§ 6.2.11 — General Standards and Restrictions
Code of Ordinances of the City of High Point, North Carolina (Codified through Ordinance No. 8067/25-45, enacted November 17, 2025 (Supp. No. 9)) · High Point Development Ordinance § 6.2.11
Corpus is an independent public-information project, not the official City of High Point website. Stable reference: corpuslaw.us/code/59ac26f5-ea6f-447e-874d-cbed7217ed13
6.2.11. - General Standards and Restrictions
A. Density and Intensity 1. Low Density Development Calculation (a) For low density development, density is measured in dwelling units per acre for single-family detached and duplex residential developments. (b) For recreational facilities, such as golf courses and tennis and swim clubs lying within a residential development, impacts shall be determined by measuring the built-upon area on the lot or common area and dividing by 3,000 square feet to obtain a dwelling unit equivalency number. (c) Upon approval of a modification by the TRC, low density developments may utilize either the density standard, built-upon area standard, or combination thereof pursuant to Table 6.2.11.A1, Minimum Stormwater Controls Required in the General Watershed Area and in Non-water Supply Watersheds. (d) For all other residential and nonresidential development, the built-upon area measure shall apply. 2. High Density Development Calculation For all high density development the built-upon area measure shall apply. 3. Density and Built-Upon Area Calculations (a) For the purpose of calculating density, acres shall be gross acres. (b) As an alternative, single-family detached or duplex residential developments dividing 4 or fewer lots and not constructing streets may use 20,000 square-foot lots where the maximum density is 2 dwelling units per acre and 40,000 square-foot lots where the maximum density is 1 dwelling unit per acre. (c) If single-family detached or duplex dwellings are intermingled within a development with other uses, then the built-upon area measurement shall apply. (d) When sections of the same development are devoted to single-family detached or duplex residential development and other sections are devoted to other uses, then the developer may apply the appropriate measurement to the different sections or may use the built-upon area measurement for the entire development. (e) Single-family detached or duplex residential development using the built-upon area measurement shall assume 3,000 square feet of built-upon area per lot. (f) The built-upon area maximum shall apply to the entire development, including streets, buildings, drives, and other impervious surfaces. (g) The maximum built-upon area allowed shall be allocated throughout the development. (h) In single-family detached and duplex residential developments, the allocation to each lot shall be uniform. (i) In all other developments, the allocation may vary among lots. (j) In all cases, the recorded plat shall clearly state each lot's allocation and restrictive covenants shall record these allocations. TABLE 6.2.11.A1: MINIMUM STORMWATER CONTROLS REQUIRED IN THE GENERAL WATERSHED AREA AND IN NON-WATER SUPPLY WATERSHEDS WATERSHED | DENSITY/BUILT-UPON AREA [1] | MINIMUM STORMWATER CONTROL REQUIRED RESIDENTIAL | MULTIFAMILY AND NONRESIDENTIAL All watersheds EXCEPT Randleman Lake | ≤ 1 du/2 acre | ≤ 6% built-upon area | None ≤ 2 du/acre [2] | ≤ 24% built-upon area 2 | Alternate measures [3] > 2 du/acre | > 24% built-upon area | Primary stormwater control measures [4] Randleman Lake | ≤ 1 du/2 acre | ≤ 6% built-upon area | None ≤ 1 du/acre | ≤ 12% built-upon area | Alternate measures [3] > 1 du/acre | > 12% built-upon area | Primary stormwater control measures [4] NOTES: [1] Single-family detached and duplex development utilizing the low density option shall use the density standards except as approved by modification pursuant to Section 6.2.11 A.1, Low Density Development Calculation. Single-family detached and duplex development exceeding the density limits shall use the built-upon area standards. All other residential and nonresidential development shall use the built-upon area standards. [2] May be increased to 3 dwelling units per gross acre or 36 percent built-upon area for developments without a curb and gutter street system. [3] Alternate measures shall be in accordance with Section 6.2.11 B.2, Alternate Measures. Low Density Development is development that is equal to or less than 2 dwelling units per acre or 24 percent built-upon area (bua) in all watersheds except Randleman Lake. Low Density Development in the Randleman Lake watershed is development that is equal to or less than 1 dwelling unit per acre or 12 percent built-upon area. [4] Primary stormwater control measures in accordance with high density development is development that is greater than 2 dwelling units per acre or 24 percent bua in all watersheds except Randleman Lake. High Density Development in the Randleman Lake watershed is development that is greater than 1 dwelling unit per acre or 12 percent bua. TABLE 6.2.11.A2: MINIMUM STORMWATER CONTROLS REQUIRED IN THE WATERSHED CRITICAL AREA WATERSHED | DENSITY/BUILT-UPON AREA [1] | MINIMUM STORMWATER CONTROL REQUIRED RESIDENTIAL | MULTIFAMILY AND NONRESIDENTIAL ALL water supply watersheds EXCEPT Randleman Lake | ≤ 1 du/2 acre | ≤ 6% built-upon area | None ≤ 2 du/acre | ≤ 24% built-upon area | Alternate measures [1] n/a | > 24% built-upon area | Primary stormwater control measures [2] Randleman Lake | ≤ 1 du/2 acre | ≤ 6% built-upon area | None > 1 du/2 acre [3] | > 6% built-upon area [3] | Primary stormwater control measures [2] NOTES: [1] Alternate measures in accordance with Section 6.2.11 B.2, Alternate Measures. [2] Primary stormwater control measures in accordance with Section 6.2.11 B.3, Primary Stormwater Control Measures for High Density Development. [3] In Tier 4, residential development > 1du/2 acres and < 1du/acre may use alternate measures in accordance with Section 6.2.11 B.2, Alternate Measures, in lieu of engineered stormwater controls. Multifamily and nonresidential development > 6 percent and < 12 percent built-upon area may do the same. 4. Density Averaging Two non-contiguous lots may be considered as one lot for the purposes of development density and intensity, provided the following requirements are met: (a) The two lots must be within the same water supply watershed, irrespective of jurisdictional boundaries. (b) Neither of the lots can be publicly held land, which include but are not limited to dedicated drainageway, open space, parkland, or other lands obtained for watershed protection. (c) One lot shall reduce its allowable density or built-upon area, while the other lot shall increase its allowable density or built-upon area by the same amount. (d) If one of the lots is located in the Watershed Critical Area, the critical area lot shall not be developed beyond the applicable density limit of the individual water supply watershed listed in Section 6.2.15, Individual Water Supply Watersheds. (e) The overall density for both lots shall meet applicable density requirements of Section 6.2.15, Individual Water Supply Watersheds, and both lots shall meet the stormwater control requirements for the individual water supply watershed. (f) If the development meets applicable low density requirements, the stormwater runoff shall be transported by vegetated conveyances to the maximum extent practicable. (g) Both lots shall comply with the applicable surface water buffer requirements of Section 6.2.9 C, Surface Water Buffers. (h) Built-upon areas shall be designed and located such that the Technical Review Committee finds that the design of each site is such that all of the following are achieved: (1) Minimized stormwater runoff impact to the receiving waters; (2) Minimized concentrated stormwater flow; (3) Maximized use of sheet flow through vegetated areas; and (4) Maximized flow length through vegetated areas. (i) Areas of concentrated density development shall be located in upland areas and, to the maximum extent practicable, away from surface waters and drainageways. (j) The lot or portions of the lots that are not developed shall remain in a vegetated or natural state, be placed in an easement in accordance with subsection (m) below, and be managed through one of the following means: (1) Conveyance to an owners' association as common elements; (2) Conveyance to a local government as a park, open space or greenway; or (3) Placement under a permanent conservation or farmland preservation easement. (k) Metes and bounds descriptions of the areas to remain vegetated and limits on use shall be recorded as follows: (1) On a plat; (2) If located within Common Elements, in the property's declaration of covenants, conditions, and restrictions; (3) If not located within Common Elements, in the individual deeds for each of the lots; and (4) With language making them irrevocable unless amended under the provisions of this Ordinance. (l) Density averaging for a development will be reviewed and approved as part of the watershed development plan for the lot or lots within the City's watershed jurisdiction. If one of the lots is located outside the City's jurisdiction and that lot is transferring its density allocation to a lot within the City's jurisdiction, then the density averaging approval for the development may not be granted until any required development approvals are provided by the other watershed jurisdiction. (m) Easements shall be platted over those areas that are not developed and they must remain in a vegetated or natural state. Within such easements, principal and accessory buildings and structures are not permitted and the natural ground cover and the natural tree canopy must be preserved, with the following exceptions: (1) Utilities and associated erosion control structures may be constructed and maintained; (2) Normal maintenance by mechanical means is allowed for the removal of dead, diseased, deformed, poisonous, or noxious vegetation and pests harmful to health; (3) Mechanical mowing of utility areas is allowed to control growth; (4) The removal of dead trees and logs is permitted, provided the stumps remain; (5) The removal of briars and vines is permitted, provided the underbrush remains in its natural state; and (6) The removal of hazardous trees is permitted, provided the stumps remain. B. Stormwater Control Measures 1. Vegetated Conveyances for Low Density Development To the maximum extent practical, as determined by TRC, stormwater runoff shall be transported from the development to vegetated areas as dispersed flow or by vegetated conveyances in accordance with the following. (a) Site-specific factors, such as topography, site layout, and protection of water quality, shall be considered. (b) Vegetated conveyances shall be maintained in perpetuity and meet the following criteria: (1) Side slopes shall be no steeper than 3:1 (horizontal to vertical) unless it is demonstrated that the soils and vegetation will remain stable in perpetuity based on engineering calculations and on-site soil investigation; and (2) The conveyance shall be designed so that it does not erode during the peak flow from the 10-year storm event as demonstrated by engineering calculations. (c) In lieu of vegetated conveyances, curb and gutter with outlets to convey stormwater to grassed swales or vegetated areas are allowed, subject to the following requirements: (1) The curb outlets shall be located such that the swale or vegetated area can carry the peak flow from the 10-year storm and at a non-erosive velocity; (2) The longitudinal slope of the swale or vegetated area shall not exceed 5 percent except where not practical due to physical constraints. In these cases, devices to slow the rate of runoff and encourage infiltration to reduce pollutant delivery shall be provided; (3) The swale's cross section shall be trapezoidal with a minimum bottom width of 2 feet; (4) The side slopes of the swale or vegetated area shall be no steeper than 3:1 (horizontal to vertical); (5) The minimum length of the swale or vegetated area shall be 100 feet; and (6) Treatment swales designed in accordance with 15A NCAC 02H .1061 may be used in lieu of the requirements specified in items (1) through (5) above. 2. Alternate Measures As required by Table 6.2.11.A1: Minimum Stormwater Controls Required in the General Watershed Area and in Non-Water Supply Watersheds and Table 6.2.11.A2: Minimum Stormwater Controls Required in the Watershed Critical Area, the following stormwater control measures are considered alternate measures that may be allowed provided that they meet the standards of the City of High Point Stormwater Best Management Practices Design Manual: (a) Extended dry pond; (b) Infiltration trench; (c) Natural infiltration area; (d) Participation in a public or private regional runoff control program, in compliance with Section 6.2.11 C, Participation in a Regional Stormwater Control Program; (e) Low impact design; and (f) Any stormwater control measures approved by the Engineering Services Director that complies with the performance standards of control of the first ½ inch of rainfall. 3. Primary Stormwater Control Measures for High Density Development In accordance with Table 6.2.11.A1: Minimum Stormwater Controls Required in the General Watershed Area and in Non-Water Supply Watersheds and Table 6.2.11.A2: Minimum Stormwater Controls Required in the Watershed Critical Area, stormwater control measures meeting the performance standards of control of the first 1 inch of rainfall and removal of 85 percent of total suspended solids (TSS) or limiting annual runoff volume after development to not more than 10 percent of the annual runoff volume before development shall be used to control stormwater runoff in compliance with the City of High Point Stormwater Best Management Practices Design Manual. In-lieu of an on-site engineered stormwater control, developments may participate in a regional stormwater control program in compliance with the requirements of Section 6.2.11 C, Participation in a Regional Stormwater Control Program. C. Participation in a Regional Stormwater Control Program 1. Public Regional Stormwater Control Program (a) Where Permitted (1) Where a regional stormwater control program has been established by one or more local governments, or by an authority operating on behalf of one or more local governments, a development may participate in the program in-lieu of any certification of stormwater control required by this section, provided that: (i) The development is within an area covered by a public regional stormwater control program; (ii) Stormwater from the development drains to an existing or funded public regional engineered stormwater control structure which is proposed to be built and is part of the program; (iii) Participation is in the form of contribution of funds, contribution of land, contribution of engineered stormwater control structure construction work, or a combination of these, the total value of which shall be in accordance with a fee schedule adopted by the City or in accordance with an intergovernmental agreement; and (iv) The TRC finds that the watershed development plan is in compliance with all other applicable requirements of this Ordinance. (2) Developments participating in a public regional stormwater control program are encouraged to maintain pre-development hydrology at the project site. (b) Use of Contributions Each contribution from a development participating in a public regional engineered stormwater control structure program shall be used for acquisition, engineering, construction and/or maintenance of 1 or more such structures in the same watershed in which development lies. The use of contributions for these purposes does not preclude the use or imposition of other revenue sources for these purposes. 2. Private Regional Stormwater Control Program (a) Where Permitted (1) Participation in a private regional engineered stormwater control program is permitted where a private off-site stormwater control program has been established by one or more property owners and approved by the TRC. A development may participate in the program in-lieu of any certification of runoff control required by this section, provided that: (i) The development is within an area covered by an off-site engineered stormwater control structure; (ii) Runoff from the development drains to an existing engineered stormwater control structure; (iii) The parties agree to share the cost of any required maintenance and/or construction; (iv) The agreement runs with the property; (v) The agreement is recorded with the appropriate county Register of Deeds in accordance with Section 6.2.11 D.3, Recordation of Improvements; (vi) The Engineering Services Director finds that the watershed development plan is in compliance with all other applicable requirements of this Ordinance. (2) Developments participating in a private regional stormwater control program are encouraged to maintain pre-development hydrology at the project site. D. Improvements 1. Design of Improvements (a) The design of all stormwater control measures shall be performed by a North Carolina registered professional engineer, approved by the TRC, and meet or exceed the standards of the City of High Point Stormwater Best Management Practices Design Manual. (b) The TRC shall require that a stormwater control measure be positioned on a site such that water quality protection is improved. 2. Construction of Improvements (a) The construction of all stormwater control measures as shown on an approved watershed development plan shall be completed and have received final approval prior to any plat recordation, or said improvements shall be guaranteed by a surety in accordance with Section 2.6, Financial Guarantees. (b) The construction of all stormwater control measures as shown on an approved watershed development plan shall be completed and have received final approval prior to the issuance of a certificate of occupancy. (c) If a building permit is not required for a site, then any required stormwater control measure shall be completed prior to installation of any built-upon area on the site. 3. Recordation of Improvements All stormwater control measures and associated access/maintenance easement(s) shall be recorded on a plat, and a mechanism to ensure their maintenance shall be established and recorded concurrent with or prior to plat recordation. 4. Engineer's Certificate of Completion Required An engineer's Certification of Completion for stormwater control measures as set out in the City's Development Guide shall be submitted prior to issuance of any building certificate of occupancy. 5. Operation and Maintenance Agreement (a) Maintenance responsibility for stormwater control measures and their access shall be vested with a responsible party by means of a legally binding and enforceable operation and maintenance agreement that is executed as a condition of plan approval, as provided for in Section 6.2.11 D.3, Recordation of Improvements. (b) The agreement must be approved by the Public Services Director and shall be binding on all subsequent owners of the site, portions of the site, and lots or parcels served by the stormwater control measures. (c) In the case of participation in a regional runoff control program in accordance with Section 6.2.11, General Standards and Restrictions, a binding contract or agreement shall be required for participation. (d) The operation and maintenance agreement shall be referenced on the final plat and shall be recorded with the appropriate county Register of Deeds upon final plat approval. (e) If no subdivision plat is recorded for the site, then the operation and maintenance agreement shall be recorded with the appropriate county Register of Deeds so as to appear in the chain of title of all subsequent purchasers under generally accepted searching principles. (f) The operation and maintenance agreement shall require the owner or owners' association to maintain, repair and, if necessary, reconstruct the stormwater control measures, and shall state the terms, conditions, and schedule of maintenance for such. (g) The owner of each stormwater control measure installed pursuant to this Ordinance shall maintain and operate it so as to preserve and continue its function in controlling water quality and quantity in accordance with the function for which it was designed. (h) The operation and maintenance agreement shall refer the property owner or owners' association to the City of High Point for specific maintenance requirements of stormwater control measures. In addition, it shall grant to the City a right of entry in the event that the Public Services Director has reason to believe it has become necessary to inspect, monitor, maintain, repair, or reconstruct the stormwater control measures. In no case shall the right of entry, of itself, confer an obligation on the City to assume responsibility for maintenance of the stormwater control measures. (i) The Public Services Director shall have the responsibility to inspect the engineered stormwater control structures annually, as required by NC Environmental Management Commission, to record the results on forms approved or supplied by the NCDWR, to inspect any other stormwater control measures as deemed necessary, and to notify the responsible property owner or owners' association when maintenance or repairs are required. (j) All required repairs and maintenance shall be performed within 90 days after such notice. In case of failure by the responsible party to perform the required maintenance or repairs within the stated period, the City may perform such maintenance or repairs and recover all costs attendant thereto from the landowner or owners' association. (k) For all stormwater control measures required pursuant to this Ordinance that are owned by a private property owner or an owners' association, the required operation and maintenance agreement shall include all of the following provisions: (1) Acknowledgment that the owner or owners' association shall continuously operate and maintain the stormwater control measures. (2) Establishment of an escrow account, which can be spent solely for sediment removal, structural, biological, or vegetative replacement, major repair, or reconstruction of the stormwater control measures. If stormwater control measures are not performing adequately or as intended or are not properly maintained, the City, in its sole discretion, may remedy the situation, and in such instances the City shall be fully reimbursed from the escrow account. (3) Escrowed funds may be spent by the landowner or owners' association for sediment removal, structural, biological or vegetative replacement, major repair, and reconstruction of the stormwater control measures. (4) Granting to the City a right of entry to inspect, monitor, maintain, repair, and reconstruct stormwater control measures. (5) Allowing the City to recover from the landowner or owners' association and its members any and all costs the City expends to maintain or repair the stormwater control measures or to correct any operational deficiencies. (6) Failure to pay the City all of its expended costs, after 45 days written notice, shall constitute a breach of the agreement. (7) In case of a deficiency, the City shall thereafter be entitled to bring an action against the owner or owners' association and its members to pay, or foreclose upon the lien hereby authorized by the agreement against the property, or both. Interest, collection costs, and attorney fees shall be added to the recovery. (8) A statement that this agreement shall not obligate the City to maintain or repair any stormwater control measure, and the City shall not be liable to any person for the condition or operation of stormwater control measures. (9) A statement that this agreement shall not in any way diminish, limit, or restrict the right of the City to enforce any of its ordinances as authorized by law. (10) A provision indemnifying and holding harmless the City for any costs and injuries arising from or related to the stormwater control measures, unless the City has agreed in writing to assume the maintenance responsibility and has accepted dedication of any and all rights necessary to carry out that maintenance. 6. Inspection Program (a) Inspections and inspection programs by the City may be conducted or established on any reasonable basis, including but not limited to routine inspections; random inspections; inspections based upon complaints or other notice of possible violations; and joint inspections with other agencies inspecting under environmental or safety laws. (b) Inspections may include, but are not limited to: (1) Reviewing maintenance and repair records; (2) Sampling discharges, surface water, groundwater, and material or water in stormwater control measures; and (3) Evaluating the condition of stormwater control measures. (c) If the owner or occupant of any land refuses to permit such inspection, the Public Services Director shall proceed to obtain an administrative search warrant pursuant to North Carolina General Statutes Section 15-27.2, as amended. (d) No person shall obstruct, hamper or interfere with the Public Services Director while carrying out their official duties. E. Watershed Development Plan 1. Plan Required A watershed development plan prepared by a North Carolina registered professional engineer in accordance with the requirements of this section shall be submitted to the Planning and Development Director for all development. 2. Construction Plans a Part of Watershed Development Plan The construction plans for required runoff control structure(s) shall be approved as part of the watershed development plan, and prior to issuance of any building or land disturbance permit on a site. For subdivisions, construction plans shall be submitted in accordance with Section 2.5.11, Preliminary Plan. 3. Master Watershed Development Plan (a) Where authorized by the TRC, a master watershed development plan may be approved for certain large-scale nonresidential and multi-family developments, in-lieu of a watershed development plan with the required construction plans. (b) Where authorized, the master watershed development plan shall be approved by the TRC prior to the recordation of any plat, or issuance of any grading or building permits for the total site. (c) Prior to the approval of any site plans or group development plans, grading permit, or building permit for any development site included on a given master watershed development plan, a site-specific watershed development plan shall be approved subject to the requirements of this section. 4. Plan Approval The TRC shall approve any watershed development plan that is in conformance with the requirements of this section. 5. Approved Plan a Prerequisite A watershed development plan shall be approved prior to the recordation of any plat, or issuance of any grading permit or building permit for the site. The Planning and Development and the Engineering Services Director are not authorized to issue any permits for development on any land unless a watershed development plan is approved, if one is required. 6. Stormwater Control Measures When stormwater control measures, including participation in a regional stormwater control program, is required for a development to comply with the requirements of this section, a North Carolina registered professional engineer shall prepare the plan with the Engineer's Certification of Runoff Control as set out in the City's Development Guide affixed, signed, sealed, and dated. F. Stormwater As-Built Plans Required Upon completion of a stormwater control measure, the developer shall certify to the Public Services Director that the completed project is in accordance with the approved plans and shall submit actual "as built" plans after final construction is completed. The plans shall show the final design specifications for all improvements and the field location, size, depth, and related measures, controls and devices, as installed. The designer shall certify, under seal, that the as-built design, measures, controls, and devices are in compliance with the approved plans and with the requirements of this Ordinance. A final inspection and approval by the Public Services Director shall occur before the release of the performance guarantee.
(Ord. No. 7266/17-08, § 27, 1-17-2017; Ord. No. 7287/17-29, §§ 12, 13, 4-3-2017; Ord. No. 7365/17-108, § 1, 11-20-2017; Ord. No. 7622/20-38, §§ 11.C, 11.E, 22, 8-5-2020; Ord. No. 7679/20-95, §§ 4.D—4.H, 12-9-2020)
Ask a question about High Point law
Corpus searches the High Point sections it holds and shows the ones that match, with their citations. Free, no sign-in.
