§ 38-49 — PUD—Planned Unit Development
Municipal Code of the City of Las Cruces, New Mexico (Supp. No. 34: codified through Ordinance No. 3114, adopted June 1, 2026) · Las Cruces Development Code § 38-49
Corpus is an independent public-information project, not the official City of Las Cruces website. Stable reference: corpuslaw.us/code/4322394e-87d6-4fa2-8d28-a29f166b9f06
Sec. 38-49. - PUD—Planned Unit Development.
A. Purposes. The purposes of planned unit developments (PUD) are to: (1) Comply with Growth Management Policy as established in the Land Use Element, other applicable elements and all companion documents to the Comprehensive Plan. (2) Produce more flexibility in development than would result from a strict application of this Code. (3) Permit design flexibility that will encourage a more creative approach to the development of land and that will result in more efficient and aesthetically desirable alternatives to the housing and other development needs of the community. (4) Permit flexibility in land use, density, placement of buildings, arrangement of open space, circulation facilities, and off-street parking areas, and maximize the potential of individual sites under development. (5) Promote the infill of vacant land. (6) Create developments that balance the benefits to the community with the developer's interests. B. General Provisions. (1) The PUD process shall be required for those proposed developments that are to be subdivided and multi-phased and that request three or more deviations to planning-related minimum development standards, e.g., setbacks. An applicant whose proposed development is not required to follow the PUD process may request to use the PUD process. (2) The Infill Development Process (IDP) described in Section 38-48 authorizes the Planning and Zoning Commission to take final action on PUD's. However, proposed development in Infill Areas is not required to use the PUD process, but may use the Infill Development Process. (3) Proposed deviations to engineering standards, e.g., street construction standards, will be acted on by the Public Works Department Director or designee with appeal to the Engineering Review Committee. However, the PUD process shall not be used if only deviations to engineering standards are proposed. (4) A developer shall not be granted a deviation to planning-related minimum standards (private incentive) without providing a public benefit to the City/community. The Land Use Element of the City's Comprehensive Plan provides guidance in determining appropriate public benefits in relation to private incentives. One or more public benefits are to be provided for each private incentive. For example, the private incentive request to reduce the amount of open space below the standard shall result in an equivalent amount of recreation equipment being provided or a combination of benefits that relate to the private incentive requested. (5) A PUD may be used to correct any legal nonconforming situation. However, a PUD shall not be used to make an illegal situation legal. (6) All contiguous property owned or legally controlled by the developer shall be included within the PUD. C. Specific Provisions. A Planned Unit Development shall meet minimum development standards. The existing development standards, e.g., Zoning Code requirements, shall be met, or minimum development standards, as proposed by the applicant, and approved as part of the PUD, shall be met. The applicant shall clearly describe the PUD in terms of all of the following specific provisions. In addition, the Community Development Director or designee may recommend conditions and the Planning and Zoning Commission or the City Council may impose conditions and require compliance with such other standards as deemed necessary. (1) Land Use. A PUD may contain any land use or combination of land uses. (2) Location. A PUD may be located anywhere within the City except within the University Avenue Corridor Plan Overlay Zone District. However, the PUD process shall not be used to circumvent the requirements of any overlay zoning district. (3) Size. There is no acreage minimum or maximum. (4) Density. There is no minimum or maximum number of dwelling units per acre. (5) Intensity. There is no minimum or maximum square footage requirement for nonresidential uses. (6) Off-Site Roadway and Intersection Improvements. Contributions to or the provision of off-site roadway and intersection improvements shall be required based on the proportionate share of the PUD's impact on off-site roadway segments and intersections. Off-site roadway and intersection improvements necessary in whole or in part because of the PUD's impacts shall be provided according to the improvements schedule outlined in the required traffic impact analysis called for in the Transportation Element of the Comprehensive Plan (Policy 1.5 of Goal 7, Growth Management, of the Transportation Element of the Comprehensive Plan). Furthermore, improvements shall be consistent with Growth Management policy of the Land Use Element. (7) Architecture. PUD architecture shall be compatible with and enhance the existing architecture on adjacent property. (8) Design. The City may alter the design of the proposed PUD to insure the public health, safety and welfare. (9) Context. The City may alter the proposed PUD to insure compatibility with existing and potential land uses adjacent to the proposed PUD. (10) Antennas, Towers, Communication Structures, and Other Vertical Structures. See Section 38-59. (11) Height. See Subsection 38-3I.D and Section 38-32.D. (12) Landscaping. See Chapter 32 of the Municipal Code. (13) Mobile Home Parks/Recreational Vehicle Parks. See Section 38-57. (14) Open Space. See Chapter 32 of the Municipal Code. (15) Off-Street Parking. See Section 38-58. (16) Roadway Access. See Chapter 26, Article III, Access and Median Cuts. The proposed PUD shall be accessed by at least one paved roadway (meeting the City of Las Cruces Standard Specifications for Road Construction) within the minimum right-of-way for the roadway width having the capacity necessary to serve the first phase of the PUD. Additional access may be required before other phases of the PUD are allowed to proceed. (17) Setbacks/Buffervards/Screens. (See Matrix 1 at the end of this section.) (18) Signage. See Chapter 36 of the Municipal Code. (19) Walls and Fences. See Section 38-60. (20) Accessory Uses and Structures. See Section 38-51. (21) Private Incentives/Public Benefits. For each private incentive (deviation to existing Municipal Code planning-related minimum standards listed above) requested, one or more public benefits shall be provided. For example, a private incentive request to reduce the amount of open space below the standard shall result in an equivalent amount of recreation equipment being provided or a combination of benefits that relate to the private incentive requested. D. Review Procedures. (a) Authorization. A Planned Unit Development (PUD) is a zoning district change and is not permitted by right in any zoning district. The procedures and requirements in this Article shall govern the development of a PUD. For each PUD, there shall be a Pre-Application Conference, Concept Plan, one or more Final Site Plans and, if required, one or more Final Plats. The following table summarizes actions to be taken on a PUD: Staff | P and Z | City Council Pre-App. Conf. | R Concept plan | R | R (FA*) | FA (A*) Final Site Plan | R | FA (R**) | A (FA**) Final Plat*** | FA | A | A Recommendation (R), Final Action (FA), and Appeal (A). * The Planning and Zoning Commission is authorized to take final action using the Infill Development Process within Infill Areas. ** The City Council shall take final action on final site plans when one or more is submitted along with the Concept Plan. *** A Final Plat may not be required in every case. (b) Pre-Application Conference. Any proposed PUD shall first be reviewed at a pre-application meeting scheduled and held by the Community Development staff. The pre-application process shall be subject to the provisions provided for in Subsection 38-10.C. This meeting does not require a written application or fee. The results of this meeting shall not obligate the Planning and Zoning Commission or City Council. (c) Concept Plan Review. (1) Concept Plan Application. The Concept Plan is similar to, and replaces, a subdivision master plan in that it is intended to serve as a tool that can assist in identifying the appropriateness of a proposed development within the context of its surroundings. The Concept Plan forms the basis for approval of the PUD. The Concept Plan and supplemental material shall be submitted to the Community Development Department no later than 60 calendar days prior to the date of the regular meeting of the Planning and Zoning Commission. The staff shall review the submittal for completeness. If all the required items have been submitted as per Subsection 38-49.E, the Community Development Department shall issue a receipt for submittal. A Concept Plan and supplemental material shall not be accepted for review if incomplete. All items required on a Concept Plan must be present for acceptance unless accompanied by a written request justifying the deletion of required information. The Community Development Director or designee may waive any submittal requirement. However, after reviewing the Concept Plan, the Community Development Director or designee, the Planning and Zoning Commission and/or the City Council may require additional items and resulting information in addition to the submittal requirements as per Subsection 38-49.E. Additional items and/or information requested by staff may include, but not be limited to, the need for early notification to a neighborhood group(s) and/or defined noticed area. Additional requests by staff shall be justified in writing. A written staff report with recommendations shall be provided to the Planning and Zoning Commission along with the Concept Plan. The report shall recommend that the Concept Plan be approved, conditionally approved, disapproved, or postponed. (2) Concept Plan Public Hearing(s). Public hearing and notice requirements shall be in accord with provisions of Section 38-10. The applicant or applicant's representative shall be present at the public hearing for the proposal to be considered. If the applicant or representative is not at the public hearing, the Concept Plan shall be postponed until the next regular Planning and Zoning Commission meeting or City Council meeting. The Planning and Zoning Commission shall review the Concept Plan, staff report, applicant presentation, and information submitted by interested citizens. Action by the Planning and Zoning Commission shall be a recommendation to the City Council for approval, conditional approval, or disapproval. The Planning and Zoning Commission is authorized to take final action on a PUD using the Infill Development Process within Infill Areas. An Official Notification of Decision that describes the decision of the Planning and Zoning Commission and/or City Council shall be furnished to the applicant in compliance with State law. The Concept Plan may be approved only if it includes the following findings: a. The proposed construction and use of the PUD will not be detrimental to the health, safety or welfare of the community or adjacent neighborhood; b. There is or will be adequate sewage capacity, roadway capacity, energy supply, and potable water supply to serve the PUD at the time a certificate of occupancy or letter of acceptance, as applicable, is to be issued; c. The PUD conforms to the intent, goals, objectives, policies, and standards of all City plans and codes; d. The uses proposed, including their density and intensity, are appropriate to the character of the neighborhood and will have a positive aesthetic effect on the neighborhood in which the PUD will be located; and e. The proposed uses will not subject surrounding properties and pedestrians to significant hazardous traffic conditions. Final approval may be granted subject to compliance with such conditions required by the Planning and Zoning Commission and/or the City Council. The conditions that the Planning and Zoning Commission and/or City Council find necessary shall be made part of the terms under which the PUD is granted. The Planning and Zoning Commission and/or the City Council may require such conditions to be included as covenants or deed restrictions in any subsequent conveyances of PUD property. Such covenants and deed restrictions shall be properly recorded with the Dona Ana County Clerk. Furthermore, the Planning and Zoning Commission and/or City Council may require that all or part of any utility corridor, roadway, walkway, bike facility, park, playground, or other public area shown on the Concept Plan be dedicated for public use as an easement, right-of-way, or other conveyance. If the Concept Plan is approved or conditionally approved by the Planning and Zoning Commission and/or the City Council, the PUD shall be shown on the Official Zoning District Map as PUD replacing the existing zoning districts. (3) Concept Plan Effective Period. The approval of the Concept Plan shall be effective for a period of five years. If a Final Site Plan for all or part of the area has not been approved by the Planning and Zoning Commission and/or City Council by the expiration of the five-year period, the Concept Plan approval shall expire. The zoning of the property shall automatically revert to the underlying zoning districts that existed for the property at the time the Concept Plan was approved. Prior to the expiration date, the staff may approve a request for an extension of time of up to two years. After the first time extension, the Planning and Zoning Commission and/or City Council shall consider any other time extension request. When at least one Final Site Plan has been approved, the Concept Plan shall remain effective until amended. (4) Concept Plan Amendment. Any substantial change proposed that would affect the approved Concept Plan shall require re-submittal of the Concept Plan in its entirety. Minor changes are those changes that are not substantial and may be approved by the staff; however, staff may determine that any proposed change should be reviewed by the Planning and Zoning Commission and City Council. Substantial changes to the Concept Plan are subject to the same requirements as the original application. Substantial changes shall include but are not limited to: a. Any change that would increase the intensity of the land uses; b. Fifteen percent cumulative increase in vehicular traffic to any roadway segment or intersection; c. Fifteen percent cumulative increase in residential density; d. Fifteen percent cumulative increase in nonresidential square footage; e. Any change in private incentives and public benefits; f. Increase in size of property; g. Any reduction in screening, bufferyards and setbacks at the PUD property line; h. Fifteen percent cumulative increase in the buildable area for structures including signs; and i. Fifteen percent cumulative reduction in open space. (d) Final Site Plan Review. (1) Final Site Plan Application, Public Hearing and Effective Period. A Final Site Plan shall substitute for a subdivision preliminary plat when an applicant must otherwise comply with the subdivision requirements. Upon approval of the Concept Plan, the applicant may submit a Final Site Plan for part or all of the land area covered by a Concept Plan for Planning and Zoning Commission consideration. However, an applicant may submit a Final Site Plan along with the Concept Plan. One or more final site plans submitted with the Concept Plan shall be submitted along with the Concept Plan to the City Council for final consideration. Subsequent final site plans shall be submitted to the City Council for final consideration. The Final Site Plan and supplemental material shall be submitted to the Community Development Department no later than 60 calendar days prior to the date of the regular meeting of the Planning and Zoning Commission. The staff shall review the submittal for completeness. If all the required items have been submitted as per Subsection 38-49.E., the Community Development Department shall issue a receipt for submittal. A Final Site Plan and supplemental material shall not be accepted for review if incomplete. All items required on a Final Site Plan must be present for acceptance unless accompanied by a written request justifying the deletion of required information. The staff may waive any submittal requirement. However, after reviewing the Final Site Plan, the Planning and Zoning Commission and/or the City Council may require additional items and resulting information in addition to the submittal requirements as per Subsection 38-49.E. Additional items and/or information requested by staff may include, but not be limited to, the need for early notification to a neighborhood group(s) and/or defined noticed area. Additional requests shall be justified in writing. A written staff report with recommendations about the Final Site Plan shall be provided to the Planning and Zoning Commission along with the Final Site Plan. The report shall recommend that the Final Site Plan be approved, conditionally approved, disapproved, or postponed. The review procedures for the Final Site Plan shall be the same as for the Concept Plan except that: a. The Planning and Zoning Commission shall take final action instead of the City Council unless a Final Site Plan has been submitted along with the Concept Plan. One or more final site plans submitted with the Concept Plan shall be submitted along with the Concept Plan to the City Council for final consideration. Subsequent final site plans shall be submitted to the City Council for final consideration. b. No findings are required except that the Final Site Plan conforms to the Concept Plan. c. A Final Site Plan shall be effective for two years from the date of approval. When at least one Final Plat or at least one Building Permit has been approved, the Final Site Plan shall be effective until amended. Approval of a Final Site Plan shall not constitute approval of a Final Plat when a Final Plat is required. Such approval shall constitute the permission to prepare and submit a Final Plat for part or all of the land area covered by the Final Site Plan and construction drawings of all improvements for the Final Site Plan land area. Final platting shall not be considered until a Final Site Plan is approved. If a Final Plat is not required, an approved Final Site Plan shall allow for a building permit to be issued that is in compliance with Chapter 30, Buildings and Building Regulations. Notation on documents shall clearly indicate that the project receiving the building permit is part of a PUD and is subject to the approved Concept Plan and approved Final Site Plan. In granting approval of a Final Site Plan, the Planning and Zoning Commission shall require adequate guarantees of compliance with all conditions of approval. Such guarantees may include, but are not limited to, performance bonds, lien agreements, or escrow deposits in an amount sufficient to ensure compliance. Moreover, the construction of a PUD following approval of a Final Site Plan shall be in accordance with the Concept Plan and Final Site Plan conditions. Failure to comply with such conditions and standards shall be deemed a violation of this Code. (2) Final Site Plan Amendment. Any substantial change proposed that would affect the approved Final Site Plan shall require resubmittal of the Final Site Plan in its entirety. Minor changes are those changes that are not substantial and may be approved by the staff; however, staff may determine that any proposed change should be reviewed by the Planning and Zoning Commission and City Council. Substantial changes are subject to the same requirements as the original application. Substantial changes shall include but are not limited to: a. Increased drainage impact; b. Change in location and size of utilities and easements; c. Change in required, specific landscape features such as buffers, screens and setbacks at the PUD property line; d. Change in proposed roadways above major local class; e. Change in structure location, including signs, by more than five feet; and f. Change in architectural style or character. (e) Final Plat Review and Contents. If required, the Final Plat(s) review procedures and contents shall comply with Article IV of Chapter 37, the City's Subdivision Code. E. Submittal Requirements. (a) Concept Plan Submittal Requirements. A request for review of a Concept Plan shall include the following information: (1) Official Application and Development Statement; (2) Submittal Fee; (3) Waiver request and justification to delete submittal information, if applicable; (4) Descriptions of deviations to planning-related development standards and the public benefits to be provided; (5) Association by-laws (may be submitted with each Final Site Plan.); (6) Concept Plan. The following information shall be provided on the Concept Plan and supporting maps and drawings: a. Name of Concept Plan. b. Name, address and telephone number(s) of property owner(s), developer(s) and consultant(s) preparing the Concept Plan. c. Detailed area map showing the surrounding area within a half mile and the PUD in relationship to adjacent parcels, existing roadways, and natural or manmade features that may impact or be impacted by the PUD. d. North arrow, date of preparation, and written and graphic scale. e. Legal description. f. Boundary lines of Concept Plan area with approximate length of lines and boundary lines of phases. g. For each lot, parcel, or tract, list proposed land uses and acreage and show building area boundaries within which each structure will be located: 1. Maximum number of dwelling units and maximum density. 2. Maximum square footage of nonresidential uses. h. Proposed screening and bufferyard/setback distances along the PUD property line. i. Existing land uses and zoning on adjacent lots, parcels, or tracts. j. Name of adjacent subdivisions (including the filing date, book and page numbers), property owners, and zoning. If not subdivided, name of property owner. k. Twenty-foot contour intervals minimum or as appropriate. l. Proposed alignment of roadways and how they relate to the Metropolitan Planning Organization (MPO) Transportation Plan and the Transportation Element of the Comprehensive Plan and the impacts created on the area road network, neighborhood, and other land uses. Impact data shall include the anticipated traffic volume generated by the proposed development, identification of the affected road network, and the additional traffic volumes associated for each road. If required, provide a Traffic Impact Study, including a roadway improvement schedule, consistent with the requirements of the Transportation Element of the Comprehensive Plan (Policy 1.5 of Goal 7, Growth Management, of the Transportation Element) and based on the latest recommendations from the Institute of Traffic Engineers. Thoroughfare System: Identification of adjacent roadways and other transportation lines by functional classification; proposed location, length, width of all roadways, bikeways, trails, walkways, and any other transportation lines. Identify existing and proposed classification of roadways as per City of Las Cruces Design Standards and based on the current Las Cruces MPO Transportation Plan and the Transportation Element of the Comprehensive Plan. m. Location and sizes of existing and proposed utilities. n. Significant natural features, such as arroyos and 100-year floodplains. o. All easements. p. Tabular Information: 1. Land uses of each lot, parcel, or tract. 2. Total acreage of the PUD, acreage for each land use, and acreage of each land use by phase. 3. Maximum number of dwelling units and maximum density by phase. 4. Total square footage of nonresidential uses by phase. 5. Total acreage for open space, private and public facilities, and right-of-way. 6. Maximum height of proposed structures for each lot, parcel or tract. q. Approval block signifying the final approved Concept Plan to be signed by the Zoning Administrator upon approval by the City Council and resolution of all outstanding staff comments. (7) Other Impact Studies, if required by the Planning and Zoning Commission, are to be submitted prior to City Council consideration: a. Impacts on any public facilities outside the PUD area. Impact data shall include expected population generated by the proposed development, identification of public facilities, e.g., utilities, parks, that are anticipated for use by said population and level of capacity of said utilized public facilities. b. Impacts on air quality, specifically solid particulates known as PM10. (Small airborne particulates, particulate matter less than or equal to ten microns in diameter, are an important health concern because they are far more likely than larger particles to be inhaled deep into the lungs. This particulate matter is a respiratory irritant, can aggravate asthma and other lung diseases, and act as a medium of transport that allows the body to absorb heavy metals through oxidation. These small, suspended particulates also play some role in obscuring light, thus degrading visibility.) Impact data shall include identification of proposed uses that generate air pollution substances into the environment and the projected impact. c. Impacts on views and noise to adjacent property. Impact data shall include identification of proposed uses that generate excessive noise, anticipated maximum height for proposed structures, identification of existing physical features that are viewed from the PUD and adjacent properties, and how these views will be altered by the PUD. Proposals to mitigate impacts shall be provided. d. Geological and Soils Hazards. Report on the Geologic and Soils Hazards in relation to slope conditions, drainage problems and suitability for septic system use, if applicable, as identified by the Soil Survey of Dona Ana County Area, New Mexico. This report shall also include either an aerial photograph or a map with existing contours at an appropriate interval to establish accurate ground contour of the PUD area. (8) Copy of early notification letter to neighborhood group(s) and/or defined noticed area and copy of minutes (summary or verbatim) from any required meeting pursuant to Subsection 38-10.C.1.(d)(v). (b) Final Site Plan Submittal Requirements. A request for review of a Final Site Plan (FSP) shall include the following information: (1) Official Application and Development Statement. (2) Submittal Fee. (3) Waiver request and justification to delete submittal information if applicable. (4) Master Drainage Study consistent with Section 37-81 of the Subdivision Code and Article III, Drainage, of the City Design Standards. (5) Master Utilities Report and Plan consistent with Section 37-81 of the Subdivision Code. (6) A Final Site Plan. A FSP shall be at a scale that adequately represents the required information. A FSP shall be prepared on 18" × 24" sheets of paper. Copies shall be legible with no limit to the number of sheets provided. A FSP and supporting maps and drawings shall show existing conditions and all proposals, including the following: a. Name of the FSP. b. Total acreage of the FSP area to the nearest 1/10 of an acre. c. Date of preparation, north arrow, written and graphic scale. d. Vicinity Map to locate the FSP within the Concept Plan area. The Vicinity Map shall show relationship to existing major roadways. e. Name and address of applicant. f. Name and address of the person, corporation, or organization preparing the FSP. g. Number to identify each lot. Letter of the alphabet to identify each tract or parcel. h. Proposed lot lines and right-of-way lines; rights-of-way and street widths; rights-of-way and easement widths for public services or utilities and any limitations thereof. i. Dimensions, acreage, and purposes of tracts or parcels. j. Sites and acreage for any multi-family dwellings or nonresidential uses. k. Dimension of all buildings, setbacks, bufferyards, parking, walkways, lighting, signs, landscaping, walls, fences, open space, and recreation areas. l. Architectural elevation drawings of all buildings, signs, and other structures. m. On separate sheets, if necessary, include existing conditions of the proposed FSP area. If applicable, include the following: 1. FSP name. 2. Location, width, and purpose of all easements on site. 3. Public rights-of-way on and within 150 feet of the site: name, width, and classification. 4. Utilities on and adjacent to the site: Location and size of water wells, water reservoirs, water lines, sanitary and storm drains, and drainage facilities; location of all irrigation channels and drains; location of gas lines, fire hydrants, electric and telephone poles, and street lights. If water mains and sewers are not on or adjacent to the tract, indicate the direction, distance, and size of nearest lines. 5. Existing topography guidelines: i. For land with average slope of less than five percent, show contour lines at intervals of not more than two feet. ii. For land with average slope of more than five percent, show contour lines at intervals of not more than five feet. 6. Conditions on adjacent land significantly affecting design of the FSP: direction and gradients of ground slope, character and location of development, access points from adjacent points, and building types. n. Approval block signifying the Final Site Plan approved to be signed by the Zoning Administrator upon approval by the Planning and Zoning Commission and resolution of all outstanding staff comments. (7) Copy of early notification letter to neighborhood group(s) and/or defined noticed area and copy of minutes (summary or verbatim) from any required meeting pursuant to Subsection 38-10.C.1.(d)(v). F. Existing Planned Unit Developments. A PUD existing on the effective date of this Code may continue to develop based on the approved PUD conceptual plan and final site plan. However, a proposed substantial change as defined in this Division shall require that an existing PUD comply with all the requirements of this Code. Sec. 38-49. Buffer Matrix 1 (Separation and Landscaping Requirements between Land Use/Zones): Listed here are separation and landscaping requirements that all forms of development are required to follow when a proposed use is located next to differing adjacent land uses/zones. Other separations distances and landscaping screens may be followed other than what is listed here with the approval of the planning director or designee. Adjacent Use Proposed Use | EE, RE, REM VLD. Res. | R-1c, R-1cM LD Res. | R-1a, R-1aM, R-1b, R-1bM, R-2, R-3 MD Res. | R-4 (Density to be established) HD Res. | O-1 Neigh. Office | O-2 Pro Office | C-1 Low Inten. Comm. | C-2 Med. Inten Comm. | C-3 Reg. Comm. | MT Indust. Tech | M-1/M-2 Indust. Standard | M-3 Indust. Heavy VLD Res. EE, RE, REM | R | R | R | R | R | R | R | SB 25' | SB 25' | SB 25' | SB 25' | SB 30' LD Res. R-1c, R-1cM | R | R | R | R | R | R | R | SB 25' | SB 25' | SB 25' | SB 25' | SB 30' MD Res. R-1a, R-1aM, R-1b, R-1bM, R-2, R-3 | R | R | R | R | R | R | R | SB 25' | SB 25' | SB 25' | SB 25' | SB 30' HD Res. R-4 (Density to be established by City) | BY 10' B/BY 5' A | BY 10' B/BY 5' A | BY 10' B/BY 5' A | R | R | R | R | R | R | SB 25' | SB 20' | SB 30' Neigh. Office O-1 | BY 10' B/BY 5' A | BY 10' B/BY 5' A | BY 10' B/BY 5' A | R | R | R | R | R | R | R | R | R Pro. Office O-2 | BY 15' B/BY 10' A | BY 15' B/BY 10' A | BY 15' B/BY 10' A | R | R | R | R | R | R | R | R | R Low Inten. Comm. C-1 | BY 15' B/BY 10' A | BY 15' B/BY 10' A | BY 15' B/BY 10' A | R | R | R | R | R | R | R | R | R Med. Inten. Comm. C-2 | BY 15' B/BY 10' A | BY 15' B/BY 10' A | BY 15' B/BY 10' A | BY 10' B/BY 5' A | R | R | R | R | R | R | R | R High Inten. Comm. C-3 | BY 15' B/BY 10' A | BY 15' B/BY 10' A | BY 15' B/BY 10' A | BY 10' B/BY 5' A | R | R | R | R | R | R | R | R Indust. Standard M-1/M-2 | BY 60'C/BY 40' B/BY 20' A | BY 60' C/BY 40' B/BY 20' A | BY 60' C/BY 40' B/BY 20' A | BY 20' B/BY 15' A | R | R | R | R | R | R | R | R Indust. Heavy M-3 | BY 100' C/BY 75' B/BY 50' A | BY 100' C/BY 75' B/BY 50' A | BY 100' C/BY 75' B/BY 50' A | BY 40' B/BY 30' A | R | R | R | R | R | R | R | R [image omitted; see the official code]
(Ord. No. 2354, § I, 1-22-07; Ord. No. 2687, § I(Exh. A), 8-5-13)
Ask a question about Las Cruces law
Corpus searches the Las Cruces sections it holds and shows the ones that match, with their citations. Free, no sign-in.