Sec. 32-176. - Specific standards.

(a) Utilities. Under this division, construction permits shall be applied for and issued to the contractor responsible for the actual placement of the utility in order that the city will be properly informed of the exact dates and times of construction activity. Test requirements shall include the following: (1) Trenching. a. Pipe bedding. One field density per 150 linear feet (lf). b. Backfill. One field density per 150 linear feet (lf) per two feet depth of backfill (each side). (2) Services. Service stubouts: One field density per every third service (not per lift). (3) Manholes. a. Soil density tests. b. One field density per footing to be poured. c. One field density per 24 inches of backfill around the manhole. d. Materials tests. e. One mortar test per manhole per day. f. One concrete test per manhole per day. (4) Miscellaneous concrete structures. a. One field density per structure. b. One concrete test per structure. Densities are per ASTM D-2922, D-1556 or D-2167. (b) Moisture density relationship of soils. Moisture-density relationship of soils shall meet AASHTO-T180 or ASTM D-1557 as required by changes in materials. (c) Street construction test requirements. Test requirements for street construction shall be as follows: (1) Field densities. a. Subgrade. One field density per 150 lf per eight-inch lift. b. Curb and gutter. One field density per 125 lf or per placement. c. Sidewalk. One field density per 150 lf or per placement. d. Base course. One field density per 125 lf. e. Miscellaneous backfill. One field density per eight-inch lift or as directed by the chief engineer. (2) Gradations. a. Gradations shall include fractured faces, liquid limit and plasticity index. b. Base course. One per 300 lf or per project. Additional tests may be required by the chief engineer. (3) Modified proctors. As required by change in materials. (4) L.A. wear and soundness. One test per source per six months. (5) Special notes. a. Moisture limits on field density two percent. b. High volume change soils. Thirty-five percent or more of the material passing the No. 200 sieve shall be compacted to 90 percent of modified proctor. c. Compaction effort. Ninety-five percent for in situ soils. d. Types of material allowed for backfill shall meet the following specifications unless otherwise authorized by the public works director: 1. Backfill material shall be free of any organic or deleterious substances and shall not contain cobbles or lumps over four inches in greatest dimension. 2. Backfill materials shall contain not more than 60 percent by weight of material larger than a No. 4 sieve and in addition shall be uniformly graded with not more than 40 percent passing a No. 40 sieve nor more than 15 percent passing a No. 200 sieve. The material shall show low shrinkage or swelling and it shall be nonplastic. (d) Hot mix asphaltic concrete (HMAC). (1) One gradation, extraction and briquette and two field densities per block (350 lf) or as required by community development department personnel. (2) Establishment of a rolling pattern is recommended at time of job startup. (3) Testing of materials from hot bins and sand equivalence testing shall be accomplished at job startup in conformance with the city standard specifications for roadway construction or as outlined by the public works director. (e) Concrete. One slump test, set of cylinders (three minimum), and air content determination, if required, per 50 cubic yards placed or fraction thereof, per day. (f) Grout and mortar. Tests for mortar and grout used in construction of manholes, rockwalls, and rock retaining walls shall be as determined by the inspector. (g) Concrete paving. One slump test, one air content determination, one set of cylinders (three minimum per set) and one set of beams (three minimum per set), per 150 cubic yards placed or fraction thereof, per day.

(Ord. No. 949, § 3.3A, 9-8-87; Ord. No. 1224, § 1, 3-18-91; Ord. No. 1929, §§ I, II, 8-5-02)