§ 32-145 — Retaining wall design standards

Municipal Code of the City of Las Cruces, New Mexico (Supp. No. 34: codified through Ordinance No. 3114, adopted June 1, 2026) · Las Cruces Development Code § 32-145

Corpus is an independent public-information project, not the official City of Las Cruces website. Stable reference: corpuslaw.us/code/d06993a8-3a2f-4aa4-a587-83c70aae170c

Sec. 32-145. - Retaining wall design standards.

(Figure F in this section) An engineer shall design all retaining walls. 1. Retaining wall types include, but are not limited to, mechanically stabilized earth (MSE), gabion, reinforced concrete, reinforced earth, bin, anchored or tied-back, rock gravity, terraced, and nonstandard systems including, but not limited to, rock veneer wall modifications. 2. Retaining wall construction drawings. Developers, property owners, or builders shall submit detailed engineered construction drawings and specifications for each specific location at time of building permit application. As a minimum, the following information shall be included: • Construction drawings for all walls shall be on 24" x 36" sheets. • Specifications may be either on the drawing sheet or on separate 8½" x 11" sheets. • All geotechnical design reports and wall calculations shall be on separate 8½" x 11" sheets. • Typical cross-section/detail of the wall shall include finished soil elevations on both sides of wall and identify surcharges and their locations • All wall reinforcement locations and required concrete cover. • All material specifications. • Wall locations shall be identified on specific site grading plans to scale with survey information. • Construction plans shall note elevations of top-of-wall (TOW) at its ends, corners, and bottom-of-footings (BOF). • Construction plans shall show all adjacent structure(s), utilities, and property lines within 20 feet on each side of a wall or wall system. • Construction plans shall accurately show wall system(s) width and property line location(s) to scale. • Construction drawings shall show drainage system(s) and associated water collection system. • Additional requirements by the city. 3. Retaining wall designs: • Shall be for a 50-year (min.) safe service life. • Reinforcement requirements shall be designed by an engineer. • Retaining wall design loadings shall include sum of forces from retained soil, adjacent loads, passive forces, base friction, and wind loads. All wall designs require a minimum factor-of-safety of 1.5 against overturning, sliding, and foundation bearing from the summation of all applied forces. • Resultant force vector for the sum of all retaining wall loads shall be within the middle one-third of the foundation width and give a positive bearing stress under the foundation heal. • Retaining wall systems shall be wall segments individually designed. The global stability of the entire slope shall be checked for minimum safety factor of 1.5. • Retaining walls shall be designed to ultimate height as required for final site development. • Retaining wall designs shall use the city design values, section 32-138(D) in this document unless a site-specific geotechnical investigation and soils laboratory testing identifies alternative soil structural properties. The alternative values shall then be used. • Retaining wall exposed face batter shall be positive (into the wall) and have a 1:24 (H:V) (min.) slope after completion of all foundation yielding and back fill placement. • Retaining wall ends shall meet the following requirements: a. Must have a structural connection to another wall/structure, use wing walls, have slope reinforcement, or have a 3:1 (H:V) soil slope or less to insure fill containment. b. Temporary wall ends for fill containment may be designed for wall segments to be extended in the future. c. Fill containment design(s) shall be shown on the approved wall construction plans. 4. Future wall modification. If a retaining wall design includes a future modification: • The "retaining" part of the wall shall be designed and constructed to retain the ultimate lateral loads during the projects initial construction phase. Its foundation shall be sized to avoid exceeding the allowable soil bearing capacity, overturning, or sliding resistance by a safety factor of 1.5 (min.) due to the ultimate loads against the wall. • Changes to a retaining wall backfill (retained fill) after completion of its initial construction shall require investigative and design documentation signed and sealed by an engineer. • Wall structural modifications shall require a full review by the city community development department, technical and engineering services section prior to issuance of a new building permit. • All drawings and calculations for the modification shall be included with the initial building permit application. 5. Ground surface drainage. Ground surfaces adjacent to any wall shall be graded to prevent water infiltration into the wall foundation zone. Where this is not practical, one of the following shall be part of the final design by an engineer. • A drainage system(s) extending from the retained ground surface to the bottom-of-wall-foundation for the length of the wall. • The wall designed to withstand the additional hydraulic pressure of the saturated backfill. 6. Wall drainage system outlets shall drain into a designed collection area(s). 7. Retaining wall foundations shall extend through their retained fills or be founded on a structural fill constructed per engineer's design. 8. Retaining walls at the following locations shall be constructed to their ultimate dimensions during the projects initial development phase. This means any retaining wall: • Forming the border with adjacent public rights-of-way. • Reinforcing a slope with a history of instability. • That is part of a specific site/area drainage system. • Or wall system, retaining over two feet of soil. • A surcharge (vehicles, structure, or sloped backfill above level), within one wall height horizontal distance from the fill side wall face. • That is part of the site development of an essential structure. • That is determined by the city building official, development chief engineer or their designee to help reduce surface erosion from either wind or storm water prior to the subdivision's complete build-out. 9. Retaining wall backfill extending to twice the wall height horizontally from the wall shall comply with the following: • Shall be sand, noncohesive, and well-drained soil-rock mixture. • Compacted using any hand compaction equipment such as "vibratory plate compactor", "jumping jack" stomper/rammer, or small roller. Exercise caution to not move or break the wall. • Backfill soil shall have a maximum aggregate size of four inches. • Backfill and compaction testing shall be done according to the City of Las Cruces Standard Specifications for Road Construction, latest Edition. • Walls using a poorly drained soil backfill shall be designed to resist the additional hydraulic pressure and expansion from total backfill soil saturation. • Surface drainage (see section 32-145(5) in this Code). 10. Retaining wall drains: • Bottom row of drains extending through a retaining wall shall be located with their outlets within six inches (max.) above adjacent finished ground surface. • May extend through the retaining wall using a three-inch diameter (min.) PVC plastic pipe and graded to drain away from the retained fill. • Drain pipe inlets to be securely covered with geotextile (drainage) secured to the pipe. • Walls over eight feet high shall have two rows of drains (min.) with the second being three feet above the bottom row with locations staggered. • Horizontal spacing of drain pipes shall be ten feet (max.) with each row of outlet location staggered. • All drain water shall be drained to designated collection area(s). All drainage paths on adjacent property shall be located within a "maintenance easement." Drainage way maintenance shall remain responsibility of retaining wall owner. 11. In-ground ponds and swimming pools: • Shall be setback the larger of either ten feet or twice the height of the retaining wall (as measured from the top of its foundation to the top of the retained soil), from any retaining wall. • If pond/pool seepage could reach the wall foundation, then a drainage system to intercept the water shall be installed. This drainage zone shall extend from the ground surface to below the bottom-of-footing elevation and laterally the full length of the impoundment (min.) along the wall. • Drainage shall be into designated collection area or utility. 12. Landscaping in close proximity to a retaining wall shall be specifically considered in the structural analysis of the wall. Such planting zones may require specific independent drainage system(s) to prevent hydraulic pressure buildup against the retaining wall(s). Root barriers shall also be designed for areas of future root growth. 13. Engineer's certification. It is the intent of these standards to assure that the engineer of record is involved in both the design of the wall as well as the general oversight of construction of the wall. Therefore, the engineer or designee is asked to conduct site visits to assist with the assurance that construction appears to be meeting the requirements set and if changes are undertaken, they have been done so with their approval. To that end, the engineer shall submit a statement based on site visit(s) and observations stating that to the best of their knowledge and judgment the construction complies with the permitted plans. [image omitted; see the official code] [image omitted; see the official code] [image omitted; see the official code] REFERENCED STANDARDS This section lists the standards referenced within this document. All standards referenced in chapter 32, of the City of Las Cruces Municipal Code (LCMC) have been adopted by the city for use in the design and construction of projects within the city. Other standards that have previously been adopted within the current IBC, are listed in chapter 35 of that document. AASHTO (American Association of State Highway and Transportation Officials) T-96 | Standard Method of Test for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine T-104 | Standard Method of Test for Soundness of Aggregate by Use of Sodium Sulfate or Magnesium Sulfate T-106 | Standard Method of Test for Compressive Strength of Hydraulic Cement Mortar (Using 50-mm or 2-in. Cube Specimens) T-176 | Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test T-180 | Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18") Drop ACI (American Concrete Institute) 306R-88 | Cold Weather Concreting 318 | Building Code Requirements for Structural Concrete and Commentary ASCE (American Society of Civil Engineers) 7-10 | Minimum Design Loads for Buildings and Other Structures ASTM (American Society for Testing and Materials) C150/C150M | Standard Specification for Portland Cement C172-99 | Standard Practice for Sampling Freshly Mixed Concrete C270 | Standard Specification for Masonry Construction C270-12A | Standard Specification for Mortar for Unit Masonry C780 | Standard Test Method for Preconstruction and Construction Evaluation of Mortars for Plain and Reinforced Unit Masonry D1557 | Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft 3) (2,700 kN-m/m 3) D2419-09 | Standard Test Method for Sand Equivalent Value of Soils and Fine Aggregate IBC (International Building Code) Sec 1702 | Structural Observation LCMC (Las Cruces Municipal Code) Chapter 30 | Buildings and Building Regulations Article II, Division 2 | Building Permit and Inspection Process Secs. 30-170 thru 30-722 Article II, Division 3 | Types of Construction Not Requiring a Permit Sec. 30-301 Exempt Building Permits Chapter 32 | Design Standards Article V | Standards for Erosion Control Sec. 32-301 Soil Erosion Control Sec. 32-302 Wind Erosion Control Chapter 34 | Drainage and Flood Control Chapter 38 | Zoning Article VI | Special Provisions Sec. 38-60 Walls and Fences Sec. 38-62 Exceptions and Modifications Article VII | Nonconforming Uses, Structures and Property Secs. 38-70 thru 38-73 OSHA (Occupational Safety and Health Administration) Regulations 29 CFR, Part 1926 | Safety and Health Regulations for Construction, Subpart P—Excavations 1926.650 | Scope, application and definitions applicable to this subpart. 44 CFR | Emergency Management and Assistance

(Ord. No. 2804, §§ I, II(Exh. A), 2-6-17)