§ 51.24: MAIN EXTENSION POLICY, INCLUDING SUBDIVISIONS.
New utility service. When an extension of the utility’s water system or wastewater system is required to serve an individual applicant or a group of applicants, an extension shall be made under the following terms and conditions: (A) If the property is within 200 feet of an existing water main line and/or an existing sewer main line, then the water and/or sewer main line shall be extended by and at the expense of the customer from the existing end of service to the property. (B) All water main line extensions shall be sized to provide adequate private water service and fire protection service, including fire hydrants. The minimum water main line size shall be eight inches, although a larger main line size may be required by the utility depending on the unique characteristics of the development. (C) All sewer main line extensions shall be sized to provide adequate wastewater service. The minimum sewer main line size shall be eight inches, although a larger main size may be required by the utility depending on the unique characteristics of the development. (D) The final determination of the water or sewer main line size requirements shall be at the discretion of the Utilities Department. If water and wastewater system master plans or other plans connected with possible future developments require a main line size larger than what is required to serve the applicant’s needs, the difference in cost may be considered for an impact fee credit in accordance with Section 150.34. The utility shall be the sole judge of the proper size, type, material and location of the infrastructure constructed and the actual construction shall be performed under the direct supervision of the city. (E) All costs for construction, engineering, and related activities shall be borne by the applicant requesting the extension. This includes the full cost of constructing the water or sewer main line extensions along with fire hydrants, valves, manholes and all other required appurtenances. (F) Benefitted properties. Properties that are not owned by the applicant that can be serviced by the applicant’s project without the owners of said properties having to construct any additional water or sewer main line extensions. When benefitted properties exist, a water or sewer main line extension pro rata agreement may be established between the utility and the applicant subject to the following: (1) The applicant shall provide the following information to the utility: (a) A list of all benefitted properties and a list of all properties owned by the applicant that are adjacent to the extension. (b) Copies of a minimum of two estimated costs received from contractors and engineers prior to construction and copies of final invoices after completion of construction. (c) After construction, the total amount of linear feet of water or sewer main line installed. (2) A preliminary water or sewer main line extension pro rata agreement shall be prepared by the utility using the estimated costs and signed by both the applicant and the city prior to construction. A final line extension pro rata agreement shall be prepared by the utility and signed by the applicant and the city after construction using the actual costs. All as-built drawings and final costs shall be submitted by the applicant to the city within 90 days from the date stamp on the as-built drawings, no later than 180 days from the completion of construction of the water and/or sewer line extension. Failure to do so shall void the pro rata agreement. (3) The applicant shall comply with all federal, state, and local laws and shall not engage in collusion or perjury. (4) The applicant’s monetary investment shall be subject to future monetary refunds to that applicant in accordance with the terms of the written final water or sewer main line extension pro rata agreement. (5) The pro rata share of infrastructure installed along each benefitted property shall be computed by dividing the total final costs by the number of lots, giving a unit cost per lot that will then be used to assess the benefitted properties. (6) When a water meter is issued to a benefitted property, the final computed pro rata cost will be paid to the utility by the party requesting service before water service will be provided to the benefitted property. This pro rata amount shall then be refunded by the utility to the original applicant. (7) Any benefitted property whose owner or agent does not apply for a water meter within seven years from the date stamp on the as-built drawings received from the applicant is not subject to any pro rata assessment. All remaining investments made by the original applicant shall not be refunded and will become a contribution in aid of construction. (8) If an impact fee credit is given as described in Section 150.34, the pro rata assessment will be calculated using the cost of an eight-inch line size rather than the cost of the line that is actually installed. (9) When an installation must comply with an ordinance, regulation, or specification of a public authority, the estimated and actual construction costs of the infrastructure shall be based on the infrastructure required for compliance. (G) Easements and rights-of-way. All water or sewer main lines installed within the utility’s service area will be constructed within existing public rights-of-way, streets, alleys, or easements unless otherwise specified by the Utilities Department. Water and sewer main lines and other infrastructure shall become the sole property of the utility upon final acceptance of the construction. New customers or applicants who will be installing water or sewer main lines or other infrastructure will furnish such rights-of-way or easements as may be required without charge to the utility. (H) Plans and specifications. (1) The applicant shall follow the most current Design Process Manual, design criteria, and standard details for the city. (2) The applicant shall submit construction plans detailing the infrastructure to be installed prior to construction of any water or sewer main lines or other infrastructure. A licensed New Mexico professional engineer shall stamp these plans. The city will review the plans for compliance with the above-referenced standards. The applicant shall make changes and corrections as determined by the city and the city shall make final decisions as to what infrastructure is installed. Plans signed by the city must be obtained before construction may begin by the applicant.
(Am. Ord. 18-14 )
Ask a question about Rio Rancho law
Corpus searches the Rio Rancho sections it holds and shows the ones that match, with their citations. Free, no sign-in.