§ 6.2.9 — Protection of Fragile Areas
Code of Ordinances of the City of High Point, North Carolina (Codified through Ordinance No. 8067/25-45, enacted November 17, 2025 (Supp. No. 9)) · High Point Development Ordinance § 6.2.9
Corpus is an independent public-information project, not the official City of High Point website. Stable reference: corpuslaw.us/code/b4a05b99-9e39-42c4-b639-debdc10f6594
6.2.9. - Protection of Fragile Areas
A. Land Disturbance Minimization 1. Sedimentation and Erosion Control Asedimentation and erosion control plan shall be required in accordance with Section 6.3 of this Ordinance. 2. Development on the Best Soils and Terrain Development on the best soils and terrain of a site is encouraged. Hydric soils and those soils that are highly erodible should be avoided. 3. Low Impact Design Low Impact Design in accordance with Section 6.2.10, Low Impact Design, is encouraged. 4. Conservation Subdivision Development The location of development on soils and terrain most suited to protecting water quality is greatly encouraged by conservation subdivision (see Section 5.14.2, Conservation Subdivision). 5. Density Shifting The location of development on soils and terrain most suited to protecting the water quality of water supply reservoirs is encouraged (see Section 6.2.14 G, Density Shifting). B. Floodplain Protection Development in special flood hazard areas shall comply with the requirements of Section 6.4, Flood Damage Prevention. C. Surface Water Buffers 1. Applicability (a) This subsection applies to all development and activities with the exception of activities conducted under the authority of North Carolina, the United States, multiple jurisdictions or local units of government, and forest harvesting and agricultural activities, including agricultural ponds. (b) The NC Division of Water Resources shall administer the requirements of Rule 15A NCAC 02B .0724 and .0295 (Randleman Lake Water Supply Watershed: Protection and Maintenance of Existing Riparian Buffers and Mitigation Program Requirements for Protection and Maintenance of Riparian Buffers, respectively) for these jurisdictions and activities. 2. Perennial and Intermittent Surface Water Buffers Required (a) A surface water buffer shall be maintained with a minimum width as specified in Table 6.2.9.C1, Minimum Surface Water Buffer Width Requirements, measured landward from the normal water level for lakes and ponds and from the top of bank of each side for perennial and intermittent streams. (b) Wetlands adjacent to surface waters or within 50 feet of surface waters shall be considered as part of the surface water buffer but are regulated pursuant to applicable state and federal laws and rules. (c) These surface waters are indicated on any of the following maps or if there is site-specific evidence that indicates the presence of waters not shown on any of these maps: (1) The most recent version of either the United States Geological Survey 1:24,000 scale (7.5 minute quadrangle) topographic maps; or (2) The most recent version of the published manuscript of the soil survey map that shows stream layers prepared by the USDA Natural Resource Conservation Service; or (3) A map approved by the Geographic Information Coordinating Council and by the NC Environmental Management Commission. (d) Where the specific origination point of a perennial or an intermittent stream is in question, parties subject to this section shall request the Engineering Services Director to make a determination in accordance with Rule 15A NCAC 2B .0724(4). TABLE 6.2.9.C1: MINIMUM SURFACE WATER BUFFER WIDTH REQUIREMENTS WATER CLASSIFICATION | MINIMUM BUFFER WIDTH LOW DENSITY DEVELOPMENT [1] | HIGH DENSITY DEVELOPMENT [2] ZONE 1 (FEET) | ZONE 2 (FEET) | ZONE 1 (FEET) | ZONE 2 (FEET) | ZONE 3 (FEET) Perennial Surface Waters (Streams, Lakes and Ponds) | 50 | 100 30 | 20 [3] | 30 | 20 [3] | 50 Intermittent Surface Waters (Streams, Lakes and Ponds) | 50 | 50 30 | 20 [3] | 30 | 20 [3] | n/a NOTES: [1] Low Density Development is development that is equal to or less than 2 dwelling units per acre or 24 percent built-upon area in all watersheds except Randleman Lake. Low Density Development in the Randleman Lake watershed is development that is equal to or less than 1 dwelling unit per acre or 12 percent built-upon area [2] High Density Development is development that is greater than 2 dwelling units per acre or 24 percent built-upon area in all watersheds except Randleman Lake. High density development in the Randleman Lake watershed is development that is greater than 1 dwelling unit per acre or 12 percent built-upon area [3] Additional buffer requirements apply where surface waters abut moderate to steep slopes in accordance with Section 6.2.9 D, Slope and Buffer Protection 3. Exemption Based on On-site Determination (a) When a landowner or other affected party believes that the maps have inaccurately depicted surface waters, the landowner or affected party may submit a stream determination request to the Engineering Services Director. (b) Upon request, the Engineering Services Director shall make an on-site determination. (c) The Engineering Services Director may also accept the results of a surface water determination made by other qualified parties. (d) On-site surface water determinations shall expire 5 years from the date of the determination. (e) Any disputes over on-site surface water determinations shall be referred to the Director of the DWR in writing within 60 calendar days of written notification of the determination. (f) The decision by the Director of the DWR is subject to review as provided in Articles 3 and 4 of NCGS 150B. (g) Surface waters that appear on the maps shall not be subject to these buffer requirements if an on-site surface water determination reveals any of the following cases: (1) Ditches and manmade conveyances, to include manmade stormwater conveyances, other than modified natural streams, unless the ditch or manmade conveyance delivers untreated stormwater runoff from an adjacent source directly to an intermittent or perennial stream; (2) The absence on the ground of a corresponding perennial water body, intermittent water body, lake, reservoir or pond; (3) Ephemeral streams; or (4) Manmade ponds and lakes that are not fed by an intermittent or perennial stream nor have a direct discharge point to an intermittent or perennial stream. 4. Exemptions for Existing Development and Activities Existing development that was present within a surface water buffer on the effective date the surface water buffer requirements were established is allowed to continue and is exempt from the requirements of Section 6.2.9 C, Surface Water Buffers, to the extent specified below: (a) The exemption of existing development and uses includes but is not limited to existing agriculture, buildings, facilities, ground mounted equipment, utility lines, on-site sanitary sewage systems, maintained lawns and uses any of which involve either specific, periodic management of vegetation or displacement of vegetation by structures or regular activity. (b) Only the portion of the buffer that contains the footprint of the existing development is exempt. (c) Activities necessary to maintain existing development are allowed provided the site remains similarly vegetated, no built-upon area is added within the surface water buffer where it did not previously exist, and the requirements of Section 6.2.9 C.6.(b)(2), Stormwater Runoff Through Zones 1 & 2 of Surface Water Buffers, are met. (d) Grading and revegetating of Zones 2 and 3 is allowed for existing development upon review and approval of the TRC provided the health of the vegetation in Zone 1 is not compromised, the ground is stabilized, and the requirements of section 6.2.9 C.6.(b)(2), Stormwater Runoff Through Zones 1 and 2 of Surface Water Buffers, are met. (e) In addition, projects or development specified in 15A NCAC 02B .0724(6)(a) may be determined to be exempted in accordance with the requirements of that section. (f) The exemption to the buffer requirements shall cease when the existing development or use changes to another permissible or non-exempt use. Any new development or use shall be subject to the surface water requirements. 5. New Development and Activities N.C. Administrative Code Section 15A NCAC 02B .0724(11) lists potential new development and activities within the buffer and categorizes them as deemed allowable, allowable upon authorization, or allowable with mitigation upon authorization. All development and activities not categorized as deemed allowable, allowable upon authorization, or allowable with mitigation upon authorization are considered allowable with exception and may not proceed within the surface water buffer, or outside the buffer if the development or activity would impact the buffer, unless a watershed variance is granted in accordance with Section 2.4.16, Variance. Watershed development plan approval, as provided for in Section 6.2.9 C.9, Watershed Plan Approval, is required for all new development and activity that is allowable. Such an approved plan shall constitute written authorization for uses that are allowable upon authorization or allowable with mitigation upon authorization and a statement to that effect shall be included on the approved plan. The requirements for each category are as follows: (a) Development Deemed Allowable Development and activities designated as deemed allowable are permissible without issuance of an authorization certificate by the TRC provided that they adhere to the limitations of the activity as defined in NC Administrative Code Section 15A NCAC 02B .0724(11). In addition, artificial streambank and shoreline stabilization is allowable in the Uwharrie (Lake Reece) and Lake Thom-A-Lex water supply watersheds, and in any non-water supply watershed. Deemed allowable development and activities shall be designed, constructed, and maintained to minimize vegetation and soil disturbance and to provide the maximum water quality protection practicable, including construction, monitoring and maintenance activities. (b) Development Allowable Upon Authorization Development and activities designated as allowable upon authorization may proceed provided that there are no practical alternatives to the requested development or activity and an authorization certificate is issued in accordance with Section 6.2.9 C.10, Authorization Certificates. This includes construction, monitoring, and maintenance activities. In addition, in the Uwharrie (Lake Reece) and Lake Thom-A-Lex water supply watersheds, and in any non-water supply watershed, publicly-funded linear projects such as roads, greenways, and sidewalks; water dependent structures such as docks; and minimal footprint uses such as poles, signs, utility appurtenances, and security lights are allowed provided there are no practical alternatives for locating them elsewhere, the built-upon area is minimized and channelization of stormwater runoff is avoided. (c) Development Allowable with Mitigation Upon Authorization Development and activities designated as allowable with mitigation upon authorization may proceed provided that there are no practical alternatives to the requested development or activity, an authorization certificate is issued in accordance with Section 6.2.9 C.10, Authorization Certificates, and an appropriate mitigation strategy is approved in accordance with Section 6.2.9 C.11, Mitigation. 6. Surface Water Buffer Zones (a) Location Required surface water buffers consist of 2 or 3 zones depending on the density of development and stream classification, as shown in Table 6.2.9.C1, Minimum Surface Water Buffer Width Requirements. (1) Zone 1 Zone 1 shall be the first 30 feet landward on all sides from the top of the stream bank or normal water level of other water bodies measured horizontally on a line perpendicular to the surface water. (2) Zone 2 Zone 2 shall begin at the outer edge of Zone 1 and extend landward a minimum of 20 feet as measured horizontally on a line perpendicular to the surface water. The combined width of Zones 1 and 2 shall be 50 feet on all sides of the surface water. (3) Zone 3 Zone 3 shall begin at the outer edge of Zone 2 and extend landward 50 feet as measured horizontally on a line perpendicular to the surface water. (4) Additional Buffers (i) Refer to Section 6.2.9 D, Slope and Buffer Protection, for additional surface water buffers to protect steep slopes bordering streams. (ii) Such additional buffers would be added to Zone 2. (b) Standards Zones 1 and 2 shall be undisturbed except as allowed in this section. Zone 3 can be disturbed but must remain vegetated in accordance with these standards. (1) Development in Zones 1 and 2 (i) New development or land disturbing activities shall not be allowed in Zones 1 or 2 of the surface water buffer, except as allowed in NC Administrative Code Section 15A NCAC 02B .0724(10). (ii) Activities that cross the stream shall be constructed as close to 90 degrees relative to the stream as practicable. (iii) Allowed activities shall be designed, constructed and maintained to minimize vegetation and soil disturbance and protect water quality to the maximum extent practical. (iv) Grading and revegetating for activities in Zone 2 is allowed providing that the health of the vegetation in Zone 1 is not compromised. (2) Stormwater Runoff Through Zones 1 and 2 of Surface Water Buffers Stormwater runoff through Zones 1 and 2 of surface water buffers shall maintain dispersed flow, or if stormwater conveyances, such as roadside and other drainage ditches, are used to carry runoff through Zones 1 and 2 of surface water buffers, they must meet the requirements specified in Table 6.2.9.C.2, Stormwater Runoff Through Zones 1 & 2 of Surface Water Buffers. TABLE 6.2.9.C2: STORMWATER RUNOFF THROUGH ZONES 1 & 2 OF SURFACE WATER BUFFERS A. DEEMED ALLOWABLE | 1. New drainage conveyances from a primary Stormwater Control Measure (SCM) when designed to treat the drainage area to the conveyance and the conveyances comply with an approved watershed development plan. 2. New stormwater flow to existing drainage conveyances provided the addition of new flow does not result in the need to alter the conveyance. B. DEEMED ALLOWABLE UPON AUTHORIZATION | 1. New drainage conveyances from a primary Stormwater Control Measure (SCM) that are not approved under a State stormwater program or State-approved local government stormwater program. 2. New drainage conveyances when the flow rate is less than 0.5 cubic feet per second during the peak flow from the 0.75 inch per hour storm. 3. New stormwater runoff that has been treated through a level spreader-filter strip that complies with 15A NCAC 02H .1059. 4. Realignment of existing roadside drainage conveyances applicable to publicly funded and maintained linear transportation facilities when retaining or improving the design dimensions provided that no additional travel lanes are added, and the minimum required roadway typical section is used based on traffic and safety considerations. 5. Realignment of existing drainage conveyances retaining or improving the design dimensions provided that the size of the drainage area and the percent built-upon area within the drainage area remain the same. 6. New or altered drainage conveyances applicable to publicly funded and maintained linear transportation facilities provided that SCMs or BMPs from the NCDOT Stormwater Best Management Practices Toolbox are employed. 7. New drainage conveyances applicable to publicly funded and maintained linear transportation facilities that do not provide a stormwater control measure due to topography constraints provided other measures are employed to protect downstream water quality to the maximum extent practical. 8. New drainage conveyances where the drainage area to the conveyance has no new built-upon area and the conveyance is necessary only for bypass of existing drainage. NOTES: [1] Regardless of type, stormwater conveyances shall not erode through the buffer nor cause erosion to the receiving waterbody. [2] Other types of stormwater conveyances shall only be allowed upon approval of a watershed variance in accordance with Section 2.4.16, Variance. (3) Zone 3 (i) Zone 3 is required for all high density development. (ii) Zone 3 may be disturbed, but it must remain vegetated. (iii) New development shall not be allowed in Zone 3 of the surface water buffer, except those developments and activities allowed in Zones 1 and 2 where the TRC issues an authorization certificate. (iv) Allowed activities shall be designed, constructed and maintained to minimize vegetation and soil disturbance and protect water quality to the maximum extent practical. 7. Channelization Channelization of perennial or intermittent streams may be authorized by DWR or the Army Corps of Engineers. However, TRC may authorize access or crossings only in accordance with this Ordinance. 8. New Lots in the Surface Water Buffer To the extent practical, no new single-family or duplex residential lots shall be created which are entirely or partly contained within the surface water buffer. 9. Watershed Plan Approval The TRC shall approve a watershed development plan only if the plan proposes to avoid impacts to surface water buffers defined in Section 6.2.9 C, Surface Water Buffers, or where the plan proposes to impact such buffers, it demonstrates that the applicant has done the following, as applicable: (a) Determined the activity is exempt from requirements of this section; (b) Received an authorization certificate for activities in Zones 1 & 2 of the surface water buffers for the approved watershed development plan from the TRC pursuant to Section 6.2.9 C.10, Authorization Certificates; (c) Received approval of a mitigation plan pursuant to Section 6.2.9 C.11, Mitigation, of this Ordinance; or (d) Received a variance pursuant to Section 2.4.16, Variance. 10. Authorization Certificates (a) Applicants undertaking development or activities designated as allowable upon authorization, allowable with mitigation upon authorization, or allowable with exception shall submit a watershed development plan with a request for an authorization certificate to the TRC. The applicant shall demonstrate that the project meets all the following criteria: (1) The basic project purpose cannot be practically accomplished in a manner that would avoid or better minimize disturbance, preserve aquatic life and habitat and protect water quality; (2) The use cannot practically be reduced in size or density, reconfigured or redesigned to better minimize disturbance, preserve aquatic life and habitat and protect water quality; and (3) Stormwater control measures shall be used to minimize disturbance, preserve aquatic life and habitat and protect water quality. (b) The applicant shall submit a watershed development plan and written documentation in support of their assertion of no practical alternatives that contains the following: (1) An explanation of why this plan for the development or activity cannot be practically accomplished, reduced, relocated or reconfigured to avoid or better minimize disturbance to the riparian buffer, preserve aquatic life and habitat and protect water quality; and (2) Plans for any stormwater control measures proposed to be used to control the impacts associated with the development or activity. (c) Within 60 days of a submission that addresses subsection (b) above, the TRC shall review the entire project and issue an authorization certificate, deny the authorization certificate, or request additional information. When additional information is requested, the 60-day review period restarts upon receipt of all the additional information requested. A TRC decision that all the criteria in subsection (a) of this section are met shall result in issuance of an authorization certificate for the approved watershed development plan. Should TRC fail to take action or request additional information within the 60-day review period, then the requested authorization certificate shall be issued unless one of the following occurs: (1) The applicant agrees, in writing, to a longer period; (2) The TRC determines that the applicant has failed to furnish requested information necessary to make a decision; (3) The final decision is to be made pursuant to a watershed variance decision; (4) The applicant refuses access to its records or premises for the purpose of gathering information necessary for the TRC to make a decision; or (5) Information necessary for a decision is unavailable. (d) The TRC may attach conditions as provided in Section 2.3.10, Conditions of Approval, to the authorization certificate that ensure compliance with this Ordinance. 11. Mitigation Mitigation in accordance with the requirements of 15A NCAC 02B .0295 shall apply to persons who wish to impact a surface water buffer when one of the following applies: (a) An applicant received an authorization certificate pursuant to Section 6.2.9 C.10, Authorization Certificates, of this section for a proposed development or activity that is designated as allowable with mitigation upon authorization; or (b) An applicant received a variance pursuant to Section 2.4.16, Variance, of this Ordinance and is required to perform mitigation as a condition of a variance approval. 12. Surface Water Buffer Variances (a) Variations to or exceptions in the State watershed protection surface water buffer rules contained in this section are considered watershed variances in accordance with Section 2.4.16, Variances. (b) Variations to the requirements of this section that are more stringent than the State minimum requirements are considered watershed modifications in accordance with Section 6.2.16, Watershed Modifications. 13. Appeals (a) An appeal of an authorization certificate decision of TRC shall comply with Section 2.4.3, Appeal. (b) An appeal pursuant to the requirements of Section 6.2.9 C, Surface Water Buffers, which applies to activities conducted under the authority of the State, the United States, multiple jurisdictions or local units of government, forest harvesting and agricultural activities, shall be referred to the Director of the NCDWR for review, as provided for in North Carolina General Statutes Chapter 150B Articles 3 and 4. D. Slope and Buffer Protection 1. Purpose The purpose of this provision is to limit the loss of soil, reduce soil erosion, minimize excess stormwater runoff, lessen the degradation of surface waters, and protect the buffers so established to protect surface waters. To this end, an addition to the surface water buffer requirements of Section 6.2.9 C, Surface Water Buffers, shall be required when intermittent and perennial surface waters abut moderate to steep slopes. 2. Application (a) Such addition to the surface water buffer requirements shall only apply where that portion of the surface water is adjacent to moderate to steep slope areas. (b) For slopes with a value of 15 percent or less, no additional buffering is required. (c) For slopes of greater than 15 percent up to 25 percent, an additional 15-foot wide undisturbed buffer shall be required. (d) For slopes greater than 25 percent, an additional 30 feet of undisturbed buffer shall be required. (e) These calculations shall be made from each side of the surface water bank. (f) Such additional buffer required by this section shall extend Zone 2 of the surface water buffer. (g) In the case where Zone 3 is required, the extension of the Zone 2 surface water buffer may be offset by an identical decrease in width in Zone 3. 3. Determination (a) The determination of whether such moderate to steep slope areas exist adjacent to a surface water shall be made by making 100 foot long perpendicular measurements at intervals, not greater than 50 feet in length, or at intervals as otherwise determined by the TRC, along the entire length of the surface water as measured from the top of bank. (b) These measurements shall be based on the most recent topographic survey of land that utilizes the smallest contour interval. (c) Applicants should consult the Development Guide for specific calculations, instructions, and illustrations. E. Additional Protection in Watershed Critical Areas Due to the proximity of watershed critical area (WCA)s to water supply reservoirs, fragile areas including steep slopes near perennial and intermittent streams, wetlands and drainage areas merit additional protection as prescribed in Section 3.8.12, Watershed Overlay (WSO) District.
(Ord. No. 7266/17-08, § 27, 1-17-2017; Ord. No. 7287/17-29, § 12, 4-3-2017; Ord. No. 7679/20-95, § 4.B, 12-9-2020)
Ask a question about High Point law
Corpus searches the High Point sections it holds and shows the ones that match, with their citations. Free, no sign-in.
