For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6.4.2 — Application, Permit, and Certification Requirements

Code of Ordinances of the City of High Point, North Carolina (Codified through Ordinance No. 8067/25-45, enacted November 17, 2025 (Supp. No. 9)) · High Point Development Ordinance § 6.4.2

Corpus is an independent public-information project, not the official City of High Point website. Stable reference: corpuslaw.us/code/cc2bfb49-59ac-43c0-8840-dca727b1c95e

6.4.2. - Application, Permit, and Certification Requirements

A. Application Requirements An application for a floodplain development permit shall be prepared in accordance with the requirements in the Development Guide , the certification requirements in Section 6.4.2 B below, and submitted in accordance with the requirements of Section 2.5.8, Floodplain Development Permit. B. Certification Requirements Development subject to this section shall comply with the following requirements: 1. Elevation Certificates (a) Before the Start of Construction (1) An elevation certificate (FEMA Form 81-31) is required prior to the actual start of any new construction. (2) Certification of the elevation of the reference level, in relation to mean sea level shall be submitted. (3) The Engineering Services Director shall review the certificate data submitted. Deficiencies shall be corrected by the applicant. (4) Failure to submit the certification or failure to make required corrections shall be cause to deny a floodplain development permit. (b) After Reference Level Established (1) An elevation certificate (FEMA Form 81-31) is required after the reference level is established. (2) Within 7 calendar days of establishment of the reference level elevation, the applicant shall submit a certification of the elevation of the reference level, in relation to mean sea level. (3) Any work done within the 7 day calendar period and prior to submission of the certification shall be at the applicant's risk. (4) The Engineering Services Director shall review the certificate data submitted. Deficiencies detected by such review shall be corrected by the applicant immediately and prior to further work being permitted to proceed. (5) Failure to submit the certification or failure to make required corrections shall be cause to issue a stop-work order for the project. (c) Final As-Built Elevation Certificate (1) A final as-built elevation certificate (FEMA Form 81-31) is required after construction is completed and prior to issuance of a certificate of occupancy. (2) The permit holder shall submit a certification of final as-built construction of the elevation of the reference level and all attendant utilities to the Engineering Services Director. (3) The Engineering Services Director shall review the certificate data submitted. Deficiencies detected shall be corrected by the permit holder immediately and prior to issuance of a certificate of occupancy. (4) In some instances, another certification may be required to certify corrected as-built construction. (5) Failure to submit the certification or failure to make required corrections shall be cause to withhold the issuance of a certificate of occupancy. 2. Floodproofing Certificate (a) If non-residential floodproofing is used to meet the regulatory flood protection elevation requirements, a floodproofing certificate (FEMA Form 81-65), with supporting data, an operational plan, and an inspection and maintenance plan are required prior to the actual start of any new construction. (b) The applicant shall submit to the Engineering Services Director a certification of the floodproofed design elevation of the reference level and all attendant utilities, in relation to mean sea level. (c) Floodproofing certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. (d) The Engineering Services Director shall review the certificate data, the operational plan, and the inspection and maintenance plan. Deficiencies detected by the review shall be corrected by the applicant prior to floodplain development permit approval. (e) Failure to submit the certification or failure to make required corrections shall be cause to deny a floodplain development permit. (f) Failure to construct in accordance with the certified design shall be cause to withhold the issuance of a certificate of occupancy. 3. Manufactured Dwelling If a manufactured dwelling is placed within Zone A, AO, AE, or A1-30 and the elevation of the chassis is more than 36 inches in height above grade, an engineered foundation certification is required in accordance with the provisions of Section 6.4.3 B, Specific Standards. 4. Watercourse Alteration All the following items shall be submitted by a permit holder to the Engineering Services Director prior to issuance of a floodplain development permit if a watercourse is to be altered or relocated: (a) A description of the extent of watercourse alteration or relocation; (b) A professional engineer's certified report on the effects of the proposed project on the flood-carrying capacity of the watercourse and the effects to properties located both upstream and downstream; and (c) A map showing the location of the proposed watercourse alteration or relocation. 5. Certification Exemptions The following structures, if located within Zone A, AO, AE or A1-30, are exempt from the elevation/floodproofing certification requirements specified in this subsection: (a) Recreational vehicles meeting requirements of Section 6.4.3 B.5, Recreational Vehicles; (b) Temporary nonresidential structures meeting requirements of Section 6.4.3 B.6, Temporary Non-Residential Structures; and (c) Accessory Structures less than 150 square feet meeting requirements of Section 6.4.3 B.7, Accessory Structures.

Ask a question about High Point law

Corpus searches the High Point sections it holds and shows the ones that match, with their citations. Free, no sign-in.