Sec. 37-300. - Construction drawing submittal requirements.

A. Subdivision requirements. 1. Application; 2. Submittal fee; 3. A final plat conforming to section 37-114 of this chapter; 4. Geotechnical soils investigation report. A complete geotechnical soils investigation and corresponding report may be required if the soil conditions are unknown, unreliable, or otherwise unusual. This requirement must be met when working in soils that are graded "expansive" or "very fine." Any geotechnical soils investigation must include, at a minimum, representative sampling and testing for: a. Soil classification (USCS); b. Sieve analysis; c. Structural design factors (R value and/or CBR value); d. Other parameters may be required, including but not limited to: i. Soil percolation tests (permeability); ii. Soil boring logs; iii. Water table elevations; 5. Pavement design. A complete pavement design may be required for collectors, arterials, industrial parks/developments, or other areas subject to unusual traffic loadings. This requirement must be met whenever the soil to be worked in has been graded as "expansive" or "very fine." Pavement designs must include, at a minimum: a. Depth and type of subgrade preparation; b. Depth and type of base course needed; c. Depth and type of asphalt pavement needed: Note—Asphalt mix formula to be required from contractors. 6. Final drainage study. The final drainage study shall be a detailed report and analysis of the drainage in the proposed development. It shall include detailed calculations for all potential runoff within the proposed development, and detailed calculations supporting the design of all drainage structures within the development. Construction plans for all drainage structures, and grading plans for all street grades where applicable, shall also be considered as part of the final drainage study. Drawings and calculations comprising the final drainage study shall include, but not be limited to, the following information: a. Existing and proposed contours for proposed development. (Contour interval based on N.G.S. Datum—two-foot contour interval minimum.) Proposed development with relatively flat surfaces (e.g., river valley subdivisions) shall contain spot elevations or one-foot contour intervals. b. Location(s) and elevation(s) of city or U.S.G.S benchmark(s). All elevations shall be based on N.G.S. Datum. c. Property lines. d. Streets, R.O.W. limits, names and grades. e. Existing drainage facilities and structures, including existing irrigation ditches, roadside ditches, drainage ways, gutter flow directions, and culverts. All pertinent information such as size, slope, elevations and locations of existing drainage ways shall be included in order to facilitate review and approval of drainage plans. f. Overall drainage area boundaries and drainage sub-area boundaries. g. Proposed types of curbs and gutters and gutter flow directions, including crosspans (intersections). h. Proposed storm drains, open drainage ways and right-of-way requirements, including proposed inlets, manholes, culverts, erosion control and energy dissipation devices, and any other appurtenances necessary for drainage control. i. Proposed inflow and outfall point(s) for runoff from the study area. j. Routing and accumulative flows at various critical points for the initial (ten-year) and major (100-year) storm runoff. k. Minimum finished-floor elevation and ground-site elevations at all critical building locations for protection from major storm runoff. l. A 1-inch = 100-foot (preferable) scale map of the proposed development that shows the following information: i. Locations and sizes of all drainage structures; ii. General flow patterns within the development; iii. Minimum finished-floor or building-pad elevation of each building site; iv. 100-year flood level in all streets in which the curb would be overtopped during the 100-year storm; v. All drainage basins within the development (Note: The number of basins should be limited to the smallest practical number.) m. All floodplains and floodways within the proposed development. A copy of the current F.E.M.A. Floodplain Map is required showing project limits. n. All drawings on 24-inch × 36-inch sheets. o. Plan details. The following details shall be indicated on the drainage plans. i. Title block (lower right-hand corner preferred); ii. Scale; iii. Date and revisions; iv. Name and address of professional engineer (and firm); v. Professional engineer's seal; vi. Drawing number (sheet n/n); vii. Legend; viii. Approval block for appropriate reviewing departments and agencies; p. Construction drawings. Construction drawings shall be prepared by a registered professional engineer licensed in the state. All drawings shall be on 24-inch × 36-inch sheets and shall show the following information: Plan. • North arrow; • Property lines; • Street names and easements (with locations and width dimensions); • Existing utility lines, locations and depths (or heights): º Water; º Gas; º Storm drains; º Irrigation canals; º Sanitary sewers; º All existing and proposed public and private utilities. Profile. • Vertical and horizontal grids with scales identified; • Ground surface grade (dashed line) and proposed grade (solid line); • Existing utility lines where crossed; • Benchmarks (N.G.S. Datum); Proposed construction. • Pipes and culverts. º Plan showing stationing; º Profile showing elevations at even stationing (at 50-foot intervals) º Size and length pipe, pipe composition (if applicable) and distances between manholes; º Slope of pipe; º Inlet and outlet details of all manholes and inlets, and connections to existing drainage systems (if applicable); º Manhole details, including station numbers, and invert and top elevations; º Typical bedding details for pipe for all bedding situations encountered on project; • Open channels: º Plan showing stationing; º Profile indicating elevations of invert of channel, top of lining (if any), and adjacent ground grade; º Profile showing elevations at even stationing (at 50-foot intervals); º Typical cross sections; º Construction notes; º Lining details; º Rip-rap and bedding details, with graduation requirements for same; º Details of all inflow and outflow structures and drop structures (includes subgrade and foundation design details); • Technical specifications. Technical specifications shall be included on any drainage project permitted for construction within the city. Specifications shall meet the minimum guidelines for construction as outlined in the city standard specifications for roadway construction and design standards as amended. Additional specifications for construction shall be included, to the point at which there exists a clear understanding of the nature and quality of work to be performed on the project. Additional technical specifications for projects that will become city property or that will be involved in the city storm drainage maintenance program, may be required. q. Street plan and profiles. The plan and profiles shall be prepared on 24-inch x 36-inch sheets by a registered professional engineer, licensed in the state. The scale of all plans and profiles shall be 1:5 vertical, 1:50 horizontal unless a grid break would result. In such cases, the scale may be 1:10 vertical, 1:100 horizontal. A grid shall be required in all cases. Plan. The following information shall be indicated on the plans: • Title block (lower right-hand corner preferred); • Horizontal/vertical scale; • Date and revisions; • Name of professional engineer (and firm); • Professional engineer's seal; • Drawing number (sheet n/n); • Legend; • Construction approval block for appropriate reviewing departments and agencies; • Street name; • North arrow; • Match lines with stationing and "see sheets" called out; • Limits of construction; • Centerline stationing; • Stations at street intersections, curb returns and property lines; • Sizes and locations of all utilities (existing and proposed) (stub-outs not required); • Rights-of-way widths; • Adjacent block and lot numbers; • Fire hydrant locations; • Water and gas lines and valve locations; • Sidewalk and wheelchair ramp locations; • Curve centerline data; • Stationing and locations or crown transition; • Back-of-curb radius (P.C., P.T. and midpoint stations), or sidewalk if no curbing is required, if applicable; • Curb/gutter locations, if applicable; • Top-of-curb elevations, or of sidewalk if no curbing is required, and stations at each front lot corner; • Drainage flow arrows at crosspans and nontypical intersections; • Driveway locations and stations (if applicable); • Proposed top-of-pavement spot elevations at and across from all intersections (at flowline extensions); • A local benchmark based on N.G.S. datum, with description, location and elevation; • Manhole locations; • "No parking" sign locations (if applicable) Profiles. The following information shall be indicated on the profiles: • Proposed and existing grades 100 feet beyond limits of construction; • Even stationing (at 50-foot intervals) and elevations on all profiles of top-of-curb, right and left, street centerline required if in a nontypical section; • Stationing and elevation of the vertical point of intersection on all vertical curves, including, PVT, PVI, PVC, and K value; • Top-of-curb elevations (or top-of-sidewalk elevations if no curbing is required at each lot corner); • Sanitary and storm sewer pipe invert elevations; • Slopes of sewer lines; • Stationing of manholes; • Pipeline locations, sizes and depths noted; • Limits of construction; • Grid at scale of 1:5 Vertical and 1:50 horizontal; scale can be 1:10 vertical and 1:100 horizontal if size will require a page break; r. Grading plans. The plans shall be prepared by a registered professional engineer licensed in the state. The following information shall be required: • Street names; • Block and lot numbers; • North arrow; • Written and graphic scales; • Existing contours based on project "as-builts," not plans, at 2-foot intervals (100 feet beyond project boundary if adjacent land is undeveloped and the property line of the adjacent land is developed). Proposed development with relatively flat surfaces (e.g., river valley subdivisions) shall provide spot elevations, or one-foot contour intervals; • Retaining wall locations (and note if walls will be built at time of roadway construction) (See city design standards, chapter 32, LCMC); • Top-of-curb elevations, or sidewalk if no curbing is required at each lot corner • Pad elevations or finished floor elevations (for each lot); • Spot elevations (minimum of six per lot showing high points and low points) or a typical lot detail if the proposed development has a relatively flat surface (e.g., river valley subdivision); • Pond elevations: Top, bottom and dimension from property lines (if applicable); • Barrow ditch elevations (if applicable); • Drainage channel elevations (if applicable); • Drainage flow arrows (and note if roof area will drain to ponding area); • Retention/detention, basin, location and elevation; • A project benchmark based on N.G.S. datum with description, location and elevation. • Note: All grading, including lot grading, shall be done at time of roadway construction and to be maintained by subdivider. • General notes for grading and construction, etc.; • Off-site grading or slope grading limits (if applicable); • All grading must comply with chapter 70 of the Uniform Building Code or an approved alternative. Alternative design may only be approved by the public works director. If grading will be performed on the land of an adjacent property owner(s), or construction vehicles may need to access the property, a copy of a letter must be provided to the city, signed by the adjacent property owner(s), stating that they understand the nature of the work and do not oppose the modification to their property and/or that they will allow temporary access to their property by the contractor; • Show existing utilities. s. Utility master plan. The Utility master plan shall include all phases of development and be prepared by a registered professional engineer, licensed in the state. The following information shall be required: If utilities are not in the standard location, i.e., street right-of-way, then preapproval is required by the utilities department. • Utilities for existing development: Size and type of pipe (existing and proposed), including underground electrical, telephone, cable TV, etc.; • Lot and block numbers; • Street names; • North arrow, written and graphic scale: Scale shall be no greater than 1-inch = 60-feet; • Utility stubouts; • Street light pad and conduit locations; • Wire utility boxes; • Fire hydrant locations; • Water and gas valve locations; • A local benchmark based on N.G.S. datum, with description, location and elevation; • Manhole locations. t. Detail sheet, to be prepared by a registered professional engineer licensed in the state. The following information shall be required, if applicable: • Roadway construction notes and general notes; • Utility construction notes; • Manhole details; • Typical utility stubout to lot detail; • Street intersection detail (if applicable); • Typical street cross-section(s) (including paving composition); • Curb and gutter detail; • Wheelchair ramp detail; • Retaining wall detail, cut-off wall detail and all fencing details (if applicable); • Drainage structure details; • Light base details; • Typical lot layout; • Any other construction detail which may be needed for clarification purposes; • Water and gas valve and line detail. B. The subdivider of any approved subdivision shall be responsible for completing roads, drainage and utility improvements necessary for filing the final plat. Construction improvements shall include 100 percent coverage of all road, drainage and utility improvements within the subdivision and 50 percent coverage of roads adjacent to the subdivision. The subdivider shall be responsible for any necessary off-site utility extensions required to provide service, unless such extensions are already part of the utility capital improvement program.

(Ord. No. 2686, § I(Exh. A), 8-5-13)