17.18.030 Supply and Service Pipes.

(a) Water services for all new construction shall be constructed using materials of the type approved by the Director. (b) Reconstruction of premises where an existing water service is present shall require the supply pipe to be replaced if it is of a material such as galvanized steel, lead, pitted copper, or other material deemed to be unacceptable by the Director, or has been previously repaired, or is considered to be in poor condition. (c) Each supply pipe and each service pipe shall have an earth cover of not less than five feet below the finished grade. There shall be no joints within copper supply pipes. There shall be no joints within copper service pipes from one foot outside the service entrance of the building to the meter. (d) Repair. When a supply pipe needing repair is determined to be of a material such as galvanized steel, lead, pitted copper, or other material deemed to be unacceptable by the Director, the supply pipe shall be replaced. When a water supply pipe or water service pipe is of acceptable material, it may be repaired.

(Ord. 19533 §13; May 9, 2011: prior Ord. 18265 §4; November 3, 2003: Ord. 18041 §1; July 22, 2002: Ord. 13892 §47; July 16, 1984)