§ 909 — Administration
Code of Ordinances of the City of Rocky Mount, North Carolina (Codified through Ordinance No. O-2025-71, enacted November 10, 2025. (Supp. No. 90)) · Rocky Mount City Code § 909
Corpus is an independent public-information project, not the official City of Rocky Mount website. Stable reference: corpuslaw.us/code/f93b274d-fc23-46e2-8b18-5e88eefdc311
Sec. 909. - Administration.
A. NFIP administrator. 1. The city's director of the department of development services, or his/her designee, hereinafter referred to as the "floodplain administrator", is hereby appointed to administer and implement the provisions of this chapter. In instances where the floodplain administrator receives assistance from others to complete tasks to administer and implement this chapter, the floodplain administrator shall be responsible for the coordination and city's overall compliance with the National Flood Insurance Program and the provisions of this chapter. 2. The duties shall include: a. Review and approve Class 1 floodplain development permits to assure that the requirements of the floodplain protection zoning overlay have been satisfied; b. Issue Class 2 floodplain development permits approved by the planning board. In issuing such permits, the floodplain administrator shall certify that all conditions required by the board have been met by the applicant prior to issuing the permit; c. Advise permittee that additional federal or state permits may be required, and if specific federal or state permits are known, require that copies of such permits be provided and maintained on file with the floodplain development permit; d. Notify adjacent communities and the North Carolina Department of Crime Control and Public Safety, Division of Emergency Management, state coordinator for the National Flood Insurance Program prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the federal emergency management agency; e. Assure that maintenance is provided within the altered or relocated portion of said watercourse so that the flood-carrying capacity is maintained; f. Prevent encroachments into floodways and non-encroachment areas unless the certification and flood hazard reduction provisions of the floodplain protection zoning overlay are met; g. Obtain the actual elevation in relation to mean sea level of the lowest finished floor including basement and all attendant utilities of all new or substantially improved structures; h. Obtain the actual elevation in relation to NAVD 1988 to which all new or substantially improved structures and utilities have been flood proofed; i. When flood proofing is utilized for a particular structure, obtain certifications from a registered professional engineer or architect; j. Where interpretation is needed as to the exact location of boundaries of the areas of the 100-year floodplain, 500-year floodplain, and/or a zoning overlay subdistrict make the necessary interpretation. Any person contesting the location of the boundary shall have a right of appeal to planning board within thirty (30) days of receipt of the written interpretation; k. When base flood elevation data or floodway data has not been provided per the National Flood Insurance Program, obtain, review, and reasonably utilize any base flood elevation data and floodway data or non-encroachment area data available from a federal, state, or other source, including data developed pursuant to the floodplain protection zoning overlay, in order to administer the provisions of the zoning overlay; l. When the exact location of boundaries of the 100-year floodplain (special flood hazard area), 500-year floodplain, and/or a zoning overlay subdistrict conflict with the current, natural topography information at the site the property owner may apply and be approved for a letter of map amendment (LOMA) by FEMA. A copy of the letter of map amendment issued from FEMA will be maintained by the administrator in the permit file; m. Make on-site inspections of work in progress. As the work pursuant to a floodplain development permit progresses, the floodplain administrator shall make as many inspections of the work as may be necessary to ensure that the work is being done according to the provisions of the local ordinance and the terms of the permit. In exercising this power, the floodplain administrator has a right, upon presentation of proper credentials, to enter on any premises within the jurisdiction of the community at any reasonable hour for the purposes of inspection or other enforcement action; n. Serve notices of zoning violations, revoke floodplain development permits and take corrective actions; o. Maintain all records pertaining to the administration of the floodplain protection zoning overlay and make these records available for public inspection; and p. Monitor development activity, including the placement or removal of fill, in the floodplain protection zoning overlay through on-site inspections on a regular and ongoing basis. Identify illegal activity and issue stop work orders. q. Issue stop-work orders as required. Whenever a building or part thereof is being constructed, reconstructed, altered, or repaired in violation of this chapter, the floodplain administrator may order the work to be immediately stopped. The stop-work order shall be in writing and directed to the person doing or in charge of the work. The stop-work order shall state the specific work to be stopped, the specific reason(s) for the stoppage, and the condition(s) under which the work may be resumed. Violation of a stop-work order constitutes a misdemeanor; r. Revoke floodplain development permits as required. The floodplain administrator may revoke and require the return of the floodplain development permit by notifying the permit holder in writing stating the reason(s) for the revocation. Permits shall be revoked for any substantial departure from the approved application, plans, and specifications; for refusal or failure to comply with the requirements of state or local laws; or for false statements or misrepresentations made in securing the permit. Any floodplain development permit mistakenly issued in violation of an applicable state or local law may also be revoked; s. Make periodic inspections throughout the special flood hazard areas within the jurisdiction of the community. The floodplain administrator and each member of his or her inspections department shall have a right, upon presentation of proper credentials, to enter on any premises within the territorial jurisdiction of the department at any reasonable hour for the purposes of inspection or other enforcement action; t. Follow through with corrective procedures of this chapter; u. Review, provide input, and make recommendations for variance requests; v. Maintain a current map repository to include, but not limited to, historical and effective FIS report, historical and effective FIRM and other official flood maps and studies adopted in accordance with the provisions of this chapter, including any revisions thereto including letters of map change, issued by FEMA. Notify State and FEMA of mapping needs; w. Coordinate revisions to FIS reports and FIRMS, including letters of map revision based on fill (LOMR-Fs) and letters of map revision (LOMRs). B. Inspections service administrator. 1. In administering the building code, the inspections service administrator and/or the administrator's representatives shall assist the floodplain administrator as directed in administering the requirements of the floodplain protection zoning overlay. 2. In particular, the approval of a building permit shall be in full conformance with an approved floodplain development permit. 3. The inspections services administrator can issue a stop work order for construction activity that is in violation of an approved floodplain development permit. C. Zoning inspector. 1. In administering the land development code, the zoning inspector shall assist the floodplain administrator as directed in administering the requirements of the floodplain protection zoning overlay. 2. In particular, the approval of a zoning certificate shall be in full conformance with an approved floodplain development permit. D. Floodplain development permit. 1. Standards. a. Floodplain development permit. A floodplain development permit shall be required before any land disturbance activity, storage of equipment, materials, new construction, or substantial improvement, alteration or expansion of an existing structure or building may take place in the floodplain protection zoning overlay. b. Expiration of permit. The approved floodplain development permit shall expire if a minimum of fifty (50) percent of the work approved has not been completed within twenty-four (24) months of issuance of the permit. If in that period there has been no significant change to the project and no significant changes to the floodplain protection zoning overlay, then the floodplain administrator may continue the floodplain development permit for another twenty-four (24) months. c. Class 1 and Class 2 permits. The process for issuing a floodplain development permit is administrative. There are two (2) permit types based on the nature of the proposed development. a) Class 1 permit. The Class 1 permit shall be reviewed and approved by the floodplain administrator. b) Class 2 permit. The Class 2 permit shall be reviewed and approved by the planning board, with a recommendation by the floodplain administrator. d. The following table indicates the development activity that requires the appropriate permit. Any use not explicitly noted shall require a minor permit, unless in the opinion of the floodplain administrator the development is of sufficient size and magnitude that a major permit is appropriate. Table 9-2: Floodplain Development Permits Development Activity | Class | Floodplain Administrator Approval | Planning Board Approval Accessory uses and structures | 1 | Yes | No Agricultural uses only when requiring construction of a structure or building | 1 | Yes | No Commercial, office, industrial, religious and related uses with an area of 10,000 square feet or less | 1 | Yes | No Commercial, office, industrial, religious and related uses with an area of more than 10,000 square feet | 2 | No | Yes Special uses 1 | 2 | No | Yes Critical facility | 2 | No | Yes Grading, placement of fill, removal of fill and other modifications of topography—Category 1—4 (See Note 2) | 1 | Yes | No Grading, placement of fill, removal of fill and other modifications of topography—Category 5 and 6 (See Note 2) | 2 | No | Yes Manufactured home park | 2 | No | Yes Nonconforming uses | 2 | No | Yes Off-street parking areas and commercial drives | 1 | Yes | No Outdoor storage that does not meet the definition of a critical facility | 1 | Yes | No Outdoor storage that meets the definition of a critical facility | 2 | No | Yes Passive recreation only when requiring construction of a structure or building | 1 | Yes | No Public building, structure or facility | 2 | No | Yes Recreational vehicles | 1 | Yes | No Residential structure (includes manufactured home) | 1 | Yes | No Residential subdivision plat—Four lots or less | 1 | Yes | No Residential subdivision plat—More than four lots | 2 | No | Yes Temporary uses and structures | 1 | Yes | No _____ 2. Floodplain development permit—Class 1. a. Application. The applicant shall submit a complete application to the floodplain administrator. Incomplete applications will not be considered. b. Site plan. The application shall include a site plan drawn to scale (one (1) inch equals one hundred (100) feet) that indicates existing and proposed topography (two (2) foot contours), elevations, the floodplain protection zoning overlay boundaries, structures (existing and proposed), utilities, grading/pavement areas, fill materials, storage areas, drainage facilities, easements, other site improvements and special flood hazard area boundaries. The site plan shall be prepared by a registered surveyor or civil engineer. The floodplain administrator will verify the location of the proposed development relative to the regulatory floodplains. c. Process. Once a complete application has been accepted by the floodplain administrator, it will be considered. The floodplain administrator will have no less than ten (10) working days and no more than twenty (20) working days to review the application and provide a written decision to the applicant. Notification to adjacent property owners by the city shall occur by certified letter once the application has been certified as complete. Applicants are encouraged to meet with the floodplain administrator and/or his/her representative to review the application prior to submittal. The floodplain administrator shall apply the criteria indicated below in considering the application. In rendering the decision, the floodplain administrator shall address each of these criteria. A written report shall be prepared. Appropriate conditions may be placed on the applicant by the floodplain administrator. d. Basis for decision. In considering applications for floodplain development permits, all technical evaluations, relevant factors, and standards specified in other sections of the floodplain protection zoning overlay shall be considered. A report shall be prepared indicating how the intent and objectives of the floodplain protection zoning overlay are fully met by the proposal and indicating that all applicable standards and requirements are met, or adjustments are recommended to the proposal to ensure all standards and requirements are met. The following criteria shall be considered, and conditions may be placed on the applicant to ensure that they are addressed sufficiently to ensure the public health, safety and general welfare are protected to the degree possible. 1) The danger that materials may be swept onto other lands to the injury of others; 2) The danger to life and property due to flooding or erosion damage; 3) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; 4) The importance of the services provided by the proposed facility to the community; 5) The necessity to the facility of a waterfront location, where applicable; 6) The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use; 7) The compatibility of the proposed use with existing and anticipated development; 8) The relationship of the proposed use to the comprehensive plan and floodplain management program; 9) The safety of access to the property in times of flood for ordinary and emergency vehicles; 10) The expected heights, velocity, duration, rate of rise, and sediment transport of the flood waters and the effects of wave action, if applicable, expected at the site; and 11) The costs of providing governmental services during and after flood conditions including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, and streets and bridges. e. Appeal. The decision of the floodplain administrator may be appealed to the planning board within thirty (30) days of receipt of the written decision. 3. Floodplain development permit—Class 2. a. Application. The applicant shall submit a complete application to the floodplain administrator. Incomplete applications will not be scheduled for consideration by the planning board. Once a complete submittal is certified, the floodplain administrator will schedule the application before the planning board. A submittal schedule will be established by the planning board each year. b. Site plan. The application shall include a site plan drawn to scale (one (1) inch equals one hundred (100) feet) that indicates existing and proposed topography (two (2) foot contour), elevations, the floodplain protection zoning overlay boundaries, structures (existing and proposed), utilities, grading/pavment areas, fill materials, storage areas, drainage facilities, easements, other site improvements, and special flood hazard area boundaries. The site plan shall be prepared by a registered surveyor or civil engineer. The floodplain administrator will verify the location of the proposed development relative to the regulatory floodplains. c. Process. Once a complete application has been accepted by the floodplain administrator, it will be placed on the agenda of the planning board. Notification to adjacent property owners by the city shall occur by certified letter once the application has been certified as complete. The floodplain administrator will have no less than ten (10) working days and no more than twenty (20) working days to review the application and provide a written recommendation with the application to the planning board. Applicants are encouraged to meet with the floodplain administrator and/or his/her representative to review the application prior to submittal. d. Basis for decision. In considering applications for floodplain development permits, all technical evaluations, relevant factors, and standards specified in other sections of the floodplain protection zoning overlay shall be considered. A report shall be prepared indicating how the intent and objectives of the floodplain protection zoning overlay are fully met by the proposal and indicating that all applicable standards and requirements are met, or adjustments are recommended to the proposal to ensure all standards and requirements are met. The following criteria shall be considered, and conditions may be placed on the applicant to ensure that they are addressed sufficiently to ensure the public health, safety and general welfare are protected to the degree possible. 1) The danger that materials may be swept onto other lands to the injury of others; 2) The danger to life and property due to flooding or erosion damage; 3) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; 4) The importance of the services provided by the proposed facility to the community; 5) The necessity to the facility of a waterfront location, where applicable; 6) The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use; 7) The compatibility of the proposed use with existing and anticipated development; 8) The relationship of the proposed use to the comprehensive plan and floodplain management program; 9) The safety of access to the property in times of flood for ordinary and emergency vehicles; 10) The expected heights, velocity, duration, rate of rise, and sediment transport of the flood waters and the effects of wave action, if applicable, expected at the site; and 11) The costs of providing governmental services during and after flood conditions including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, and streets and bridges. e. Appeal. The decision of the planning board shall be subject to review by the city council. Any petition for review shall be filed with the city clerk within thirty (30) days after service of the written decision on the aggrieved party. 4. Additional submittal information. a. Elevation. Where base flood elevation data is available, the application shall indicate the elevation of the lower floor (including basement) of all new and improved structures. If a non-residential structure is to be flood-proofed, the application shall indicate the elevation to which the structure will be flood proofed. b. Watercourse alterations. Where any watercourse will be altered or relocated as a result of proposed development, the application shall include: A description of the extent of watercourse alteration or relocation; an engineering report on the effects of the proposed project on the flood-carrying capacity of the watercourse and the effects to properties located both upstream and downstream; and a map showing the location of the proposed watercourse alteration or relocation. Where applicable, evidence of U.S. Corps of Engineers approval shall be submitted with the application. 5. Determinations for existing buildings and structures. For applications for building permits to improve buildings and structures, including alterations, movement, enlargement, replacement, repair, change of occupancy, additions, rehabilitations, renovations, substantial improvements, repairs of substantial damage, and any other improvement of or work on such buildings and structures, the floodplain administrator, in coordination with the building official, shall: a. Estimate the market value, or require the applicant to obtain an appraisal of the market value prepared by a qualified independent appraiser, of the building or structure before the start of construction of the proposed work; in the case of repair, the market value of the building or structure shall be the market value before the damage occurred and before any repairs are made; b. Compare the cost to perform the improvement, the cost to repair a damaged building to its pre-damaged condition, or the combined costs of improvements and repairs, if applicable, to the market value of the building or structure; c. Determine and document whether the proposed work constitutes substantial improvement or repair of substantial damage; and d. Notify the applicant if it is determined that the work constitutes substantial improvement or repair of substantial damage and that compliance with the flood resistant construction requirements of the North Carolina Building Code and this chapter is required. E. Variance procedures. 1. The board of adjustment as established by the City of Rocky Mount, hereinafter referred to as the "appeal board", shall hear and decide requests for variances from the requirements of this chapter. 2. Any person aggrieved by the decision of the appeal board may appeal such decision to the court, as provided in Chapter 7A of the North Carolina General Statutes. 3. Variances may be issued for: a. The repair or rehabilitation of historic structures upon the determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and that the variance is the minimum necessary to preserve the historic character and design of the structure; b. Water dependent facilities if determined to meet the definition as stated in Chapter 1 of the land development code, provided provisions of section 909, sections E(9)(b), (c), and (e) have been satisfied, and such facilities are protected by methods that minimize flood damages during the base flood and create no additional threats to public safety; or c. Any other type of development provided it meets the requirements of this section. 4. In passing upon variances, the appeal board shall consider all technical evaluations, all relevant factors, all standards specified in other sections of this chapter, and: a. The danger that materials may be swept onto other lands to the injury of others; b. The danger to life and property due to flooding or erosion damage; c. The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; d. The importance of the services provided by the proposed facility to the community; e. The necessity to the facility of a waterfront location as defined in Chapter 1 of the land development code of this chapter as a functionally dependent facility, where applicable; f. The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use; g. The compatibility of the proposed use with existing and anticipated development; h. The relationship of the proposed use to the comprehensive plan and floodplain management program for that area; i. The safety of access to the property in times of flood for ordinary and emergency vehicles; j. The expected heights, velocity, duration, rate of rise, and sediment transport of the floodwaters and the effects of wave action, if applicable, expected at the site; and k. The costs of providing governmental services during and after flood conditions including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, and streets and bridges. 5. A written report addressing each of the above factors shall be submitted with the application for a variance. 6. Upon consideration of the factors listed above and the purposes of this chapter, the appeal board may attach such conditions to the granting of variances as it deems necessary to further the purposes and objectives of this chapter. 7. Any applicant to whom a variance is granted shall be given written notice specifying the difference between the BFE and the elevation to which the structure is to be built and that such construction below the BFE increases risks to life and property, and that the issuance of a variance to construct a structure below the BFE may result in increased premium rates for flood insurance. Such notification shall be maintained with a record of all variance actions, including justification for their issuance. 8. The floodplain administrator shall maintain the records of all appeal actions and report any variances to the FEMA and the State of North Carolina upon request. 9. Conditions for variances: a. Variances shall not be issued when the variance will make the structure in violation of other federal, state, or local laws, regulations, or ordinances. b. Variances shall not be issued within any designated floodway or non-encroachment area if the variance would result in any increase in flood levels during the base flood discharge. c. Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief. d. Variances shall only be issued prior to development permit approval. e. Variances shall only be issued upon: (i) A showing of good and sufficient cause; (ii) A determination that failure to grant the variance would result in exceptional hardship; and (iii) A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, or extraordinary public expense, create nuisance, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances. 10. A variance may be issued for solid waste disposal facilities or sites, hazardous waste management facilities, salvage yards, and chemical storage facilities that are located in special flood hazard areas provided that all of the following conditions are met. a. The use serves a critical need in the community. b. No feasible location exists for the use outside the special flood hazard area. c. The reference level of any structure is elevated or floodproofed to at least the regulatory flood protection elevation. d. The use complies with all other applicable federal, state and local laws. e. The city has notified the Secretary of the North Carolina Department of Public Safety of its intention to grant a variance at least thirty (30) calendar days prior to granting the variance. F. Zoning certificates, building permits and FEMA certificates: 1. Zoning certificate. a. The application of a zoning certificate shall be fully consistent with the approval of a floodplain development permit, including fulfilling all conditions of the permit approval. b. The approval of a zoning certificate by the city shall only occur if the zoning certificate is in full conformance with an approved floodplain development permit. In the case of a conflict, the requirements of the floodplain protection zoning overlay and the approved floodplain development permit shall take precedence. 2. Building permit. a. The application for a building permit shall be fully consistent with the approval of a floodplain development permit, including fulfilling all conditions of the permit approval. b. The approval of a building permit by the city shall be in full conformance with an approved floodplain development permit. 3. FEMA certificates. a. An elevation certificate (FEMA Form 81-31) or a flood proofing certificate (FEMA Form 81-65) is required. It shall be the duty of the permit holder to submit to the city a certification of the elevation of the lowest floor or flood proofed elevation whichever is applicable, and HVAC equipment, as built in relation to mean sea level. The elevation certificate shall be based upon a survey prepared by a professional surveyor. b. The flood proofing certificate shall be prepared by a registered professional engineer or architect and shall indicate that the non-residential flood proofed structure meets the flood proofing criteria of the floodplain protection zoning overlay and FEMA. c. These certificates shall be filed with and approved by the city prior to the issuance of a certificate of occupancy by the city. G. Penalties. 1. Violation of the provisions of this chapter or failure to comply with any of its requirements, including violation of conditions and safeguards established in connection with grants of variance or special exceptions, shall constitute a Class 1 misdemeanor pursuant to G.S. § 143-215.58. Any person who violates this chapter or fails to comply with any of its requirements shall, upon conviction thereof, be fined not more than one hundred dollars ($100.00) or imprisoned for not more than thirty (30) days, or both. Each day such violation continues shall be considered a separate offense. 2. Nothing herein contained shall prevent the city from taking such other lawful action as is necessary to prevent or remedy any violation. H. Nonconformities. Nonconforming buildings or uses may not be enlarged, replaced, or rebuilt unless such enlargement or reconstruction is accomplished in conformance with the provisions of the floodplain protection zoning overlay.
(Ord. No. O-19-57, § 3, 7-8-19)
Ask a question about Rocky Mount law
Corpus searches the Rocky Mount sections it holds and shows the ones that match, with their citations. Free, no sign-in.
