§ 18-750 — Stormwater management measures within the NC State Ports area and the CBD and RFMU districts
Code of Ordinances of the City of Wilmington, North Carolina (Supp. No. 43, Update 1: codified through Ordinance No. O-2026-51, enacted October 20, 2026) · Wilmington Code of Ordinances § 18-750
Corpus is an independent public-information project, not the official City of Wilmington website. Stable reference: corpuslaw.us/code/f45974c2-8bdf-4063-a133-2d0d1bd3a327
Sec. 18-750. - Stormwater management measures within the NC State Ports area and the CBD and RFMU districts.
In the NC State Ports area and the CBD and RFMU districts, stormwater management plans must include on-site measures that meet the performance standards of this section. (a) The following water quality performance standards must be met with use of approved best management practices (BMPs): (1) The project shall control and treat the run-off from the first one and one-half (1½) inches of rain; or (2) The project shall control and treat the difference in stormwater run-off between the pre-development and post-development conditions for the one-year, twenty-four-hour storm, whichever is greater. (b) The following is a list of BMPs deemed approved if designed and constructed according to the Technical Standards and Specifications Manual, the NC DENR BMP Manual or the New Hanover County-Wilmington LID Guidance Manual, whichever is more stringent: (1) Vegetative roof cover. (2) Permeable pavement. (3) Infiltration devices. (4) Bioretention devices. (5) Other devices in the city Technical Standards and Specifications Manual, NC [DENR] BMP Manual, and New Hanover County-Wilmington LID Guidance Manual. (c) The following BMPs may be considered on a case-by-case basis as approved by the city manager: (1) Proprietary devices with design flow rates that have been approved for use by the city engineer on a case-by-case basis to meet water quality standards; and (2) Cisterns with demonstrated capacity and use-assurance to meet requirements. (d) Redevelopment projects exempt. Redevelopment projects in the NC State Port area and the CBD and RFMU districts that meet all of the following criteria are exempt from the provisions of this section: (1) The redevelopment creates no net increase in total site impervious surface area over existing site conditions; (2) The proposed redevelopment provides stormwater controls that are equal or better than the previous development; and (3) A site plan application for the redevelopment project has been accepted as complete within twelve (12) months of the issuance of any demolition permit for existing structures on the site and an approved site plan is received within twelve (12) months. The city manager may grant an extension of ninety (90) days to receive an approved permit if substantial progress has been made. If a site plan is substantially changed subsequent to the expiration of twelve (12) months from demolition permit issuance, the site plan will be reviewed as a new development application. (e) Redevelopment projects in the CBD and RFMU districts that are part of a larger common plan of development that has previously been permitted as meeting the criteria above for redevelopment shall also be exempt from the provisions of this section. (f) Other considerations. This section does not apply to projects for which a stormwater permit has been issued prior to the adoption of this ordinance (September 15, 2009). No waivers shall be made retroactive to the effective date of this section. No refunds shall be considered for fees assessed prior to the effective date of this section.
(Ord. No. O-2009-92, § 2, 9-15-09; Ord. No. O-2015-21, § 2, 3-3-15)
Ask a question about Wilmington law
Corpus searches the Wilmington sections it holds and shows the ones that match, with their citations. Free, no sign-in.