§ 41:16-3-2: Design Standards.

1. Within a buffer area, a solid and continuous landscape screen shall be planted and maintained. Planted materials in the buffer zone shall be placed within the buffer and shall be sufficiently large and planted in such a fashion that a screen at least eight feet high, occupying 50% of the width of the buffer shall be produced within three growing seasons. The buffer may consist of evergreen and deciduous plants, natural features, berms, fencing, mounds or combinations to achieve objectives. A variety of plant material providing seasonal color and interest should be provided. Possible arrangement of plant material includes plantings in parallel, serpentine or broken rows. If planted berms are used, the minimum top width shall be four feet and the maximum side slope shall be 2:1. The intense density of the buffer screen may be reduced by the board if it is found that the proposed use is visually attractive and not detrimental to the appearance of the neighboring uses. 2. All buffer zones and other areas subject to the landscaping requirements of this section, including all trees, shrubbery, grass and fences located therein, shall be properly maintained for a period of 12 months. The applicant or developer shall post with the City a maintenance bond in an amount equal to 1/2 of the total cost of the installation of all landscaping required by this section. Said maintenance bond shall be in addition to any performance bond required. All plantings which shall fail to survive for a period of 24 consecutive months shall be replaced by the applicant or developer at their expense. Such replacement shall be made within 60 days following a written demand for replacement or within such extended period of time as may be specified. Such replacement plantings shall conform to the standards applicable to original plantings as set forth in this section.

[Adopted 11-1-2023 by Ord. No. 6PSF-E, 11-01-2023 ]

Ask a question about Newark law

Corpus searches the Newark sections it holds and shows the ones that match, with their citations. Free, no sign-in.