For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 908 — Development standards

Code of Ordinances of the City of Rocky Mount, North Carolina (Codified through Ordinance No. O-2025-71, enacted November 10, 2025. (Supp. No. 90)) · Rocky Mount City Code § 908

Corpus is an independent public-information project, not the official City of Rocky Mount website. Stable reference: corpuslaw.us/code/c2703711-7b9f-48ce-8bf9-08e6a4d29bad

Sec. 908. - Development standards.

The following development standards shall apply to all uses and structures permitted in subdistrict AE of the floodplain protection zoning overlay. A. General standards. The following general standards shall apply to development permitted outside of the floodway in subdistrict AE of the floodplain protection zoning overlay. 1. All new construction and substantial improvements shall be designed (or modified) and adequately anchored to prevent flotation, collapse, and lateral movement of the structure. 2. All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage in accordance with the latest edition of the FEMA Flood Damage-Resistant Materials Requirements. 3. All new construction and substantial improvements shall be constructed by methods and practices that minimize flood damages. 4. All new electrical, heating, ventilation, plumbing, air conditioning equipment, and other service equipment shall be located at or above the regulatory flood protection elevation or designed and installed to prevent water from entering or accumulating within the components during the occurrence of the base flood. These include, but are not limited to, HVAC equipment, water softener units, bath/kitchen fixtures, ductwork, electric/gas meter panels/boxes, utility/cable boxes, hot water heaters, and electric outlets/switches. a. Replacements part of a substantial improvement, electrical, heating, ventilation, plumbing, air conditioning equipment, and other service equipment shall also meet the above provisions. b. Replacements that are for maintenance and/or repair and not part of a substantial improvement may be installed at the original location provided the addition and/or improvements comply with the standards for new construction consistent with the code and requirements for the original structure. 5. All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system. 6. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into flood waters. 7. On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding. 8. Nothing in this chapter shall prevent the repair, reconstruction, or replacement of a building or structure existing on the effective date of the ordinance from which this chapter derived and located totally or partially within the floodway, non-encroachment area, or stream setback, provided there is no additional encroachment below the regulatory flood protection elevation in the floodway, non-encroachment area, or stream setback, and provided that such repair, reconstruction, or replacement meets all of the other requirements of this chapter. 9. New solid waste disposal facilities and sites, hazardous waste management facilities, salvage yards, and chemical storage facilities shall not be permitted, except by variance as specified in section 909.E.10. A structure or tank for chemical or fuel storage incidental to an allowed use or to the operation of a water treatment plant or wastewater treatment facility may be located in a special flood hazard area only if the structure or tank is either elevated or floodproofed to at least the regulatory flood protection elevation and certified in accordance with the provisions of section 905.B.3. 10. All subdivision proposals and other development proposals shall be consistent with the need to minimize flood damage. 11. All subdivision proposals and other development proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage. 12. All subdivision proposals and other development proposals shall have adequate drainage provided to reduce exposure to flood hazards. 13. All subdivision proposals and other development proposals shall have received all necessary permits from those governmental agencies for which approval is required by federal or state law, including Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. 14. When a structure is partially located in a special flood hazard area, the entire structure shall meet the requirements for new construction and substantial improvements. 15. When a structure is located in multiple flood hazard zones or in a flood hazard risk zone with multiple base flood elevations, the provisions for the more restrictive flood hazard risk zone and the highest BFE shall apply. 16. No new development is allowed in the buffer except for water development structures and public projects such as road crossings and greenways where no practical alternative exists. These activities should minimize built-upon surface area, direct runoff away from the surface waters, and maximize utilization of stormwater best management practices, including preserving natural vegetation. 17. Roads. All new roads shall be constructed such that the lowest road crown elevation is no more than one (1) foot below the 100-year base flood elevation. B. Specific standards. The following provisions are required: 1. Accessory uses and structures. Accessory uses and structures (sheds, detached garages, etc.) that are proposed to be placed in subdistrict AE of the floodplain protection zoning overlay require the issuance of a floodplain development permit. Accessory uses and structures that are four hundred (400) square feet in area or less must meet the following criteria. Accessory uses and structures that are larger than four hundred (400) square feet in area must meet all requirements of the floodplain protection zoning overlay. a. Accessory structures shall not be used for human habitation (including work, sleeping, living, cooking or restroom areas); b. Accessory structures shall be designed to have low flood damage potential; c. Accessory structures shall be constructed and placed on the building site so as to offer the minimum resistance to the flow of floodwaters; d. Accessory structures shall be firmly anchored in accordance with the standards of the floodplain protection zoning overlay; e. Service facilities such as electrical and heating equipment shall meet the standards of the floodplain protection zoning overlay; and f. Openings to relieve hydrostatic pressure during a flood shall be provided below base flood elevation in conformance with the standards of the floodplain protection zoning overlay and as approved by the city's director of public works. g. An accessory structure with a footprint less than one hundred forty-four (144) square feet and satisfies the criteria outlines above is not required to meet the elevation or floodproofing standards of section 908.B.3. Elevation or floodproofing certifications are required for all other accessory structures. 2. Critical facilities. Where approved in the floodplain protection zoning overlay, critical facilities shall be constructed on properly compacted fill and have the lowest floor (including basement) elevated at least one (1) foot above the elevation of the 500-year flood. A critical facility shall have at least one (1) access road connected to land outside the 500-year floodplain (subdistrict X) that is capable of supporting a four thousand (4,000) pound vehicle. The top of the road must be no lower than six (6) inches below the elevation of the 500-year flood. 3. Non-residential construction. a. Freeboard. New construction or substantial improvement of any commercial, industrial, or non-residential structure shall have the lowest finished floor, including basement, elevated no lower than one (1) foot above the base flood elevation on the FIRMS of June 18, 2013. Provided, however, when repair, reconstruction, rehabilitation, or remodeling within an existing structure is proposed, a property owner or authorized agent may make such repair, reconstruction, remodeling, or rehabilitation with the lowest finished floor elevation at or above the base flood elevation on the FIRMs of June 18, 2013, subject to the following conditions: 1) Existing finished floor elevation is at or above base flood elevation; 2) Proposed finished floor elevation is at or above the existing floor elevation; and 3) All construction occurs within the existing building and foundation (no expansion or addition). b. Measuring lowest finished floor. For the purposes of the floodplain protection zoning overlay, the lowest floor shall be measured from the top of the finished floor as defined herein. c. Flood proofing. Structures may be flood proofed to the flood protection level in lieu of elevation provided that all areas of the structure below the required elevation plus one (1) foot above the required elevation on the FIRMS of June 18, 2013, are watertight with walls substantially impermeable to the passage of water, using structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. d. Certification. A registered professional engineer or architect shall certify that the standards of this subsection are satisfied. A completed elevation certificate (FEMA Form 81-31 as amended) shall be provided to the administrator prior to the issuance of a certificate of occupancy by the city (see subsection 909.F.3). 4. Residential construction. a. Freeboard. New construction or substantial improvement of any residential structure (including manufactured homes) shall have the lowest finished floor, including basement, elevated no lower than one (1) foot above the base flood elevation on the FIRMS of June 18, 2013. Provided, however, when repair, reconstruction, rehabilitation, or remodeling within an existing structure is proposed, a property owner or authorized agent may make such repair, reconstruction, remodeling, or rehabilitation with the lowest finished floor elevation at or above the base flood elevation on the FIRMs of June 18, 2013, subject to the following conditions: 1) Existing finished floor elevation is at or above base flood elevation; 2) Proposed finished floor elevation is at or above the existing floor elevation; and 3) All construction occurs within the existing building and foundation (no expansion or addition). b. Measuring lowest finished floor. For the purposes of the floodplain protection zoning overlay, the lowest floor shall be measured from the top of the finished floor as defined herein. c. Solid foundations. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movement of floodwaters shall be provided. d. Anchoring manufactured homes. Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement, in accordance with the State of North Carolina Regulations for Manufactured/Mobile Homes, 1995 Edition, and any revision thereto adopted by the commissioner of insurance pursuant to G.S. § 143-143.15. Additionally, when the elevation would be met by an elevation of the chassis thirty-six (36) inches or less above the grade at the site, the chassis shall be supported by reinforced piers or other foundation elements of at least equivalent strength. When the elevation of the chassis is above thirty-six (36) inches in height an engineering certification is required. e. Certification. A registered professional engineer or architect shall certify that the standards of this subsection are satisfied. A completed elevation certificate (FEMA Form 81-31 as amended) shall be provided to the administrator prior to the issuance of a certificate of occupancy by the city. (See section 909.F.3). 5. Elevated buildings. New construction or substantial improvements of elevated buildings that include fully enclosed areas that are usable solely for the parking of vehicles, building access or storage in an area other than a basement and which are subject to flooding shall be designed to both preclude finished living space and to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. a. Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria: 1) Provide a minimum of two (2) openings having a total net area of not less than one (1) square inch for every square foot of enclosed area subject to flooding; 2) The bottom of all required openings shall be no higher than one (1) foot above grade; and 3) Openings may be equipped with screens, louvers, valves, or other coverings or devices provided they permit the automatic flow of floodwaters in both directions. b. Access to the enclosed area shall be the minimum necessary to allow for parking of vehicles (garage door) or limited storage of maintenance equipment used in connection with the premises (standard exterior door) or entry to the living area (stairway or elevator). c. The interior portion of such enclosed area shall not be partitioned or finished into separate rooms, except to enclose storage areas. d. The owner shall sign a statement agreeing not to convert the lower enclosed area to a use that is subject to water damage. 6. Fill and mitigation. a. Fill is not permitted in subdistrict floodway or non-encroachment area. b. It is the policy of the city to limit the amount of fill placed in subdistrict AE to maximize floodwater carrying capacity. However, in recognizing the necessity to provide flexibility the following standards are adopted. The city's director of public works shall approve all plans for fill and mitigation. c. The applicant for a floodplain development permit and/or special use permit may propose one (1) of the following options relative to placement of fill and mitigation. Fill mitigation, where required, shall be calculated up to the base flood elevation of the subject site. 1) Option 1. No mitigation shall be required if the standard for the appropriate category is met. For category 1, the city's director of public works may permit additional fill not to exceed twenty (20) percent of the amount allowed to provide for supporting structures (such as driveways and sidewalks), but not accessory uses and structures. Table 9-1: Fill Mitigation Category | Portion of Parcel in Subdistrict AE of the Floodplain Protection Zoning Overlay | Amount of Permitted Fill Without Required Mitigation (cubic yards) 1 | ¼ acre | 200 2 | ½ acre | 400 3 | ¾ acre | 600 4 | 1 acre | 800 5 | 2 acres | 1,600 6 | Each additional acre | 800 2) Option 2. For parcels where the proposed fill exceeds the limit for the appropriate category under Option 1, but is less than fifty thousand (50,000) cubic yards, the applicant/owner may pursue the following compensatory options: a) A payment may be made to the city that can be used in a stormwater mitigation project. For category 1 through 4, the city's director of public works shall approve the proposal under this option. For category 5 and 6, the planning board shall approve the proposal to pay a fee. The fee shall be established by city council and shall be paid to the city within thirty (30) days of the approval of a floodplain development permit. The fee shall be placed in a special fund and used by the city to construct equivalent compensatory storage on a parcel owned by the city within the same sub watershed/sub basin. b) Provide compensatory storage equal to the volume of fill in excess of the exemptions listed in paragraph (6)c.(1) of this chapter subject to the following conditions: i. The compensatory storage location is subject to approval by the city's director of public works and must be located within or connected to the same FEMA regulated floodplain boundary. ii. The fill offset may not be in a location subject to federal, state or local regulatory limitations on fill. iii. The amount of fill offset by conservation of unexcavated existing floodplain shall be considered equal to the amount of fill allowed under paragraph (6)c.(1) of this chapter, eight hundred (800) cubic yards per acre. The city's director of public works may approve higher volumes provided the applicant/owner submits a topographic survey and supporting calculations certified by a surveyor or engineer registered in the State of North Carolina. iv. A conservation easement dedicated to the city shall be placed on the compensatory storage facility to prevent development of the site or removal of the storage facility in perpetuity. c. Alternative fill mitigation measures may be approved by the city's director of public works provided the applicant/owner submits a floodplain analysis of the effective floodplain model prepared by a professional engineer, registered in the State of North Carolina, which demonstrates the proposed fill and alternative fill mitigation, if required, will not increase flood elevations in the model. The city's director of public works shall approve the analysis and may at his option, require an independent third-party review of the analysis prior to approval of the development plan. Furthermore, the city's director of public works shall require certification from the engineer that all fill and associated mitigation measures are installed in conformance with the approved plan prior to final approval of the completed improvements. 3) Option 3. For projects with proposed fill in the floodplain in excess of fifty thousand (50,000) cubic yards, the applicant/owner is required to submit a floodplain analysis of the effective floodplain model prepared by a professional engineer, registered in the State of North Carolina, which demonstrates the proposed fill and recommended fill mitigation, if required, will not increase flood elevations in the model. The city's director of public works shall approve the analysis and may, at his option, require an independent third-party review of the analysis prior to approval of the development plan. Furthermore, city's the director of public works shall require certification from the engineer that all fill and associated mitigation measures are installed in conformance with the approved plan prior to final approval of the completed improvements. 7. Manufactured home parks. The following standards shall apply to manufactured home parks: a. Manufactured homes that are placed or substantially improved on sites: 1) Outside of the manufactured home park or subdivision; 2) In a new manufactured home park or subdivision; 3) In an expansion to an existing manufactured home park or subdivision; or 4) In an existing manufactured home park or subdivision on which a manufactured home has incurred "substantial damage" as the result of a flood, shall be elevated on a permanent foundation such that the lowest floor of the manufactured home and its equipment are elevated in accordance with the regulatory flood protection elevation and is securely anchored to an adequately anchored foundation system to resist floatation, collapse, and lateral movement. b. Within existing manufactured home parks, individual homes may be replaced subject to compliance with the requirements set forth in the chapter listed below: Chapter 6—The replacement unit is of similar size, located on an approved space within the park; Chapter 7—The location of the replacement unit meets requirements for building separation; Chapter 8—Vehicle parking; and Chapter 9—The replacement unit is elevated as required by the standards contained in this floodplain protection zoning overlay. c. Manufactured homes that are placed or substantially improved on sites: 1) Outside of the manufactured home park or subdivision; 2) In a new manufactured home park or subdivision; 3) In an expansion to an existing manufactured home park or subdivision; or 4) In an existing manufactured home park or subdivision on which a manufactured home has incurred "substantial damage" as the result of a flood, shall be elevated on a permanent foundation such that the lowest floor of the manufactured home is elevated a minimum of one (1) foot above the base flood elevation on the FIRMs of June 18, 2013, or one (1) foot above the preliminary FIS, whichever is greater, and is securely anchored to an adequately anchored foundation system to resist floatation, collapse, and lateral movement. d. Manufactured homes that are not subject to section 908.7.C above shall be elevated so that either: 1) The lowest floor of the manufactured home is a minimum of one (1) foot above the FIRMS of June 18, 2013; or 2) The manufactured home chassis is supported by reinforced piers or other foundation elements of at least equivalent strength that are no less than thirty-six (36) inches in height above grade and are securely anchored to an adequately anchored foundation system to resist floatation, collapse, and lateral movement. 8. Outdoor storage. The following standards shall apply to outdoor storage: a. Outdoor storage is prohibited in subdistrict floodway or non-encroachment areas. b. Outdoor storage is a special use in the portion of subdistrict AE. As a special use, outdoor storage must meet one (1) of the following standards: 1) The location of the outdoor storage shall be above the base flood elevation on the FIRMs of June 18, 2013 plus two (2) feet; or 2) The applicant shall demonstrate appropriate measures that will secure such outdoor storage from leaving the site due to storm flow in the event of a flood or storm event, to the satisfaction of the city's director of development services or planning board, as required. 3) New solid waste disposal facilities, hazardous waste management facilities, salvage yards, and chemical storage facilities shall not be permitted in the special flood hazard areas, except by variance as specified in subsection 909.E.1.c. A structure or tank for chemical or fuel storage incidental to an allowed use or to the operation of a water treatment facility or wastewater treatment facility may be located in a special flood hazard area only if the structure or tank is either elevated or floodproofed to at least the regulatory flood protection elevation plus two (2) feet and certified according to subsection 908.B.3.d. 9. Recreational vehicles. a. Temporary placement. Recreational vehicles placed temporarily in flood hazard areas shall: 1) Be on site for fewer than one hundred eighty (180) consecutive days; or 2) Be fully licensed and ready for highway use (a recreational vehicle ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities, and security devices has no permanent attachments such as additions, rooms stairs, decks, and porches). b. Permanent placement. Recreational vehicles that do not meet the limitations of temporary placement shall meet all the requirements for new construction. 10. Subdivisions and major developments. a. Proposals for subdivisions and major developments shall be consistent with the need to minimize flood damage. b. Proposals for subdivisions and major developments shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage. c. Proposals for subdivisions and major developments shall have adequate drainage provided to reduce exposure to flood hazards. d. Base flood elevation data shall be provided for all subdivision proposals and other proposed development. e. Preliminary and final plats shall continue to indicate subdistrict boundaries. f. The design of subdivisions and major developments that are partially impacted by the floodplain protection zoning overlay and individual subdistricts shall ensure that components and phases of such developments are integrated and interconnected to the extent feasible. Master planning of such sites shall take these considerations into account. 11. Temporary uses and structures. Prior to the issuance of a floodplain development permit for a temporary use and/or structure the following requirements must be met: a. All applicants must submit to the city prior to the issuance of the floodplain development permit a plan for the removal of such structure(s) in the event of a hurricane or flash flood warning notification. The plan must include the following information: 1) The specified time period for which the temporary use will be permitted; 2) The name, address and phone number of the individual responsible for the removal of the temporary structure; 3) The time frame prior to the event at which a structure will be removed; 4) A copy of the contract or other suitable instrument with a trucking company to insure the availability of removal equipment when needed; and 5) Designation, accompanied by documentation, of a location outside the floodplain to which the temporary structure will be moved. 6) The above information shall be submitted with the application for a floodplain development permit. 12. Additions/improvements. a. Additions and/or improvements to pre-FIRM structures when the addition and/or improvements in combination with any interior modifications to the existing structure are: 1) Not a substantial improvement, the addition and/or improvements must be designed to minimize flood damages and must not be any more non-conforming than the existing structure. 2) A substantial improvement, with modifications/rehabilitations/improvements to the existing structure or the common wall is structurally modified more than installing a doorway, both the existing structure and the addition must comply with the standards for new construction. b. Additions to pre-FIRM or post-FIRM structures that are a substantial improvement with no modifications/rehabilitations/improvements to the existing structure other than a standard door in the common wall, shall require only the addition to comply with the standards for new construction. c. Additions and/or improvements to post-FIRM structures when the addition and/or improvements in combination with any interior modifications to the existing structure are: 1) Not a substantial improvement, the addition and/or improvements only must comply with the standards for new construction consistent with the code and requirements for the original structure. 2) A substantial improvement, both the existing structure and the addition and/or improvements must comply with the standards for new construction. d. Any combination of repair, reconstruction, rehabilitation, addition or improvement of a building or structure taking place during a ten-year period, the cumulative cost of which equals or exceeds fifty (50) percent of the market value of the structure before the improvement or repair is started must comply with the standards for new construction. For each building or structure, the ten-year period begins on the date of the first improvement or repair of that building or structure subsequent to the effective date of the ordinance from which this chapter is derived. Substantial damage also means flood related damage sustained by a structure on two (2) separate occasions during a ten-year period for which the cost of repairs at the time of each such flood event, on the average, equals or exceeds twenty-five (25) percent of the market value of the structure before the damage occurred. If the structure has sustained substantial damage, any repairs are considered substantial improvement regardless of the actual repair work performed. The requirement does not, however, include either: 1) Any project for improvement of a building required to correct existing health, sanitary or safety code violations identified by the building official and that are the minimum necessary to assume safe living conditions. 2) Any alteration of a historic structure provided that the alteration will not preclude the structure's continued designation as a historic structure. 13. Tanks. When gas and liquid storage tanks are to be placed within a special flood hazard area, the following criteria shall be met: a. Underground tanks. Underground tanks in flood hazard areas shall be anchored to prevent flotation, collapse or lateral movement resulting from hydrodynamic and hydrostatic loads during conditions of the design flood, including the effects of buoyancy assuming the tank is empty; b. Above-ground tanks, elevated. Above-ground tanks in flood hazard areas shall be elevated to or above the regulatory flood protection elevation on a supporting structure that is designed to prevent flotation, collapse or lateral movement during conditions of the design flood. Tank-supporting structures shall meet the foundation requirements of the applicable flood hazard area; c. Above-ground tanks, not elevated. Above-ground tanks that do not meet the elevation requirements of section B(2) of this section shall be permitted in flood hazard areas provided the tanks are designed, constructed, installed, and anchored to resist all flood-related and other loads, including the effects of buoyancy, during conditions of the design flood and without release of contents in the floodwaters or infiltration by floodwaters into the tanks. Tanks shall be designed, constructed, installed, and anchored to resist the potential buoyant and other flood forces acting on an empty tank during design flood conditions. d. Tank inlets and vents. Tank inlets, fill openings, outlets and vents shall be: 1) At or above the regulatory flood protection elevation or fitted with covers designed to prevent the inflow of floodwater or outflow of the contents of the tanks during conditions of the design flood; and 2) Anchored to prevent lateral movement resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy, during conditions of the design flood.

(Ord. No. O-19-57, § 3, 7-8-19)

Ask a question about Rocky Mount law

Corpus searches the Rocky Mount sections it holds and shows the ones that match, with their citations. Free, no sign-in.