For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1305 — Stormwater, flood hazard areas

Code of Ordinances of the City of Rocky Mount, North Carolina (Codified through Ordinance No. O-2025-71, enacted November 10, 2025. (Supp. No. 90)) · Rocky Mount City Code § 1305

Corpus is an independent public-information project, not the official City of Rocky Mount website. Stable reference: corpuslaw.us/code/b2a3538c-b3eb-474e-ac73-54ca0aa85001

Sec. 1305. - Stormwater, flood hazard areas.

A. Purpose and scope. 1. These regulations and standards are designed, intended and should be administered in a manner to protect the various drainage areas in the city from flooding; to provide clean and sanitary channels for runoff; to prevent pollution of watersheds, streams and natural drainage channels; to prevent the encroachment of buildings and improvements on natural drainage channels; to equitably apportion the cost of improvements; to protect natural scenic areas; to provide for the conservation of the natural resources of the area, and to implement resolutions established by the Federal Emergency Management Administration (FEMA). 2. All subdivisions of land and all improvements of any character which affect drainage in any portion of the city shall be subject to the provisions of these regulations for the protection of public health, safety and general welfare of the city. B. Finding of fact. The periodic flooding of areas within the city results in hazards to life and property, in the disruption of commerce and governmental services, extraordinary expenditures of flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare. Flood and associated losses are caused by the location in flood hazard areas of buildings, structures and uses of land which are inadequately protected from flooding and erosion, and which contribute to flooding by impeding the flow of drainage and by increasing flood heights through displacement of stormwater in flood hazard areas. C. Classification of drainage channels. For the purpose of these regulations drainage shall be classified as follows: 1. Surface drainage is runoff of such a limited quantity and/or slow rate that it does not cause erosion of a defined channel. 2. A minor tributary is any drainage channel having a drainage basin of one hundred (100) acres or less in area. 3. A major tributary is any channel having a drainage basin of not less than one (1) square mile or greater than twenty-five (25) square miles. D. Designation of responsibility. It is intended that responsibility for drainage be allocated as follows, unless otherwise specifically designated: 1. The developer of a subdivision is responsible for the following: a. Construction of facilities to accommodate the increased surface drainage within the subdivision and future developed flows from upstream properties and shall convey same to a point on an identified existing watercourse or storm drainage network system. Such storm drainage system shall have the hydraulic capability to accommodate the increased surface water flow or be modified by the developer in a manner which will do so. b. Obtaining off-site flowage easements and the construction of facilities to accommodate increased flow. Such shall be dedicated to the city. Where such off-site facilities are necessary, the city shall allow the developer the option of constructing on-site retarding and retention structures to limit the peak flow to predeveloped rates when environmental and economic conditions prohibit or make unfeasible off-site improvements. c. The improvement of all minor and major tributaries and channels lying within the subdivision. d. Mitigate any increase in rate or quantity of runoff in any storm drain pipe minor or major tributary or major channel which results from the development of the subdivision. e. Provision for the maintenance of all stormwater systems and fringe areas of tributaries and channels which have not been dedicated to the public. 2. The city and other levels of government will be responsible for the maintenance of drainage facilities dedicated to the public. E. Drainage and sewers outside subdivision boundaries. The city reserves the right to require improvements, provisions of drainage easements, and for provision of agreements beyond the boundaries of the subdivision to facilitate flow of water through the addition, to avoid probability of law suits based on damage from changed runoff in the subdivision, and to provide continuous improvement of the overall storm drainage system. Requirements outside the addition may include: 1. Improvements may be required in channels or storm sewers flowing to or from the addition, or in channels or storm sewers located in adjacent areas that are affected by flow of water from the addition. 2. The following kinds of improvements may be required: a. Enlargement or replacement of undersized drainage structures to provide free flow. b. Removal of obstructions. c. Straightening of channel. d. Widening or deepening of the channel. e. Construction of erosion control structures. f. Back sloping, sodding and/or rip rapping of bank. g. Construction of closed or open paved storm sewers for the purposes of closing gap or continuation of overall storm sewer system. 3. Property owner agreements, where required, shall be designed to protect the city from probable lawsuits for damage, caused by changed runoff condition. 4. When subdivision development will result in increased runoff beyond the boundaries of the subdivision which cannot be accommodated through channel improvements without causing downstream flooding or erosion, the planning board may require the construction of one (1) or more retention reservoirs on the subdivision which will temporarily impound and discharge water from the subdivision site at the rate of volume equivalent to the discharge from the underdeveloped subdivision site at a rate and volume that the off-site channel is capable of taking. The design shall be as indicated in the city's specifications. Plans shall be approved by the director of public works. The construction shall be the responsibility of the developer. The responsibility for maintenance shall be determined on a case-by-case basis during the subdivision review process.

(Ord. No. O-2021-2, § 4, 1-11-21)

Ask a question about Rocky Mount law

Corpus searches the Rocky Mount sections it holds and shows the ones that match, with their citations. Free, no sign-in.