§ 51.53 — WASTEWATER DISCHARGE PERMIT APPLICATION CONTENTS
Municipal Code, City of Rio Rancho, New Mexico (Code 2026-04-23) · Rio Rancho Municipal Code § 51.53
Corpus is an independent public-information project, not the official City of Rio Rancho website. Stable reference: corpuslaw.us/code/6718d3a7-052f-4cc2-ac7f-a5bdeca1c67b
§ 51.53: WASTEWATER DISCHARGE PERMIT APPLICATION CONTENTS.
All users required to obtain an individual wastewater discharge permit must submit a permit application. The Director shall approve a form to be used as a permit application. Categorical users submitting the following information shall have complied with 40 CFR 403.12(b). Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. (A) Identifying information. The user shall submit the name and address of the facility including the name of the operator and owners. Additional required information includes: contact information, description of activities, facilities, and plant production processes on the premises. (B) Permits. The user shall submit a list of any environmental control permits held by or for the facility. (C) Description of operations. The user shall submit a brief description of the nature, average rate of production, and standard industrial classification of the operation(s) carried out by such industrial user, including types of wastes generated, a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW; number and type of employees; hours of operation, and proposed or actual hours of operation; each product produced by type, amount, process or processes, and rate of production; type and amount of raw materials processed (average and maximum per day); and the time and duration of discharges. This description should also include a schematic process diagram that indicates all points of discharge to the POTW from the regulated or manufacturing processes; disclosure of site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections, inspection manholes, sampling chambers, floor drains and appurtenances, by size, location and elevation; the location for monitoring all wastes covered by the permit. (D) Flow measurement. (1) Categorical industrial user. The user shall submit information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from each of the following: (a) Regulated or manufacturing process streams; and (b) Other streams as necessary to allow use of the combined wastestream formula of 40 CFR 403.6(e). The formula used must be approved by the Director. (2) Noncategorical industrial user. The user shall submit information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from each of the following: (a) Total process flow, wastewater treatment plant flow, total plant flow or individual manufacturing process flow as required by the Director; (b) The city may allow for verifiable estimates of these flows where considerations are justified by cost or feasibility. (E) Measurements of pollutants. (1) Categorical industrial user. (a) The user shall identify and measure the categorical Pretreatment Standards applicable for each regulated process for existing sources. In addition, the user shall submit the results of sampling and analysis identifying the nature and concentration and/or mass, where required by the standard or as required by the city of regulated pollutants (including standards contained in Sections 51.34 through 51.37, as appropriate) in the discharge from each regulated or manufacturing process. Instantaneous, daily maximum and long-term average concentration, or mass, where required, shall be reported. The sample shall be representative of daily operations and shall conform to sampling and analytical procedures outlined in Sections 51.75 through 51.77. In cases where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the Control Authority or the applicable standards to determine compliance with the standard. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this section. (b) Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e) for a CIU covered by a categorical Pretreatment Standard, this adjusted limit, along with supporting data, shall be submitted as part of the application. (2) Noncategorical industrial user. (a) The user shall identify the applicable pretreatment standards for its wastewater discharge. (b) In addition, the user shall submit the results of sampling and analysis identifying the nature and concentration (or mass where required by the city) of regulated pollutants contained in Sections 51.34 through 51.37, as appropriate, in the discharge. Both daily maximum and average concentration (or mass, where required) shall be reported. The sample shall be representative of daily operations and shall conform to sampling and analytical procedures outlined in Sections 51.75 through 51.77. (c) The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this section. (d) Where the Director developed alternate concentration or mass limits because of dilution, this adjusted limit, along with supporting data, shall be submitted as part of the application. (3) All samples shall be taken in accordance with the requirements of Sections 51.75(A) through (C). (F) Certification. A statement, reviewed by an authorized representative of the user and certified by a qualified professional as outlined in Section 51.54, indicating whether the applicable pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the user to meet the applicable pretreatment standards and requirements. All plans required to accompany the application must be certified for accuracy by a state registered professional engineer. (G) Compliance schedule. If additional pretreatment and/or O&M will be required to meet the applicable pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M must be provided. The user’s schedule shall conform to the requirements of Section 51.66. The completion date in this schedule shall not be later than the compliance date established pursuant to Section 51.42. (H) Any other information as may be deemed necessary by the Director to evaluate the wastewater discharge permit application.
( Ord. 06-74 ; Am. Ord. 18-14 . Formerly 51.52 )
Ask a question about Rio Rancho law
Corpus searches the Rio Rancho sections it holds and shows the ones that match, with their citations. Free, no sign-in.