For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21-41.2 — Prohibited discharge standards defense

Code of Ordinances of the City of Rocky Mount, North Carolina (Codified through Ordinance No. O-2025-71, enacted November 10, 2025. (Supp. No. 90)) · Rocky Mount City Code § 21-41.2

Corpus is an independent public-information project, not the official City of Rocky Mount website. Stable reference: corpuslaw.us/code/b201af0e-35b3-427e-917a-35319b24fe42

Sec. 21-41.2. - Prohibited discharge standards defense.

A user shall have an affirmative defense to an enforcement action brought against it for noncompliance with the general prohibitions in subsection 21-30.1(a) or the specific prohibitions in subsections 21-30.1(b)(2), (3), (5)—(7) and (9)—(21) if it can prove that it did not know, or have reason to know, that its discharge, whether alone or in conjunction with discharges from other sources, would cause pass through or interference and that either: (1) A local limit exists for each pollutant discharged and the user was in compliance with each limit directly prior to and during the pass through or interference; or (2) No local limit exists, but the discharge did not change substantially in nature or constituents from the user's prior discharge when city was regularly in compliance with its NPDES permit, and in the case of interference, was in compliance with applicable sludge use or disposal requirements. (3) An upset means an exceptional incident in which there is an unintentional and temporary noncompliance with the limits contained in this ordinance or with permittee permit limits because of factors beyond the reasonable control of the permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed or inadequate treatment facilities, lack of preventative maintenance, or careless or improper operations. An upset may constitute an affirmative defense for action brought for the noncompliance. The permittee has the burden of proof to provide evidence and demonstrate that none of the factors specifically listed above were responsible for the noncompliance.

(Ord. No. O-2013-71, § 1(Exh. A), 6-24-13)

Ask a question about Rocky Mount law

Corpus searches the Rocky Mount sections it holds and shows the ones that match, with their citations. Free, no sign-in.