or buffering functions of the landscaping. 4. Any canopy or understory trees for which credit has been received that die shall be replaced in a manner that ensures the landscaping meets the requirements of this section. B. Amount 1. Existing trees meeting the standards in (A) above that are retained during and after development shall be credited towards the minimum landscape requirements at a rate of 1.25 times the tree's actual DBH. 2. Trees to be credited shall be verified prior to credit being provided. C. Credit Determination 1. The amount of credit towards the number of required new trees is determined by dividing the total DBH of trees to be retained by the minimum caliper inch size of required plantings (see Section 5.5.6, Plant Material Specifications). Example: A development site that retains 3 8-inch DBH canopy trees will be credited for a total of 30 inches DBH of existing trees ((8x3) x 1.25 = 30 DBH), or 10 newly-planted canopy trees (30/3=10). 2. The Planning and Development Director shall verify and approve trees to be credited in accordance with this section. D. Streetyard Requirements Regardless of the number or size of preserved trees in required streetyards, there shall be at least 1 canopy tree for every 50 linear feet of required streetyard.

Ask a question about High Point law

Corpus searches the High Point sections it holds and shows the ones that match, with their citations. Free, no sign-in.