Sec. 18-748. - Concept plan.

Before a stormwater management permit application is submitted, a stormwater concept plan shall accompany the TRC application. For projects not requiring TRC review, the applicant may schedule a pre-application conference. The purpose of this review is to discuss the post-construction stormwater management measures necessary for the proposed project, as well as to discuss and assess constraints, opportunities and potential approaches to stormwater management designs before formal site design engineering is commenced. Any relevant local watershed plans, the comprehensive plan, the CAMA plan, and other relevant resource protection plans should be consulted in the discussion of the concept plan. To accomplish this goal, the following minimum information shall be included in the concept plan, which shall also be submitted as part of the application: (a) Existing conditions and proposed site plan. Existing conditions and proposed site layout sketch plans, which illustrate at a minimum: existing and proposed topography; existence of any streams or other surface waters; mapping of predominant soils from soil surveys; boundaries of existing predominant vegetation; proposed limits of clearing and grading; and location of existing and proposed roads, buildings, parking areas and other impervious surfaces. (b) Natural resources inventory. The applicant shall submit a written or graphic inventory of natural resources at the site and surrounding area as it exists prior to the commencement of the project based on available site data and available GIS information. This description should include a discussion of soil types, forest cover, significant geologic features, topography, wetlands, and native vegetative areas on the site, as well as the location and boundaries of other natural feature protection and conservation areas such as lakes, ponds, floodplains, stream buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.). Particular attention should be paid to environmentally sensitive features that provide particular opportunities or constraints for development and stormwater management. This information can be incorporated into the site inventory as required in article 3. (c) Stormwater management system concept plan. A written or graphic concept plan of the proposed post-development stormwater management system including: preliminary selection and location of proposed structural stormwater controls; low-impact design elements; preliminary sizing, location of existing and proposed conveyance systems such as grass channels, swales, and storm drains; flow paths; location of floodplain/floodway limits; relationship of site to upstream and downstream properties and drainages; and preliminary location of any proposed stream channel modifications, such as bridge or culvert crossings.

(Ord. No. O-2009-92, § 2, 9-15-09; Ord. No. O-2016-35, § 12, 5-3-16)